After testing, the missile is transferred to the ordnance building. The building consists of an office building, Harpoon Missile-Body-building, the All-Up-Round building, and five remote storage magazines at
5:28. Office is separate from the assembly area with a long tunnel with two 90-degree turns at
6:05. The missile assembly building is equipped with pneumatically controlled tools for safety at
6:15. Within the HMB portion, the missile body is assembled and tested at
6:48. Tests are done by remote control, and monitored by closed-circuit television at
7:32. When completed, the missile is transferred to the All-Up-Round building, either as shipment as an HMB or for buildup into an AUR configuration at
8:12. Harpoons for submarines require a booster motor. The booster motor is shown being assembled at
8:24. The completed Harpoons are stored in the storage magazine before shipment at
9:03. Commercial trucks transferring missiles to naval stations at
9:15. The Douglas facility also contains a depot and repair facility at
9:42. A failure analysis is conducted here to determine which system needs replacement at
9:59. Film ends at
10:54)