Titus K
ACCESS: Top Secret
- Joined
- 6 September 2025
- Messages
- 862
- Reaction score
- 2,928
Interesting… that kind of information is never leaked by chance. It suggests an underlying motivation, possibly a disagreement between the Swedish Navy leadership and their political masters around whether to prioritize capability & timeline vs industrial questions (such as supporting Saab).there's an article suggesting the Swedish Navy is leaning FDI for their new Frigate as the French are offering one of the built ones as the first ship
The French shipbuilder is very confident they will deliver the first ship in 2030
I learned the SAM configuration for the "Swedish FDI" consists in 24x Aster 30 + 24x CAMM-ER (cold launched from a new launcher developed in-house by Naval Group)
Needs more Aster 30. At least another 12, if not 24."I learned the SAM configuration for the "Swedish FDI" consists in 24x Aster 30 + 24x CAMM-ER (cold launched from a new launcher developed in-house by Naval Group)"
Not possible, the hull is smaller than a National Security Cutter.Needs more Aster 30. At least another 12, if not 24.
Do you think Naval Group could introduce a stretched "FDI Evo" down the line, or would this conflict with the FREMM within the Portfolio?Not possible, the hull is smaller than a National Security Cutter.
Based on other frigates of the size, I don't think the hull is big enough for anything beyond the 32-cell VLS and single hangar it will already have. They will have basically the same armament as the French FREMM. The Italians are still building their FREMMS, but no French FREMM has been laid down since 2019. I don't think Naval Group is really pushing anything that big for the French export market.Do you think Naval Group could introduce a stretched "FDI Evo" down the line, or would this conflict with the FREMM within the Portfolio?
I personally feel like the FDI still offers a lot of growth potential. Or maybe it's already exactly what Naval Group and the Marine Nationale want out of it (something between an FFG and a OPV).
NG isn't really offering the FREMM anymore, at least not build in Lorient. The entire shipyard is now optimized for FDI production of up to 3 ships per year if other yards help build some of the hull blocks.Do you think Naval Group could introduce a stretched "FDI Evo" down the line, or would this conflict with the FREMM within the Portfolio?
According to an FMV release, the Luela-class will be fitted with several Swedish systems, including RBS15, Torpedo 47, Giraffe 1X, 57mm and 40mm naval guns, as well as Trackfire. FMV added that air defense and anti-submarine warfare are two core capabilities for the new frigates.
Deliveries are planned to take place between 2030 and 2034:
- HMS Luleå – 2030
- HMS Norrköping – 2032
- HMS Trelleborg – 2033
- HMS Halmstad – 2034
I think you are looking at the CAMM uplink. Presumably there is a 2nd one to the rear.
- A strange cone above the bridge
Interesting set of markings below the chine, at least some of which are also visible on Amiral Ronarc'h
Interesting set of markings below the chine, at least some of which are also visible on Amiral Ronarc'h
Has anyone seen a video of an FDI in heavy seas yet? I'm curious how that bow shape works.
It is!I can't easily find photos, but Naval Group says she was able to sustain 20 knots in Sea State 7. That's pretty respectable.
Post nº161 in this thread (on top of this page) is the first of class Amiral Ronarc'h sailing in the Norwegian Sea in February 2026.Has anyone seen a video of an FDI in heavy seas yet? I'm curious how that bow shape works.
According to information from OnAlert, the test is expected to be conducted in cooperation with the French Navy and the relevant services of the French Directorate General of Armament (DGA), at the DGA Essais de missiles – Méditerranée test range, centered around Île du Levant, off Toulon.
...
Joint firing exercises by the Hellenic Navy and the French Navy
Of particular interest is the fact that the Hellenic Navy is expected to conduct an Aster 30 firing from the frigate “Kimon” in cooperation with the French Navy, which will in turn carry out the same type of test with the first French FDI, the Amiral Ronarc’h.
The first French frigate of the class was delivered to the French Navy on 17 October 2025 and is currently undergoing the process of full operational certification. However, it has not yet conducted its first live Aster firing.
The test was initially scheduled for December 2025 in the Île du Levant area, but it was postponed because the French decided to implement a more complex and demanding scenario.
A new window had been considered for April 2026, but the deployment of a large number of French assets due to the crisis in the Middle East led to another postponement. According to the latest information from French sources, a new window is now being sought in the coming months, which confirms OnAlert’s reporting regarding joint firings with the Hellenic Navy.
View: https://x.com/VincentLamigeon/status/2105236463075967481One month after the signing of the contract for 4 FDI frigates with Sweden, the Naval Group site in Lorient is already cutting steel plates for the first ship, the Lulea. Delivery scheduled for the end of 2030.
...
A block of hull delivered by the Greek Salamis. Naval Group very satisfied with the quality of the elements delivered by the Greek shipyard
“We still have four delivery slots available between now and 2034,” assures Vincent Martinot-Lagarde. He firmly rejects the rumour — likely fuelled by competitors — that the Lorient shipyard is operating at full capacity and can no longer accommodate new contracts.
“We can deliver to new customers within the agreed timeframes, and even reduce lead times to less than three years,” the director insists.
This is made possible through advance planning: “Lorient applies the ‘white hull’ principle, with vessel customisation carried out as late as possible. It is an adaptation of the aerospace industry’s model: manufacturers produce ‘white tails’ (aircraft with their fuselage, wings and all other common components, ed.) before incorporating customer-specific requirements during the final assembly stage,” explains a source close to the group.
The first Swedish FDI will therefore follow in 2030 but, thanks to the early order of a fifth frigate by France this year, Naval Group is able to deliver another unit in 2030. The French shipyard is indeed competing in several other markets, especially in Denmark, where it will also be necessary, in case of victory, to start deliveries from 2030.
There is an option called jumboisation, essentially a 9 m hull plug inserted amidships to stretch the ship to 130 m.
NG brought it up again last year -> https://www.meretmarine.com/fr/defe...-livrer-sa-premiere-fdi-a-la-marine-nationale
You could add some VL MICA or 2x24 CAMM Launchers and keep the front 32 VLS cells for Aster/Aquila/NCM… they also mention 2 Rapidfire 40mm on each side.
View attachment 817132
Regarding size, Naval Group asserts that the FDI packs firepower and combat survivability equivalent to that of a larger ship into a 120-meter vessel. That hasn’t stopped the group from considering larger versions, with details on the subject expected at the Euronaval show in November.