(i still hope they'd replace upper irst with something else, for aesthetics only)
come to think of it, it ain't quite as bad as it was on graphics.
screenshot-2025-12-31-182110-png.796977
 
I see so, just P0 and P1 plus the Iron Bird for static tests. No P2 present just yet.
That should be the case. Tolga Özbek confused it with P2, but TAI doesn't give Iron Birds "P" designation. I mean, look at Hürjet or Gökbey. The Iron Birds were built before the second prototypes and didn't receive a "P" designation.
 
Guys... The main landing gears are now side-mounted.

Static Prototype (1) VS GTU-0/P0 (2)

This would also require a fairly substantial internal redesign...

EDIT: GTU-0 on the right below, the new static prototype on the left.
 

Attachments

  • 1000081548.jpg
    1000081548.jpg
    346.7 KB · Views: 252
  • 1000081549.jpg
    1000081549.jpg
    23.1 KB · Views: 233
Last edited:
View attachment 801908
@snne Good catch. Lol, such an obvious change, but we didn't notice it. The gears are also much beefier. Also, no more double chin.
The gears are the same. But yeah, when I first noticed it, I was like, “How the heck did we miss this detail?” :D I mean, you could see the difference in the aircraft’s stance, for crying out loud...
 

Attachments

  • 1000081559.jpg
    1000081559.jpg
    463.7 KB · Views: 253
Last edited by a moderator:
Fascinating development. Really.
Does the start date for the TF35000 prototype tests remain this year?
Initial tests only, not the full engine assembly.

It’s currently in CDR. They’re following a strategy similar to the Kaan fuselage development approach, i.e. producing and testing components while the Critical Design Review phase is still ongoing. Single engine integration on a prototype in 2028 still seems possible, albeit on a somewhat tight timeline.
 
Last edited:

Attachments

  • 1000081635.png
    1000081635.png
    1 MB · Views: 174
  • 1000081636.png
    1000081636.png
    920.4 KB · Views: 134
Last edited by a moderator:
Is there a higher-resolution image available? Devil's in the details and the new prototype is so detail-rich that such low-resolution comparisons do not do justice to how much more advanced it is...

They moved the EOTS forward.
 

Attachments

  • MMU P0 Hangar.jpg
    MMU P0 Hangar.jpg
    150 KB · Views: 129
  • MMU P1 Hangar.jpg
    MMU P1 Hangar.jpg
    1.3 MB · Views: 140
Last edited by a moderator:
Is it just an appearance, or is the canopy really higher?
Looks that way, but the canopy and the rest of the cockpit section are the same; it's just the camera perspective making the dimensions appear different.

Aerodynamic optimization to increase body lift. Kaan P1 looks like it will generate more lift from the body vs P0. Approaches Su-57 level body lift. Much better than the Raptor.
Indeed, the wings are small compared to other 4th/5th gen heavy-lifters (even with its 3 pylon slots). In a non-stealth A-G configuration, I’d imagine cruise missiles would take up a significant portion of the available underwing real estate, given how short the span is from the wing root to the tip.

Also, ICYMI; the flap-aileron placements are different as well.
 
Initial tests only, not the full engine assembly.

It’s currently in CDR. They’re following a strategy similar to the Kaan fuselage development approach, i.e. producing and testing components while the Critical Design Review phase is still ongoing. Single engine integration on a prototype in 2028 still seems possible, albeit on a somewhat tight timeline.
CEO of TAI had an interview a couple days ago:

Now, Kaan's engine, as you know, is being developed in collaboration with TEI and TR Motor. Yes. The PDR phase was completed last week. We moved on to the CDR. This was an important phase. In other words, the design has emerged. What will it be like? What will be there? What will be placed where? What interfaces will affect the interior design of the aircraft, its weight, power, etc. These are now frozen as a concept. One of them has been chosen, and this is the stage where the final design details are started. This takes approximately 1 to 1.5 years. In the meantime, sometimes risks are taken, and parts and systems that will take a long time to procure are worked on beforehand, and quickly, I think, we plan to start the first prototype tests in the 2028-29 range. So we will put it on the aircraft in the 2029-30 range. It's progressing fast right now, but we need to speed up even more.
 
we plan to start the first prototype tests in the 2028-29 range. So we will put it on the aircraft in the 2029-30 range.

TF6000 first firing was in 2024 and its first flight is in 2028 earliest(from TAI CEO).

The 2029-30 for aircraft integration of TF35k is just integration, not first flight. The FF of the engine is expected in 2032.
 
TF6000 first firing was in 2024 and its first flight is in 2028 earliest(from TAI CEO).

The 2029-30 for aircraft integration of TF35k is just integration, not first flight. The FF of the engine is expected in 2032.
2032 is the official certification deadline, as it is written into an actual contract to deliver B30 aircraft with TF35k engines starting in 2032.

He is saying that integration will occur in the 2029 to 2030 timeframe. That does not mean flight testing will begin immediately, as several months of ground testing on aircraft will be required first. A +/- two year test campaign leading up to certification and LRIP commencement in Q2-Q3 2032 would be a reasonable timeline if there's to be no major delays. (Albeit some things would get rushed, such as ground testing)

All engines mature as they enter operational service, with reliability improving over time throughout their service life. Neither the F110, F119, nor the F135 were as reliable or as refined at entry into service as they are today.
 
Last edited:
2032 is the official certification deadline, as it is written into an actual contract to deliver B30 aircraft with TF35k engines starting in 2032.

He is saying that integration will occur in the 2029 to 2030 timeframe. That does not mean flight testing will begin immediately, as several months of ground testing on aircraft will be required first. A +/- two year test campaign leading up to certification and LRIP commencement in Q2-Q3 2032 would be a reasonable timeline if there's to be no major delays. (Albeit some things would get rushed, such as ground testing)

All engines mature as they enter operational service, with reliability improving over time throughout their service life. Neither the F110, F119, nor F135 were as reliable or as refined at entry into service as they are today.
2032 for the first delivery of the engine is no longer true. It's been pushed back by a year. The new target is 2033.

View: https://x.com/KaraKulak__/status/2022352604844691823
 
TLDR for recent updates regarding both the F110 and the TF-35000:

On the F110 supply:
and we are currently in the final stage of the approval process.

We will likely receive approval for the first batch of blocks 10 and 20 this month, or perhaps next month

On the TF-35000 development status:
The PDR phase was completed last week. We moved on to the CDR.

This takes approximately 1 to 1.5 years. In the meantime, sometimes risks are taken, and parts and systems that will take a long time to procure are worked on beforehand, and quickly, I think, we plan to start the first prototype tests in the 2028-29 range. So we will put it on the aircraft in the 2029-30 range. It's progressing fast right now, but we need to speed up even more.
 
Last edited:
I could’ve sworn that the vertical slabs got moved to tail booms on P2… Either it’s my personal Mandela Effect or I got it confused with a model showcased at a defense fair…
No, that was never in question. It was only noobs on Twitter with large followings insisting on that change, projecting their own wishcasting as if it were fact.

1000082833.png

What the officials actually mentioned was a small change to the intakes and dimensions. As you can see, the intakes' splitter-plates have holes to discharge the boundary layer flow now; and the aircraft looks noticeably sleeker and more refined.


Those fools took it at face value without any critical thinking and ran with it due of their lack of experience and knowledge, as well their populism.
 
Last edited:
No, that was never in question. It was only noobs on Twitter with large followings insisting on that change, projecting their own wishcasting as if it were fact.

View attachment 802306

What the officials actually mentioned was a small change to the intakes and dimensions. As you can see, the intakes' splitter-plates have holes to discharge the boundary layer flow now; and the aircraft looks noticeably sleeker and more refined.


Those fools took it at face value without any critical thinking and ran with it due of their lack of experience and knowledge, as well their populism.
I wouldn't throw shade at anyone when you, yourself, was adamant that there would be no changes to the intake of the KAAN. Even when the GM was saying that there would be changes :p you still disagreed with GM. lol

I could’ve sworn that the vertical slabs got moved to tail booms on P2… Either it’s my personal Mandela Effect or I got it confused with a model showcased at a defense fair…
Probably the mock-up, which regardless of being an old mock-up and not being true to form - is still displayed outside TFX office

1771274854535.png
 
Last edited:
I wouldn't throw shade at anyone when you, yourself, was adamant that there would be no changes to the intake of the KAAN. Even when the GM was saying that there would be changes :p you still disagreed with GM. lol
People were claiming it would receive DSIs, for goodness’ sake.

Did the intake shape change? Did the ducts change? No. They simply added a discharge system to replace the old, non-stealth spill duct; which is honestly more or less what I expected all along based on how other advanced aircraft with caret intakes are configured.

I wouldn’t have been surprised by minor tweaks to the intake edges or corners either, but my position was always that any major intake design change would require a dramatic duct redesign, which would have practically meant conducting the CDR from the beginning all over again...
 
I could’ve sworn that the vertical slabs got moved to tail booms on P2… Either it’s my personal Mandela Effect or I got it confused with a model showcased at a defense fair…
I think the position on the nacelles is necessary to ensure that they wouldn't be directly hit by the vortices of the LERX.
 

Similar threads