- Joined
- 16 April 2008
- Messages
- 10,588
- Reaction score
- 18,127
We're never seeing this paper lmao.
How is it this complicated?
We're never seeing this paper lmao.
Money and where to get it...How is it this complicated?
Then the UK is in breach of the GCAP program agreement.We're never seeing this paper lmao.
There's clearly some kind of Cabinet power struggle going on, with MoD wanting their funding black hole covered, and the Treasury/Rachel Reeves being unwilling to fund it. Someone should have banged heads together a year ago and told them to fund it as a national priority, but that hasn't happened.How is it this complicated?
The sarcastic humour in that simulator is the cherry on top.https://singular-faloodeh-dea45f.netlify.app/
This has been doing the rounds on Twitter, a DIP simulator tool. Pick how much of the budget you want to allocate to each funding line, how fast you want spending to ramp up, and the strategy you present to the public.
I managed 85/100 on 3.5% with this:The sarcastic humour in that simulator is the cherry on top.
I had a little mess around, and to be fair to the government, getting it to just a £28b shortfall whilst managing every capability is difficult.
I had a go, but there's literally no way of getting everything that most people expect without an increase in funding.I don't dare try 2.6%, I think the best way there would just be to screw the army over but even then it doesn't save much money.
I agree. We know that without a drastic increase in spending the government has a choice between committing entirely to Hybrid/20-40-40/CCAs and trying to increase numbers of manned platforms. They can't do both and yet there are repeated leaks saying that T83 has been pushed back or the £18Bn won't all be spent on drones or whatnot. Sorry MoD folk, one of them is going to have to be true.Honestly, these constant leaks are doing more harm than good at this point. In the space of about two weeks, they've started to appear almost daily.
Outlets have discovered that in this uncertain period, they can essentially post whatever they want, so long as it's prefixed by 'Rumours say:'.
Now, the Telegraph has just published a story claiming that funding for Tempest will only arrive in the 2030s. With not even the vaguest waft of a source attached.
I've contributed my fair share to the sharing of the leaks and 'stories', but I think the end result will be that the DIP arrives having been judged by impossible standards. Something is going to get cut, and whatever it is, people are going to whine about it in the MSM.
Probably, but the week after Healy has a NATO summit meeting, so politics would be handy for him to have it actually out by then. This time the Telegraph is saying "industry" is briefing that they are fairly sure.TBF, it was the Telegraph that said it'd be the 1st of June as well. I'm sure if the June 11th date is incorrect, then they'll publish something else claiming June 22nd, or something.
Surely it would be the 21st in that case?TBF, it was the Telegraph that said it'd be the 1st of June as well. I'm sure if the June 11th date is incorrect, then they'll publish something else claiming June 22nd, or something.
Politically, it will be exceptionally difficult for Healy to go to Ankara without DIP agreed.Probably, but the week after Healy has a NATO summit meeting, so politics would be handy for him to have it actually out by then. This time the Telegraph is saying "industry" is briefing that they are fairly sure.
Which then leads to pretty massive pressure from the GCAP partners over UK not paying for their share as agreed (because the UK doesn't have a signed DIP).More cynically, of course, that sentence could end '...the NATO summit made it obvious that we needed to reprioritise, so there'll be another year's delay while we do more studies.'
Speaking of which, the FT is reporting that as part of the horse trading, Treasury is apparently trying ot take over management of the UK's side of GCAP claiming that the MOD has proven incapable of managing such complex projects.Which then leads to pretty massive pressure from the GCAP partners over UK not paying for their share as agreed (because the UK doesn't have a signed DIP).
And I suspect that there are some enforcement terms in the agreement, after the experience with Typhoon.
Another reason to assume that the announcement is "soon" is that the Japanese PM is visiting at the end of June so the funding question has to be sorted by then.As part of the deal to inject fresh funding, the Treasury is proposing to take control of the spending on the programme, people close to the situation said.The department is poised to justify the move in part by pointing to the complexity of the programme and its structure involving international partners, and in part by pointing to the MoD’s dismal record of cost overruns on big military projects.One Whitehall figure said the MoD is viewed as having a “delinquent” attitude towards taxpayer cash and achieving value for money.Reeves fears GCAP is “just the next HS2”, another government figure said, referring to the high-speed railway that has been hit by soaring costs, extensive delays and a shrinking scope. The person claimed there was “fundamental disagreement” about the fighter jet programme between the prime minister and Reeves, although a person close to the chancellor denied the characterisation.The Treasury’s push for control would involve it having greater oversight, although some government figures said the programme’s international structure and the status of external contracts will make spending hard to rein in.The arrangement is not finalised as negotiations over the DIP continue.Officials said there was a push to announce the DIP as soon as next week, with June 11 mooted as a target date.If the extra defence expenditure is confirmed as roughly £15bn, it will entail significant cuts to planned military programmes, which are facing a funding gap of £28bn over the next four years.The government’s internal projections for the cost of GCAP have spiralled and some British officials believe delivery is likely to slip beyond the date pinpointed when the three countries announced plans to develop a joint stealth fighter in December 2022.Under the plans, London, Tokyo and Rome have pledged to have a fighter in service by 2035. Industry executives insist it is on track to meet the deadline.One option, according to two industry figures, could involve designating GCAP as one of the government’s “mega projects”, those deemed to be critical to delivering on the UK’s strategic priorities.HS2 and Dreadnought, the successor to the Trident nuclear programme, are among the mega projects and are overseen by a cross-government governance board that tracks major milestones.It would also involve enhanced support from the National Infrastructure and Service Transformation Authority, an agency that sits within the Treasury and Cabinet Office, under this option, according to a government figure.
Yep.Frankly if this is real, it's a major criticism of Mk41 and Sylver .....
It's not great for crewed ships either and speaks of current systems being designed decades ago.Yep.
An inability to just sit in a ready state for a month is not good for 2XL-USVs intended to be offboard missile magazines.
I think it wouldn't be too difficult for the Navy to go to whoever controls the taps and say that since they need a new VLS for the new unmanned ships anyway it wouldn't cost too much to replace Mk41 entirely and so free us from American whims over integration etc. Given the wider emphasis on lean crewing it might be good operational sense for T83, too, to have near-zero-maintenance VLS silos.A silo system needs to fit those tougher criteria to justify funding. Otherwise it's subject to the question "why reinvent the wheel".
But a solid 'business case' could be made in partnership with industry for such.
Since the 'wheel' here offers reduced maintenance, integration costs and remains available for immediate operation.
Which frees the UK and domestic industry from reliance on foreign systems.
But crucially the why question remains and the only logical answer is current foreign systems come with higher 'cost' than mere finance. Likely integration of weapons costs and availability of supply, plus 'hidden' political costs.....and delays.
Frankly if this is real, it's a major criticism of Mk41 and Sylver .....
A family of exchangeable silos that could take a single hypersonic/ballistic weapon, 4 Aster/Stratus, 9 CAMM-MR or 16 CAMM/CAMM-ER would be pretty neat, wouldn't it?A hexadecimal division?
Even the mushroom farms need their caps taken off before firing, if towed sonar can be deployed from an unmanned vessel I think we can make mechanical lids that don't require much maintenance. We would sacrifice the reaction time of Sylver, though.Full circle back to the advantage of the Mushroom Farms with simple rubber seals over cells with mechanical covers that need to be maintained every two weeks or so.
I think Greg Bagwell said on Twitter that it ought to be thought of an insurance policy for those departments. Pay 1% more, avoid paying significantly more in the long run.Latest from the Times this time is that No.10 is still talking over the weekend to decide funding, with reports that the other departments will face a 1% cut to Capital spending to fund the Defence spending.
https://archive.ph/keBHR
For the best if true.Telegraph has a new angle, that the 35A's might be cancelled or delayed as part of the back and forth that is still going on, even though they think the DIP is to be released on Thursday.
I just figured the RAF wanted the A's in order to screw the RN over lack of B's for the Carriers.F-35A is insufficient in numbers currently planned for anything but a inadequate force for inadequate delivery of duel key American nuclear weapons.
Not enough to be serious.
Not enough for any military effectiveness.
But enough to impose extra costs beyond the F-35B fleet.
They won't operate from the carriers and they won't be carrying anything but American weapons we'd have to buy.
So one might cynically assume the RAF chose to swap a limited number of F-35B for an even more limited number of F-35A. Knowing they could offer it up as sacrifice to keep other programs going.
One suspect that the Army may yet have to give up on Ajax without replacement.
And the Navy's grand plans for a monster Type 83 and over specificationed LUSVs may also be offered up to the god of 'savings'.
Stratus pair might yet get pushed back....it's a saving now. Especially as SCALP/Storm Shadow production is restarted.
I'd also expect the Army's glorified Landrover replacement from Germany may yet feel scrutiny too.
Isn't the current thinking that it'll be just Stratus LO for the UK, and just Stratus RS for the French? There seems to have been some fracture since the days of 'both nations will buy both missiles'.Stratus pair might yet get pushed back....it's a saving now. Especially as SCALP/Storm Shadow production is restarted.