The project started in 1958 and ended in 1960. There was no prototype, only a fourteen-meter long test ship(Lead-acid batteries,speed 9 knot)
Planned displacement 400~500 tons,four torpedo tube,speed 25knot with zinc-silver battery and deltaic diesel engine
China built a new 032 submarine in 2005
https://weibo.com/ttarticle/p/show?id=2309404550180769759235https://www.thepaper.cn/newsDetail_forward_1347024#p=1
Last edited: