Yes so lets LOWER the standards shall we? Shit like this happens in peacetime so that it can be rectified for wartime. The answer is not lowering standardsThe USN itself doesn't disagree with this, look at the inquiry into the Bonhomme Richard loss. The entire capability of a major naval base at their hands and they couldn't stop a fire that shouldn't have resulted in the loss of the ship.
List those failures which are a result of "higher design standards". You will likely say Zumwalt, which was predominantly due to the generational leap in technology leading to a complex integration process. NAVSEA declared that this remains the most effective way to push generational upgrades to the fleet. You will then try to say LCS of which standards had very little bearing.The USN's supposed higher design standards have produced a generation of failures, it's 35 years since a new combatant class was introduced without critical problems. Standards so strict they can't be met are not fit for purpose, just as much as ones that are too slack.
That's not an escort, it's a target. It needs escorts to survive.Crazier idea... Make an ASW version of the San Antonios. The well deck can be used for ASW drones, and the vehicle deck replaced with a hangar deck for more helos (6-8). Towed arrays can be deployed on the drones. Make a new quad box (Harpoon-syle) launcher for ASROC and strap a couple on the deck. Twice the cost of a Constellation but far greater ASW capability.
This is a similar problem to the ocean escort problem after WW2. In WW2 a Loch class frigate was the most cost effective ASW escort. Faster subs means that escorts would need to be faster and more expensive. The problem was solved with SOSUS, planes, sonobuoys, helicopters, etc. Now, the minimum AAW suite is much higher than it was before antiship ballistic missiles. This is a very expensive problem to solve.I wonder if the Constellation concept might be flawed not because it is too capable, but because it is not capable enough. Specifically, in BMD. The Houthi are a 4th rate adversary, at best, yet they were slinging ballistic missiles. Would the Constellation (or two) even be deployed to the Red Sea to defend shipping without a Burke present to perform BMD? Which missions could a Constellation take on where the opponent might be deploying subs, cruise missiles and aircraft, but not ballistic missiles? The Constellation might have been a capable sensor-shooter-ASW as part of a SAG or CSG, but I'm doubtful it would have done many serious missions on its own in wartime.
The best escorts in WWII where the CVEs. Im merely proposing the modern version of them, one that can also carry drone DEs to augment the escorting forces.That's not an escort, it's a target. It needs escorts to survive.
Yes so lets LOWER the standards shall we? Shit like this happens in peacetime so that it can be rectified for wartime. The answer is not lowering standards
You can have numbers or bleeding edge, even the US can't afford both. The problem is whenever it tries for bleeding edge it ends uo with neither. Of the post-Burke combatant classes:List those failures which are a result of "higher design standards". You will likely say Zumwalt, which was predominantly due to the generational leap in technology leading to a complex integration process. NAVSEA declared that this remains the most effective way to push generational upgrades to the fleet. You will then try to say LCS of which standards had very little bearing.
Your argument is ridiculous, standards written in blood have proven it
I think you are on to something. An ASW command ship that send out UUVs, USVs, UAVs and helps and can coordinate surface ships on the hunt.The best escorts in WWII where the CVEs. Im merely proposing the modern version of them, one that can also carry drone DEs to augment the escorting forces.
CVEs were best escort enablers, but by themselves they were escortees and couldn't escort anything - and not just that, they were juicier targets than most of their convoys.The best escorts in WWII where the CVEs. Im merely proposing the modern version of them, one that can also carry drone DEs to augment the escorting forces.
In principle it is. But it will be already a 3rd layer for sea control force, when USN can't get a grip on 1.I think you are on to something. An ASW command ship that send out UUVs, USVs, UAVs and helps and can coordinate surface ships on the hunt.
Oh, I'm not talking about using new-build Burkes for ASW.IMHO, upgunned LCS would be better for frigate role. One important reason - it would NOT affect Burke's production, and LCS hulls could be produced in significant quantity.
That is my concern as well.I wonder if the Constellation concept might be flawed not because it is too capable, but because it is not capable enough. Specifically, in BMD. The Houthi are a 4th rate adversary, at best, yet they were slinging ballistic missiles. Would the Constellation (or two) even be deployed to the Red Sea to defend shipping without a Burke present to perform BMD? Which missions could a Constellation take on where the opponent might be deploying subs, cruise missiles and aircraft, but not ballistic missiles? The Constellation might have been a capable sensor-shooter-ASW as part of a SAG or CSG, but I'm doubtful it would have done many serious missions on its own in wartime.
Which tells us what we should expect for DDGX, though that is a separate thread.Cruiser Baseline/CGBL - Not an actual ship, a model of what happens if you try to create a CG version of a Burke - 13,500t.
The problem with VGAS was that at the time it was incapable of hitting targets within something like 14nmi of the ship. So a ship fitted with VGAS would have needed a second gun system.DD-21/21st Century Land Attack Destroyer - spawn of Littoral Combatant and the Arsenal ship. Yes, it was stuck within SC-21 and 'Forward - From The Sea', but that should have forced people to realise they needed two separate classes, one fitted for naval gunfire support, one for stealthy open ocean work, not try and squish them both in the same hull and compromise the exquisitely expensive stealth capability. Meanwhile let's take VGAS and squeeze it into a conventional turret, compromising the innovation that gives it its extreme range, while simultaneously designing it to be incompatible with existing ordnance, and only capable of using a round whose costs don't scale affordably. 256 VLS cells wanted. 2000 - this isn't risky enough, lets add IEP. *headdesk* (32 wanted, dead by 2001)
Doing all the bullshit to prepare for an INSURV absolutely is burdensome.Ford Class - Axing SPY-4 from the Zumwalts means Gerald R Ford will be the only ship with Dual Band Radar. Even John F Kennedy has the Enterprise Air Search Radar instead. EMALS teething issues are understandable, weapons elevator problems less so. Just don't mention that the toilet piping is too narrowIt's interesting to note the USN tried to delay shock trials by six years, again demonstrating that even the Navy hierarchy sees its own construction standards as burdensome and something to be worked around.
FFG(X)/Constellation - Apparently no one noticed the minor contradiction between "Let's build an in-service foreign design so we can build it quickly and cheaply" and "Let's insist every aspect of the ship matches NAVSEA standards exactly (no one mention we gave LCS a waiver and wanted one for Ford)".
SC-21 3B1/Power Projection Ship/Littoral Combatant - initially 2xVGAS + 128 VLS, became 1x5" + 128 VLS. The whole point of the Littoral Combatant was extended duration naval operations off the Norwegian coast. Didn't it occur to anyone that maybe they should re-evaluate the entire mission given the collapse of the Soviet Union 8 years previously? Assessed unfavourably vs the Burkes and decision made to put the innards in a new hull leading to DD-21 (1997)
Hmm, I wonder what may have changed to make Seawolf no longer needed...Sea Wolf - unaffordable, stopped at three.
Ok and? It was a study, what's your pointCruiser Baseline/CGBL - Not an actual ship, a model of what happens if you try to create a CG version of a Burke - 13,500t.
Another study, what's your point?Mission Essential Unit/CG VSTOL - CG weapons suite + 12-20 SV-22s, 25ktons, intended to operate independently. Probably just as well it went no further with that CONOPS.
Another study, what's your point?SC-21 - Let's completely revise the surface fleet (1994)
SC-21 3A5 Arsenal Ship - Let's abandon everything else in SC21 for a 30,000t monitor with 500 VLS and 50 crew. Biggest Other Transactional Authority purchase ever to avoid the adults taking a look? Abandoned as soon as CNO Boorda was buried. (1996)
Maritime Fire Support Demonstrator - Let's do Arsenal Ship as a demonstrator - Congress: let's not. (1997)
SC-21 3B1/Power Projection Ship/Littoral Combatant - initially 2xVGAS + 128 VLS, became 1x5" + 128 VLS. The whole point of the Littoral Combatant was extended duration naval operations off the Norwegian coast. Didn't it occur to anyone that maybe they should re-evaluate the entire mission given the collapse of the Soviet Union 8 years previously? Assessed unfavourably vs the Burkes and decision made to put the innards in a new hull leading to DD-21 (1997)
Mostly failed due to a small production run. NAVSEA has openly stated that the Zumwalt and Ford method of building new ships is the most effective but it requires budgetary support from government. Also IEP is the bare minimum on modern LSC due to the requirement for future electrically intensive systems. This is a moot point, the failure of these programs is mostly down to the GWOT and a lack of governmental support, not the failings of the systems themselves.DD-21/21st Century Land Attack Destroyer - spawn of Littoral Combatant and the Arsenal ship. Yes, it was stuck within SC-21 and 'Forward - From The Sea', but that should have forced people to realise they needed two separate classes, one fitted for naval gunfire support, one for stealthy open ocean work, not try and squish them both in the same hull and compromise the exquisitely expensive stealth capability. Meanwhile let's take VGAS and squeeze it into a conventional turret, compromising the innovation that gives it its extreme range, while simultaneously designing it to be incompatible with existing ordnance, and only capable of using a round whose costs don't scale affordably. 256 VLS cells wanted. 2000 - this isn't risky enough, lets add IEP. *headdesk* (32 wanted, dead by 2001)
CG-21 - let's turn the Zumwalt into a Tico Replacement. (2000, dead by 2001)
Future Surface Combatant - er, SC21 sounds great, but can we actually afford it? (2001)
LCS is not a product of SC-21... it's a product of FFTS. It makes perfect sense in the context of FFTS. Obviously hindsight (and arguably a lack of foresight from the USN) demonstrates that it was a bad move. 1 point.LCS - Another child of SC-21. Seriously, who thought a 50kt minesweeper was a sensible combination of capabilities? The evidence was there if it was looked for, the RN had investigated high speed frigates in the Type 19, and concluded the combination was unworkable. LCS wanted three innovations that hadn't been done before: high speed, low manning, modularity, that was too many high-risk changes for one class. And interestingly NAVSEA was perfectly willing to relax survivability standards to get there. We all know what happened there, but at least it wasn't Streetfighter.
These decisions were mostly down to politics and not NAVSEA or the navy. The government would not accept a clean sheet program at the time. However to build it cheaply wasn't a goal, acquiring the design it at lower cost and quicker was. The design itself still used high quality and expensive systems. Did you read that_person's deep dive into the choices made citing genuine project leads in FFG(X)?FFG(X)/Constellation - Apparently no one noticed the minor contradiction between "Let's build an in-service foreign design so we can build it quickly and cheaply" and "Let's insist every aspect of the ship matches NAVSEA standards exactly (no one mention we gave LCS a waiver and wanted one for Ford)".
The Ford class issues have broadly been resolved as per workers at NN Shipyards, it's also the first in class. NAVSEA themselves state that building ships like this is still the best way to develop cutting edge ships despite the fact that it creates an apparently greater number of initial problems.Ford Class - Axing SPY-4 from the Zumwalts means Gerald R Ford will be the only ship with Dual Band Radar. Even John F Kennedy has the Enterprise Air Search Radar instead. EMALS teething issues are understandable, weapons elevator problems less so. Just don't mention that the toilet piping is too narrowIt's interesting to note the USN tried to delay shock trials by six years, again demonstrating that even the Navy hierarchy sees its own construction standards as burdensome and something to be worked around.
You're going to need some sources for that champion. CG(X) precedes AMDR. Zumwalt's TSCEI should also have no issues handling it and/or should quite easily be able to be modified to make it work given they are experimental platforms explicitly designed for the purposeSPY-6 AMDR - radar, not a ship, was planned for CG(X), but will end up in the Flight III Burkes with a 14ft array instead of the planned 22ft. Plans to put it in the Zumwalts with the 22ft array abandoned because TSCEI can't handle it.
Yeah champion, absolutely nothing has changed since they built the Tacoma class or the Spruance class. Hell, even Burke doesn't obey your logic given they integrated new systems, a new hull, and new construction methods all at onceIt used to be that the USN changed one thing at a time. Propulsion, hull form, or weapons/combat system. Spruance had new engines. Burke had a new hull. Ticonderoga had a new combat system. Work one one new thing at a time and make it work. Zumwalt and LCS tried to do all 3 at once. And what about foreign designs? Look at the Tacoma class PFs of WW2 and the fiasco that was. Those were extremely simple ships and the US was at the height of its productive capacity. Why would anyone think things would be better now?
The entire post is great but this paragraph really sums up the absurdity of the FFGX debacle.
Yeah champion, absolutely nothing has changed since they built the Tacoma class or the Spruance class. Hell, even Burke doesn't obey your logic given they integrated new systems, a new hull, and new construction methods all at once
Ok then, what was the initial intent of the program?Who was responsible for the FFGX project? That person could not see the disparity between the initial intent of the project and what it became?
An NSC derived patrol frigate fills a fundamentally different niche… it also would’ve still cost 2/3rds as much as a Connie (at least) for less than half the capabilityIt's really a bit odd since they could have just taken NSC or something and given it a hull plug, honestly. It would be an actual FFG: soft squishy ship produced fairly cheaply by medium size yards for escorting merchant ships and nothing else.
The point of FFG(X) was clear: to build a predominantly ASW focused combatant capable of operating with a battle group. It was less expensive because it was less capable but it was not cheap as a first priority. The process through which it was delivered (modification of an in service design) was meant to both speed up acquisition and lower the cost of designing the ship, we now see that failed but the designed ship itself is still a very much needed and capable surface combatant of which essentially every design flaw has now been ironed outI think FFG(X) was really just an attempt to try to make a ship that's a Burke but magically half the cost because they deleted SPY-1 or something. It would explain everything from the range, to the survivability standards, to the VLS fit.
It's really a bit odd since they could have just taken NSC or something and given it a hull plug, honestly. It would be an actual FFG: soft squishy ship produced fairly cheaply by medium size yards for escorting merchant ships and nothing else.
I think FFG(X) was really just an attempt to try to make a ship that's a Burke but magically half the cost because they deleted SPY-1 or something. It would explain everything from the range, to the survivability standards, to the VLS fit. They'll probably do nothing except make some cool Powerpoints about robots, and end up 20-60 hulls short of requirements when the war kicks off, in however many months.
Thankfully the submarines aren't in any dire procurement situations yet but I
Ok then, what was the initial intent of the program?
Then explain what it became?
False! This was the intention from the very beginning. This was understood when each entry was was being formulated.When the decisions were made to modify the design to exactingly hit NAVSEA standards, the initial intent was sunk.
False! This was the intention from the very beginning. This was understood when each entry was was being formulated.
Actually, once again, it was the government who pushed for an off the shelf design modified to US standards. It has also yielded results, Connie is an essentially completed design with the problems ironed out that meets the standards, while failing to be as quick as was hoped it’s still a capable design that meets requirementsNot false. Either leadership in the Navy sabotaged the program or they are incompetent.
I lean towards them being incompetent but accept sometimes two things can be true.
Actually, once again, it was the government who pushed for an off the shelf design modified to US standards. It has also yielded results, Connie is an essentially completed design with the problems ironed out that meets the standards, while failing to be as quick as was hoped it’s still a capable design that meets requirements
First of all, just btw, he has direct contact with those in the industry, those who lead the BIW submission. I think he has a far greater knowledge than you. Do you have such credentials? Do you have emails demonstrating project requirements, navy goals, etc.? Given you’ve invoked nothing but your opinion I would wager not.That person could not see the disparity between the initial intent of the project and what it became?
what are you even talking about? Insubordination? Incompetence? The program is overtime, fine, nobody objects to that. But the product, a NAVSEA standards meeting, highly capable, FFG is all but ready to go. It worked, it just took longer than we would’ve liked. You’re utterly unfit to comment if this is the standard of your understanding.That is a cop out. If you are saying the Navy did not like the direction set by their civilian leaders and so did not listen to them, that is insubordination and they should be shot.
If they tried to do what they were told but couldn't figure out the ships were built to completely different standards going in, then they are incompetent.
If they are that incompetent, they should not be in decision making positions anymore.
If the people project managing the program couldn't figure out this was going to be a debacle in the first year of the program, they should be scrubbing rust from hulls and not managing anything
”Run the government like a business” yeah that works GREAT. Even then, this isn’t how business operates. Projects don’t go wrong and “heads roll”. You’ve been watching too many moviesIn the civilian business world, heads would roll.
Eyeah heads will roll.In the civilian business world, heads would roll
First of all, just btw, he has direct contact with those in the industry, those who lead the BIW submission. I think he has a far greater knowledge than you. Do you have such credentials? Do you have emails demonstrating project requirements, navy goals, etc.? Given you’ve invoked nothing but your opinion I would wager not.
what are you even talking about? Insubordination? Incompetence? The program is overtime, fine, nobody objects to that. But the product, a NAVSEA standards meeting, highly capable, FFG is all but ready to go. It worked, it just took longer than we would’ve liked. You’re utterly unfit to comment if this is the standard of your understanding.
”Run the government like a business” yeah that works GREAT. Even then, this isn’t how business operates. Projects don’t go wrong and “heads roll”. You’ve been watching too many movies
The purpose of the Ship Characteristics Board was to coordinate the creation of 'ship characteristics' that are essential to the design of naval combatants and auxiliaries. Coordination was required because the operators and the designers of ships had different interests, perceptions, concepts, and constraints. NAVSEA is an replacement of BuShip. In the warship program after the end of the Cold War, which level was designed entirely by the NAVSEA itself?What on earth does the National Security Cutter have to do with the Ship Characteristic Board??? Last I checked NAVSEA is the current body for warship procurement
Didn't you realize that the fundamental reason for FFGX's failure was the Navy's lack of clear requirements? If the Navy had clearly defined the primary and secondary performance characteristics, would the GAO still mention in its reports that the Navy was constantly revising its requirements? If SCB had continued to exist, do you think this situation would have occurred?At a complete loss as to what any of this has to do with FFG(X).
BuShips and SCB (and SCIB) haven’t existed for decades.
I was clearly referring to the National Security Cutter, not the National Security Council.
Nor does your response satisfy any of the questions I posed in my previous message.
If domestic yards failed so miserably during FFG(X) conception, please, show us. I’m sure it will be enlightening. I think my previous posts effectively demonstrate just how limited American yards were with their options, and the trade offs in the design process.
Funny way to say you don’t know shit about the business of US Naval shipbuildingI started as an engineer but over time worked my way into executive positions in a couple of large, multinational corporations.
I worked in successful startups and unsuccessful startups.
I have a more than a fair idea of how the business world works.
The first ship is literally under construction but okAs far as the design being essentially ready, let me know when the design is actually ready. Then let me know when those frigates are in the water and in the hands of the fleet
Outright lie, DDG(X) San Antonio Flt II, the ESBs, etc. are/have done fine.The fleet is shrinking and growing older. Every major naval shipbuilding program is behind schedule by years.
The US still had the most lethal fighting fleet in the world but okI would not wear being part of that as a badge of honor
If you don’t even know the nomenclature or the program specifics then how can you judge the overall efficacy of the program? You don’t even know what the status quo is for Christ sakeHe or perhaps yourself, can tell me how things are done, perhaps using the right acronyms, but anyone defending the status quo is delusional or part of the problem.
This is fundamentally false. To quote the head of the BIW proposal “FFG(X) was a very well run program with excellent communication between parties”. The program had monthly meetings between navy and bidders which allowed for design requirements to be as close as possible to Navy desires. FREMM is exactly what the navy wants and needs, it took longer than was hoped but that doesn’t change the outcomeDidn't you realize that the fundamental reason for FFGX's failure was the Navy's lack of clear requirements? If the Navy had clearly defined the primary and secondary performance characteristics, would the GAO still mention in its reports that the Navy was constantly revising its requirements? If SCB had continued to exist, do you think this situation would have occurred?
Funny way to say you don’t know shit about the business of US Naval shipbuilding
The first ship is literally under construction but ok
Outright lie, DDG(X) San Antonio Flt II, the ESBs, etc. are/have done fine.
The US still had the most lethal fighting fleet in the world but ok
If you don’t even know the nomenclature or the program specifics then how can you judge the overall efficacy of the program? You don’t even know what the status quo is for Christ sake
Which results? It's easy to ignore all the successes when it suitsI can judge it buy it's results.
DDG(X) is on track and thanks to Zumwalt, it is using mostly proven technology. The program is going exceptionally well, ironically due to factors that have oft been repeated in this thread as "failures"By the way, isn't it a bit early to be calling DDGX a success? All these programs look good until they don't. Keeps the money rolling in I guess.
That's why the US Navy is still the only truly global navy with 11 carriers?A General who cannot apply war-winning leadership is useless despite his credentials.
The US understood that in WW2 and replaced guys who couldn't get it done with those that could.
The modern Navy, with more Admirals than ships seems to have forgotten that lesson.
Oh he's a good example actually. "Lets run the government like a business", (DOGE) "and see how it goes". Remind me, how did it go?Elon Musk didn't know much about rockets or satellites before he showed NASA how to get it done.
The credentials of US procurement are massive successes marred by the uneducated parroting the same talking points on a small number of programsCredentials are not everything. Sometimes in fact, they get in the way of innovation and reform.
You asked for examples, if ripping a battleship apart and completely replacing its engines doesn't count I'm not sure what did.The fact we did it a century ago with steam plants is practically irrelevant
Isn’t this also years behind schedule and experiencing massive cost overruns? Probably not worth it for ships with a 25 year service life.
What shaped those decisions? Procurement plans, cost, technical capability and political support don't exist independent of each other, they're locked in a feedback loop where a problem in one area sours all the others.Correct, but that wasn’t the cause of cancellations either. Both Zumwalt and LCS saw reduced procurement because we didn’t want more of those vessels, we didn’t need more, and they didn’t fit DMO without politically untenable modernizations.
The only flexibility the Zumwalts offer appears to be the large amount of empty space left after ripping out their magazines. Have they actually brought an improvement in capability in any mission over a Burke? As delivered they were a 16,000t destroyer with 16 less VLS cells than a Burke and a gun armament of 2 30mm Mk 46s.But even then, I think we’re starting to see the sheer flexibility something like Zumwalt offers
That's why I specified _combatant classes_, I specifically excluded the amphibs.Also regarding the idea that the USN hasn’t had a successful surface ship procurement program outside of Burke in the past 30 years,
America-class LHAs, San Antonio-class LPDs, LPD Flight IIs, Flight III, Ford, T-AKE, T-AO-205, LMSRs, and T-AO-205s, ESD/ESB, and T-ARS all say hello.
Oh idk, maybe replacing the powerplant of a modern LSC?You asked for examples, if ripping a battleship apart and completely replacing its engines doesn't count I'm not sure what did.
This doesn’t mean anythingWhat shaped those decisions? Procurement plans, cost, technical capability and political support don't exist independent of each other, they're locked in a feedback loop where a problem in one area sours all the others.
then you evidently haven’t followed the program very closely.The only flexibility the Zumwalts offer appears to be the large amount of empty space left after ripping out their magazines. Have they actually brought an improvement in capability in any mission over a Burke? As delivered they were a 16,000t destroyer with 16 less VLS cells than a Burke and a gun armament of 2 30mm Mk 46s
Burke Flt II and III..?That's why I specified _combatant classes_, I specifically excluded the amphibs
Ok and? It was a study, what's your point
Another study, what's your point?
Another study, what's your point?
You don't seem to understand that these are not two separate points, they are implicitly linked. An expensive, high risk design is a tough sell to government, any bad news at all risks it being cancelled. You cannot design ships and ignore the political dimensions of the build. People at the sharp end of development have been making this point about defence procurement for coming up on a century (at least).Mostly failed due to a small production run. NAVSEA has openly stated that the Zumwalt and Ford method of building new ships is the most effective but it requires budgetary support from government.
True, but in 2000 it was a highly experimental technology, it added risk and cost to an already costly and high risk design, with all the political risk that then accrues. A less riskier approach would have been to keep IEP back for a Flight II and prototype it at full scale and at sea in the meantime. The visuals of your vital project being towed back into port because its engines failed are incredibly damaging to project survival. Doing it in the middle of the Panama Canal is worse still. Having similar problems with the second ship just cements opinions that the class is a dud. This is the ultimate consequence you invite when you choose to increase risk.Also IEP is the bare minimum on modern LSC due to the requirement for future electrically intensive systems.
You cannot separate the project decisions and the presence or lack of government support, the two go hand in hand. GWOT is a fair point, but it is not the only point, budgets were already tight and falling.This is a moot point, the failure of these programs is mostly down to the GWOT and a lack of governmental support, not the failings of the systems themselves.
"In November 2001, the U.S. Navy announced its new DD(X) Future Surface Combatant Program, which encompassed the acquisition of three new classes of ship: DD(X), a destroyer for precision long-range strike; CG(X), a cruiser for missile and air defense; and a littoral combat ship that could operate in shallow-draft and coastal waters." https://warontherocks.com/2021/11/lessons-from-the-littoral-combat-ship/LCS is not a product of SC-21... it's a product of FFTS. It makes perfect sense in the context of FFTS.
They aren't separable, they are linked together in a feedback loop. You can't understand procurement without understanding that point.These decisions were mostly down to politics and not NAVSEA or the navy.
That there tells me that you don't understand how defence procurement works as a function of government, not independent of it.This doesn’t mean anything
You are greatly misrepresenting how “serious” these studies were.CGBL was there to provide a comparison for more innovative projects, MEU was a serious look at a different model of combatant, there was full intent to proceed to a production project from SC21.
An NSC derived patrol frigate fills a fundamentally different niche… it also would’ve still cost 2/3rds as much as a Connie (at least) for less than half the capability
The point of FFG(X) was clear: to build a predominantly ASW focused combatant capable of operating with a battle group.
It was less expensive because it was less capable but it was not cheap as a first priority.
The process through which it was delivered (modification of an in service design) was meant to both speed up acquisition and lower the cost of designing the ship, we now see that failed but the designed ship itself is still a very much needed and capable surface combatant of which essentially every design flaw has now been ironed out
True, but in 2000 it was a highly experimental technology, it added risk and cost to an already costly and high risk design, with all the political risk that then accrues. A less riskier approach would have been to keep IEP back for a Flight II and prototype it at full scale and at sea in the meantime. The visuals of your vital project being towed back into port because its engines failed are incredibly damaging to project survival. Doing it in the middle of the Panama Canal is worse still. Having similar problems with the second ship just cements opinions that the class is a dud. This is the ultimate consequence you invite when you choose to increase risk.