- Joined
- 23 August 2011
- Messages
- 2,566
- Reaction score
- 8,460
Sea trialsIs that builder's sea trials, or delivery to the RN?
Sea trialsIs that builder's sea trials, or delivery to the RN?
That explains it.. surprised MBDA haven't got it up on their website they did a revamp recently.Actually it is a Polish Brochure (Paper) which is translated into English by Google Lens, here is the original version. I believed that someone took a photo of this brochure from MSPO 2026.
View attachment 823842
The Polish media reported that the development of CAMM-MR is progressing very slowly, even though the qualification tests (I believed these tests refer to the photo on the bottom left of the brochure) were completed around 20 months ago.That explains it.. surprised MBDA haven't got it up on their website they did a revamp recently
The Polish media reported that the development of CAMM-MR is progressing very slowly, even though the qualification tests (I believed these tests refer to the photo on the bottom left of the brochure) were completed around 20 months ago.
For what it's worth the original schedule back in the days of Global Combat Ship called for one ship to be delivered every year from 2021 to 2034, and was calculated down to the day - including launch dates. This caused some amusement amongst anyone who actually looked at the build schedule.For what it's worth, I went back to look at old official statements and HMS Glasgow was originally scheduled* to be delivered in "summer 2025" after completing builders' trials.
Cheaper and easier to produced a sealed tubular cannister filled with inert gas. Square, even with rounded corners has both production cost issues and sealing issues. Resolving those add yet more cost.
Agreed, it is too vague to identify if it is a real photo.IF thats a real photo (rather than CGI) then....
1) - I'm really surprised MBDA haven't made a song and dance about it, even though it would just be a test article being ejected...
2) - It's surprising that they're using circular canisters (even though the circular canisters are sat within the Mk.41 dual pack at sea) on a land mount as its a whole lot easier to store, transport, lift and mount rectangular units. IF its real it could just be an initial test with later canisters to be mounted in a production rectangular box for ground launch at least. A lot of the environment protection is in the 'box' section.
3) - Single test stands have been used previously on these trials for CAMM/CAMM-ER, IF they're using iLauncher it would tend to imply that they've done single cell test shots before.
4) - 8 x CAMM-MR on iLauncher is a nice capability...be interesting to see if combinations of CAMM/CAMM-ER/CAMM-MR can be combined, or if a dedicated CAMM-MR launcher is necessary.
As to progress....thats more than we thought....but most of the CAMM elements are already well understood and tested (seeker, data link, warhead, guidance etc.). So once you've got the cold launch trials out of the way its mainly about the turnover, transition to guidance, the rocket motor and the missile envelope I'd expect...
If you need a 3 gee cold launch off a 10" square plate lofting 500lbs, the internal force required is 1500lbs. A 10" square pusher plate is 100 square inches, so you only need 15psi or so on the pusher plate. 2 Bar absolute pressure inside the canister.Yes other cold launch systems are available and have long been in use, but they do come with disadvantages, particularly around missile design and the launch canister (the entirety of which becomes a pressure vessel and a lot heavier as a result). SVL is a very elegant engineering solution in comparison.