Forest Green
ACCESS: USAP
- Joined
- 11 June 2019
- Messages
- 14,499
- Reaction score
- 31,530
Idk why they never gave seeker production licensing to Japan. This would have just solved things long before there ever would have been an issue.Plans for Japan to double production from 30 to 60 Patriots a year to help Ukraine is being delayed by a shortage of seekers manufactured by Boeing, the Japanese plant has a limit of 60 and cant expand capacity further without a new plant being built. Boeing began expanding Seeker production capacity in the US by 30% last year but it wont come on stream until 2027 also delaying a plan to increase US domestic production from 500 to 650 Patriots a year (with another 100 manufactured abroad for a total of 750 by 2027).
https://www.straitstimes.com/asia/u...oduction-plan-hits-boeing-component-roadblock
As I understand it the big issues is with the motors and guidence system.Given the urgent need to massively increase the production PAC2 and PAC3 missiles but there are bottlenecks in the production shouldn't the US DoD be thinking about opening a second-source production line?
There's a few places that could make it. Micron and HP/etc in the Boise area, but the USgov would have to pay market rates for rush orders at the chip fabs.There isnt many people in the US who can makes those with those who do are already at capacity with all the other similar gear like Standards, GMLRS, Nasa, etc who also need similar stuff.
As to new factories in general, well, the way to pry money out of (the opposite of progress) is to locate the factories in the districts of the members of the committee.So we are talking about a full from raw production build up which is going to take a few years even with the military pile driving OSHA and NIMBY into the ground. Assuming the Money could be pull from the corpses in Congress that is.
Maj. Gen. Frank Lozano, the Army’s program executive officer for missiles and space, on Monday announced the service’s intent to walk away from the effort, called the Lower-Tier Future Interceptor (LTFI). Instead of buying a new interceptor, which Lozano called “very expensive,” the Army will upgrade the PAC-3 Missile Segment Enhancement currently made by Lockheed Martin, he told Defense News.
Lockheed had been preparing to compete for LTFI, and as of Tuesday afternoon, the Army had not yet informed the company of its specific path forward for future PAC-3 upgrades, said Tim Cahill, executive vice president of the company’s missiles and fire control business.
However, the decision didn’t catch Lockheed “flat footed,” as it typically invests in future capability enhancements on PAC-3 and has technology “waiting in the wings,” he added.
Appears to be completely different:Is Typ-4 the just the GaN version of TYP-2?
There's even less in common between the 1991 SM2 and the 2025 SM2 than there is between the 1991 Patriot and the 2025 Patriot.
And pretty soon the in-service SM2 will have the same active seeker as the SM6.
They still have the low-power SM2 booster instead of the stack in the SM6.Once they have an active radar seeker they won't be an SM-2 anymore.
The IRIS-T air defense system is regarded as highly effective, however, missiles are costly and in short supply. A completely unexpected criticism is directed towards the Patriot missile defense system: though an "excellent weapon," it's effectively "unsuitable for war use because the carrier vehicle is too old and it's no longer possible to supply spare parts from the manufacturer."