- Joined
- 13 August 2007
- Messages
- 10,425
- Reaction score
- 18,117
ESA has secured contracts both with ArianeGroup and Rocket Factory Augsburg which will last until September 2023.
Never gonna happen.even if there is a 100% chance it never happens
Never gonna happen.even if there is a 100% chance it never happens
There was the Super Ariane proposal to Land ESA Astronauts on Moon in 1990s
like proposal for Manned European Spacecraft
The European Council of Ministers don't care
under current development ESA and Arianespace has no future
in end SpaceX, RocketLab and others will launch more and cheaper...
"In fact, the vehicle must guarantee access to low Earth orbit and beyond, offering at the same time large payload capacities (at least 10 000 t per year), a high launch rate, low construction and operating costs, and a reduced environmental footprint, in line with the European Green Deal initiative.”
What is it describing as 'Heavy-lift'
Never gonna happen.even if there is a 100% chance it never happens
There was the Super Ariane proposal to Land ESA Astronauts on Moon in 1990s
like proposal for Manned European Spacecraft
The European Council of Ministers don't care
under current development ESA and Arianespace has no future
in end SpaceX, RocketLab and others will launch more and cheaper...
ESA may have a future but Arianespace not so much
Still curious what the individual LEO payload capability will be supposed to be.
Still curious what the individual LEO payload capability will be supposed to be.
Powersats maybe. This is where Sea Dragon-or at least shipyards-may be of some use. Not a big shipyard-launches would disturb refits. Small affairs. Not much difference between flame trenches and a slip. Here I might flip propellants...hydrolox flyback-methane upper stage. Hydrogen from ocean-methane from animal husbandry. We know SLS' RS-25 can burn for twelve minutes.Still curious what the individual LEO payload capability will be supposed to be.
I meant a quantitative figure of metric (I'm European, so sue me) tons of payload delivered to a minimum sustainable (let's say at least a year of acceptable decay before a reboost is required to maintain orbit) LEO. That is *really* the most basic requirement of any launch vehicle. As an aerospace engineer who has dabbled (on pay, I might add) in launch vehicle design for a while, as a first approximation, apart from payload density, I don't really care what, other than its mass, the nature of the payload is, i.e. SPS or not, so let's focus on the essentials here, shall we?Powersats maybe. This is where Sea Dragon-or at least shipyards-may be of some use. Not a big shipyard-launches would disturb refits. Small affairs. Not much difference between flame trenches and a slip. Here I might flip propellants...hydrolox flyback-methane upper stage. Hydrogen from ocean-methane from animal husbandry. We know SLS' RS-25 can burn for twelve minutes.Still curious what the individual LEO payload capability will be supposed to be.
Again, nonsense.Powersats maybe. This is where Sea Dragon-or at least shipyards-may be of some use. Not a big shipyard-launches would disturb refits. Small affairs. Not much difference between flame trenches and a slip. Here I might flip propellants...hydrolox flyback-methane upper stage. Hydrogen from ocean-methane from animal husbandry. We know SLS' RS-25 can burn for twelve minutes.Still curious what the individual LEO payload capability will be supposed to be.
Beside that, I feel so sad that French made Hermes never flew...
View attachment 699062
We would have now a very nice sovereign manned spaceship...
Hopelessly, politicians killed the project, and brought us lose all our capacities in favor of USA or Russia.
Right now, ESA programs are mostly led by scientists, who don't have a single interest about operations and business, but only about their scientific articles and observations...
Radium
I
Beside that, I feel so sad that French made Hermes never flew...
View attachment 699062
We would have now a very nice sovereign manned spaceship...
Hopelessly, politicians killed the project, and brought us lose all our capacities in favor of USA or Russia.
Right now, ESA programs are mostly led by scientists, who don't have a single interest about operations and business, but only about their scientific articles and observations...
Radium
The main goal of LEO crewed spaceflight is prestige and awareness, but 40 years of european crewed spaceflight have demonstrated that the european public only cares about astronauts from their own countries (or at best, own language).
A Hermes which flies once or twice a year carrying 3 euronauts (including A Frenchman, A German all the time) wouldn’t have been very palatable for most of ESA’s members, it wouldn’t have inspired the polish or Spanish public, this would be fine if it was free, but Hermes needed 10 billion dollars to develop + 1 billion per year of operation, and this would have come at the expense of every other ESA program, many of which they are or were world leaders in.
I'm waiting for Musk to rename SuperHeavy 'STEAK' . . .I guess spam is protein too...
I'm waiting for Musk to rename SuperHeavy 'STEAK' . . .I guess spam is protein too...
cheers,
Robin.
I was thinking a pad that might slide out a dock and slide back.Especially if you want to immerse a stage filled to the brim with cryogenic propellants in sea water and ignite it there. I am truly at a loss to formulate what I would put at the top of a "what could possibly go wrong" list for such a concept, because there are way too many contenders...
The obvious solution would have been to rotate nationalities per mission? Polish, Spanish, Italian for one mission; French, German, Swedish for the next; Dutch, Belgian, Finnish; and so on.
I'm waiting for Musk to rename SuperHeavy 'STEAK' . . .I guess spam is protein too...
cheers,
Robin.
SpaceX Two Scoops.
Isn't that all RFA would need to use there software to produce the cheapest rocket "they could get with it"?I meant a quantitative figure of metric (I'm European, so sue me) tons of payload delivered to a minimum sustainable (let's say at least a year of acceptable decay before a reboost is required to maintain orbit) LEO. That is *really* the most basic requirement of any launch vehicle. As an aerospace engineer who has dabbled (on pay, I might add) in launch vehicle design for a while, as a first approximation, apart from payload density, I don't really care what, other than its mass, the nature of the payload is, i.e. SPS or not, so let's focus on the essentials here, shall we?
I'm not aware of many such clones, in that same payload class, there's some recent plan for CZ-9... and then what else?Another bloody SS/SH clone.
Am I the only one who consider the rocket name hilarious?