Dr.Snufflebug
ACCESS: Restricted
- Joined
- 14 September 2020
- Messages
- 47
- Reaction score
- 99
Well, it's only technically a serial and only technically delivered to the VKS. The blue logotype behind the bort number is that of the Chkalov state flight test center, it doesn't have the final engines or nozzles, some skin-related things aren't present, the OLS is still a placeholder (and probably several other electro-optical apertures aren't housed the way envisaged), and there are multiple other things that are subject to change still.
But it does show that they got the base manufacturing down properly. Huge, smooth composite panels cover the entire thing, it's just a huge step for Russian military aircraft manufacture, quite unlike the rather crude Soviet-reminiscent prototype series or the products of other Russian bureaus. Sukhoi is now miles ahead. Still, this aircraft isn't finished.
But it does show that they got the base manufacturing down properly. Huge, smooth composite panels cover the entire thing, it's just a huge step for Russian military aircraft manufacture, quite unlike the rather crude Soviet-reminiscent prototype series or the products of other Russian bureaus. Sukhoi is now miles ahead. Still, this aircraft isn't finished.