The Submarine industrial base will receive a further $6.2 billion across the FYDP, designated towards growing production capacity to at least one Columbia and 2 Virginias every year via supply chain stabilization and workforce growth. An additional $7.2 billion allotted to Nuclear Shipbuilder productivity enhancement in the same period could also help to achieve desired rates.
Need to speed that up, but the article does mention a max of 5 boats delivered in one year in 2039.
 
View: https://x.com/ChurchillWw/status/2062883069665649029?s=20


https://www.austal.com/ships/submarines
Since 2022, our team in the USA has been a key partner in advancing the United States Navy’s submarine production capacity through the fabrication and outfitting of critical module components for both the Virginia-class and Columbia-class programs. Working in strategic partnership with General Dynamics Electric Boat (GDEB), we play a vital role in strengthening the Submarine Industrial Base (SIB) and enhancing America’s undersea deterrence capabilities.
 

Department of War Awards Historic Shipbuilding Contract to Cement Undersea Dominance​

https://www.navy.mil/Press-Office/P...hipbuilding-contract-to-cement-undersea-domi/
WASHINGTON – Today, the Department of War expanded its undersea warfighting capabilities by awarding a five-ship contract modification to General Dynamics Electric Boat (GDEB) for the construction of five Columbia Class ballistic missile submarines (SSBNs), a nine-ship contract to GDEB and HII-Newport News Shipbuilding (HII-NNS) for the construction of Fiscal Year (FY) 2025 through FY 2029 Virginia Class submarines, and previously awarded shipyard productivity efforts to the two companies. These awards represent a historic investment in maritime modernization and supremacy, with a combined total value of $76.6B
 
Finally an X-stern on a USN production combat submarine. It only took 65 years (Albacore's x-stern was added in 1960).
 
It would just be cheaper refurbish the Ohios
Unfortunately, that just isn't possible. I worked the SSGN tech-refresh and some of the kit in these antiques is so old that elements of it are effectively unobtainium. You'd literally have to engineer clean-sheet drop-in replacements.

Add to that the time and effort of chopping the boat apart to get all that stuff replaced and you're spending way more than newcon. It simply isn't economically viable.
 
I wonder about the metal fatigue of the hulls. Theyve had a better innings than most Atlantic/North Sea ships that really suffer hull degradation and marginally better than the average Pacific ship. But the hulls must be full of microfractures by now.
 
I wonder about the metal fatigue of the hulls. Theyve had a better innings than most Atlantic/North Sea ships that really suffer hull degradation and marginally better than the average Pacific ship. But the hulls must be full of microfractures by now.
Way back in the day, the boats were put under a microscope because of the treaty limiting the US to 14 SSBNs. I'm talking X-rays, samples, whole 9 yards of inspections.

That showed that the oldest 4 boats still had 20something years of hull life left, and the USN didn't want to get rid of 4 boats or 8 crews. Hence Ohio SSGN proposals and "Hey, Russia, what will you accept for proof of removal from strategic service?"

So the USN wrote up a 20 year core refresh instead of a ~15 year core refresh like the 688s usually got, and physically ripped out the old Missile Control Center and Navigation Center, replacing MCC with a big SOF room and turning half or more of Nav Center into a SOF mission planning space. Plus ripping out the old strategic-nav ESGNs for the F-18 surplus RLGNs.

By today, though, I would be deeply suspicious of any of the 726-class hulls. Yeah, they're keeping water out of the people tank, but I'd be willing to bet that their max dive depths have been getting restricted.
 