- Joined
- 21 January 2015
- Messages
- 14,989
- Reaction score
- 24,203
Bruno: Very pleased with test. Points to Astrobotic for timing of delivering its Peregrine lander to the Cape for processing.
Vulcan is a next-generation launch system under development by United Launch Alliance that’s been trying to lift off for years now. Unfortunately, different delays related to the first mission’s payload, rocket, and plan have all pushed this date back a few years. Recently we got news that the upper stage was being unstacked and shipped to ULA’s factory for necessary upgrades.
Just days ago Tory Bruno gave more insight into this process and what the repairs will look like and how exactly it affects Vulcan’s schedule. All of this comes after a Vulcan upper stage Centaur test article exploded within the test stand. At first, the thought was that it wouldn’t affect the maiden flight but ULA has since changed its mind.
This comes in addition to the BE-4 flight engine explosion which ULA and Tory are very confident will have little to no impact on Vulcan’s maiden flight. Here I will go more in-depth into the upper-stage repairs currently underway, the new launch date for Vulcan, what to expect in the coming months, and more.
Full article here - https://thespacebucket.com/how-ula-is...
Earlier this year an explosive upper stage test of the Centaur V caused some concerns with a separate Vulcan test article preparing for a maiden flight. While initially, the thought was that this mishap wouldn’t affect the launch schedule, an investigation found a weakness in the stage’s design. This meant ULA needed to de-stack the Vulcan preparing to launch and ship the upper stage back to the factory for repairs.
While this happened quite recently, ULA is making good progress and has already begun upgrades on the stage. Tory Bruno has confirmed that he is very confident Vulcan will be ready to lift off this year in quarter 4. He also gave more insight into exactly how they are strengthing the stage and how this will impact the payload capacity, schedule, etc.
For a while now Vulcan has been running into delays for all sorts of reasons continuing to push back its madien flight. ULA is now trying everything in its power to get this rocket off the ground. Here I will go more in-depth into the upper stage’s progress, what they still need to complete, the chances of a launch this year, and more.
Full article here - https://thespacebucket.com/vulcan-rep...
ULA’s Vice President of Vulcan Development Mark Peller talks us through our new #VulcanRocket from Decatur, Alabama, to Cape Canaveral, Florida!
This picture is a little old now, but I thought you might find it interesting. Inside of the new reinforced dome for Cert1 during build. You can see the circular doubler in the center and the seam doublers running out radially along the gore welds. #VulcanRocket
Yes. We continue to be on track for a launch in Q4 of this year. With a second launch in early 2024. The reinforced Cert1 Centaur V is making excellent progress in the factory, and it’s booster is ready to go at the Cape.
Possibly but I’d look more towards November or December.So the earliest we can expect the first launch is in October 2023 then?
Currently, the rocket that was most recently scheduled to lift off last month, is in United Launch Alliance’s factory undergoing necessary upgrades. After an upper stage test article exploded, the company found a weakness in the upper stage tank, and decided that Vulcan was not launching anywhere without fixing this problem.
Once discovered, Vulcan went from completing practically all of its pre-launch testing and preparing to liftoff in a month to being destacked and shipped away. Despite this significant hiccup, recent updates from ULA CEO Tory Bruno suggest that Vulcan will still lift off this year. A task that seems extremely unlikely given the circumstances and date.
This being said, physical progress is coming along and with most of the pre-launch testing already complete, ULA could have an opportunity to fast track the process and get Vulcan in the air before 2024. This is assuming that all the upgrades work as intended and no other issues are revealed within the next few months. Here I will go more in-depth into Vulcan’s upper stage reinforcement progress, what the company still needs to complete, the chances of a launch this year, and more.
Full article here - https://thespacebucket.com/can-ulas-v...
ULA's Tory Bruno says the Vulcan Centaur, with modifications to the upper stage, will roll out to the pad in November for launch in December. #WSBW
nighttime launch on the 24th December.
View: https://twitter.com/ulalaunch/status/1717583778023883255Today is the day we've been anticipating as the ULA team begins launch operations at Cape Canaveral to ready the first #VulcanRocket for its inaugural flight! We are targeting Dec. 24 for Certification-1 (#Cert1) to send a commercial lunar lander to the Moon. #CountdowntoVulcan
The #VulcanRocket #Cert1 launch campaign includes hoisting the first stage aboard the Vulcan Launch Platform, installing two GEM 63XL solid rocket boosters, interstage & Centaur V, performing a final Wet Dress Rehearsal & attaching the encapsulated payload. #CountdowntoVulcan
Still running ahead of schedule. Here it is in the finishing station. #CountDowntoVulcan #VulcanRocket
After lots of delays, Vulcan’s first test article is back on the pad awaiting the arrival of its upper stage for a launch next month. The vehicle is said to be ahead of schedule as they target Christmas Eve or December 24th as the launch date.
In other news, Rocket Lab has received FAA authorization to resume Electron launches from LC-1. This comes after the company’s most recent Electron launch that had an anomaly losing both the vehicle and payload.
Lastly, Relativity Space has been very busy building test stands, manufacturing complexes, and testing Terran R’s new Aeon R engine hardware. Here I will go more in-depth into Vulcan’s new launch date, Rocket Lab’s investigation, Relativitity’s progress, and more
.Full article here - https://thespacebucket.com/ula-has-co...
It looks like Vulcan's delay ended up costing ULA about $350 million in military launch contracts. Story:
After Vulcan slips, Space Force ends up awarding more missions to SpaceX
"It is imperative to rapidly deliver critical space capabilities."
by Eric Berger - Nov 2, 2023 2:14pm GMT
Our little bird is about to leave the nest. #VulcanRocket 's #Cert1 Centaur V is getting the last few touches before heading down the road to the Rocket Ship. #CountdowntoVulcan
Wow. That kind'a looks like 4 Centaur V's in flow at the Rocket Factory... #VulcanRocket
Are they changes / iterations on these or is it pencils down?
There is a planned upgrade program that will be introducing performance enhancements in blocks
Very exciting!
With ULA consolidating Delta & Atlas factory space into production for one vehicle, what kind of production rate are you targeting for Vulcan? I think you mentioned it in your tour with @smartereveryday, but I don't recall what number you had in mind
25 per year
The Centaur V upper stage for the inaugural United Launch Alliance #VulcanRocket was integrated atop the booster on Sunday, completing initial buildup for the #Cert1 mission.
Read more about this #CountdownToVulcan milestone in the blog:
Vulcan is an expendable two-stage heavy-lift rocket that has been in the development and testing phase since 2014. Its design combined with the use of brand-new hardware such as Blue Origin’s BE-4 engine, caused a host of delays during in its nearly decade-long development. Most recently an upper-stage explosion on the test stand pushed the flight back a few months.
Thankfully, these various issues have since been resolved and both the upper stage and booster are back at the launch site preparing to lift off. With an official launch date set for December 24th, this is the closest Vulcan has been to its first flight.
Between now and then, the company needs to complete one main test and integrate the payloads. Here I will go more in-depth into the final launch prep, why this first flight is such a big deal, its future with Dream Chaser, and more.
Full article here - https://thespacebucket.com/ula-is-wee...
#VulcanRocket WDR update: Vehicle performed well. Ground system had a couple of (routine) issues, (being corrected). Ran the timeline long so we didn't quite finish. I'd like a FULL WDR before our first flight, so XMAS eve is likely out. Next Peregrine window is 8 Jan.
Welp. It's definitely not the news we wanted to hear, but glad you're pushing for success. Will it still be an early morning launch on the 8th?
yes. We'll publicize the details
ULA's Vulcan rocket is returning to launch pad 41 at Cape Canaveral for a second attempt to complete a Wet Dress Rehearsal ahead of its inaugural mission.
#VulcanRocket rolled back to the pad. Ground side leaks that interfered with completing Friday’s WDR were fixed over the weekend. Next WDR tomorrow.
Ground Software was dealt with more or less in real time. But a pair of ground side LOX leaks ate up the timeline right at the end. Those are now fixed and we’re set up to repeat the (full) WDR tomorrow
@torybruno are you able to expand on what the "routine" issues were with the ground equipment?
2 LOX leaks in the tank farm
@torybruno Spaceflight now says Vulcan is headed back to the pad for another one so does that mean Xmas eve is still in play?
We’ll likely go to the 8 Jan opportunity, which has comparatively long, multi minute windows
@torybruno does the launch time on Vulcan remain the same for a Jan 8th launch attempt or will it change again?
Still zero dark thirty, but a little bit later. Longer window. Not instantaneous
"Likely" out, as in there's still a chance to launch this month?
No, not really. The payload is encapsulated, but it will still have to be integrated, followed, testing and vehicle close outs. This pushes us past the December window.
The team is on console and vehicle preparations are underway for today’s WDR. #VulcanRocket
Well, how did the 2nd WDR go?
It went great. The critical events we wanted to demonstrate happened nominally and on the timeline. #VulcanRocket is now in the pipe for its first launch (CERT1) at the next lunar window on 8 January.
Any thoughts on a time, day or nite? (Please don't say 3 in the morning )
View: https://twitter.com/ulalaunch/status/1735371981493559607Still in the wee hours of the morning. But it's a generous 45 min window vs the instantaneous one we had in December
Following a successful WDR, the launch of ULA's first #VulcanRocket flight test and #Cert1 mission is planned for Jan. 8, 2024, pending range approval. The Vulcan VC2S rocket will launch from SLC-41 from Cape Canaveral Space Force Station, Florida.
The first Vulcan encapsulation: Astrobotic's Peregrine lunar lander is ready for its trip to the moon, targeted for the early hours of January 8 (@ulalaunch photos)
By popular demand, here’s a #ToryTimelapse of the successful #VulcanRocket WDR. If the wind cooperates today, we’ll mate the spacecraft back at the VIF. Next stop the Moon!
The payload fairing containing the Peregrine lunar lander is being lifted into position atop the Vulcan rocket. @ulalaunch will not allow us to bring you video or photos of this operation from our location nearly four miles away, citing export control (ITAR) restrictions.
Look at this beautiful fairing for a historic inaugural launch! #VulcanRocket #Cert1 #CountdowntoVulcan
Launch info: bit.ly/vulcan_cert1
@ulalaunch will not allow us to bring you video or photos of this operation from our location nearly four miles away, citing export control (ITAR) restrictions.
But it isn'tThat sounds like bullshit to me