Possibly, but Boeing will still have to do a gradual ramp-down for F-18 and that could take time, Boeing is still going to need a lot of people. If Boeing was smart and since NG is out, keep the same relationship for F/A-XX as they have for F/A-18, seems to be a good relationship as the program ran well. Having NG for the F-35 center section has worked out well also. NG has a lot of value to offer.
Perhaps cooperation would also be likely, given that there were staff involved at the individual projects of the competing companies like NG and LM. Perhaps Boeing would have recruited some of them later on, but again, we don't know if that is what they did. I do hope they have both the manpower and the brain trust to make it all possible.
 
Last edited:
Some interesting comments by Vago on the Defense and Aerospace Air Power Podcast in relation to the F/A-XX selection. He made the statement that one of the factors in the decision was the ability of the aviator in the Boeing entrant to be able to see over the nose and fly the ball onto the carrier while the NG entrant had a significantly longer nose that prevented that direct sight and was using cameras or another mechanism.

https://defaeroreport.com/2026/10/0...t-07-26-season-4-e35-the-defense-never-rests/

Given the capabilities of magic carpet and JPALS it is interesting that this would be a factor, no idea of the weighting assigned to it, but also that potentially there should have been a requirement to state it. It might also give NG a protest opportunity of the requirements specifically didn't call this out and that component of the overall decision was made on gut feel.
 
It might also give NG a protest opportunity of the requirements specifically didn't call this out and that component of the overall decision was made on gut feel.
On the other hand, if both entries meet all the primary requirements at rough parity, there's nothing stopping leadership from making the final decision based on whatever subjective criteria they choose.
 
On the other hand, if both entries meet all the primary requirements at rough parity, there's nothing stopping leadership from making the final decision based on whatever subjective criteria they choose.

On the other hand, in case of parity, a logic mind would choose the company with the best recent record of respecting budget and timelines.
 
it is my understanding that the USAF intends to recompete primes for future F-47 increments and the same might be true for F/A-XX.

Five to seven years is how long it probably takes to stand up the full suite of manufacturing, coating and testing facilities for fighter sized aircraft. If NG hits it out of the park with Raider and then builds out capacity for something much smaller than Raider but much bigger than Talon Blue, I could see them being extremely formidable competitors.
 
Northrop Grumman is several years behind and like 50 billion over budget on the Sentinel ICBM.
I thought the actual missile was on track, it was the USAF and their contractor for the missile silos that was behind? Or is that incorrect?
 
it is my understanding that the USAF intends to recompete primes for future F-47 increments and the same might be true for F/A-XX.

Five to seven years is how long it probably takes to stand up the full suite of manufacturing, coating and testing facilities for fighter sized aircraft. If NG hits it out of the park with Raider and then builds out capacity for something much smaller than Raider but much bigger than Talon Blue, I could see them being extremely formidable competitors.
That is the theory but the practical aspects of that already don't make a lot of sense. Both F-47 and F/A-XX each have $20 billion plus EMD contracts which translates to not just building and testing the airframe but also establishing the production facilities required. Boeing has built out a new facility for production, initially funded themselves but that cost comes back to them via the initial production contracts.. Unless the USAF funds a new facility for another prime, including establishing the production infrastructure to switch production to that prime, it seems highly unlikely a different vendor can compete on a new production award nor could they justify that business case to make the investments required without certainty on winning a production contract.

Where a different prime comes in could be on integrating new systems onto the jets, replacing engines and radars and other systems, but even that seems unlikely given Boeing will already have the established EMD flight test trained staff and processes to validate those changes.

There hasn't been any indication that the USAF will also build F-47 to be that rapidly replaced hardware 10 year service life max jet the way the DCS was originally implied, with design houses competing for new designs and separate production primes building the airframes.

I don't expect F/A-XX is trying to follow the same digital century series production philosophy. Yes it will probably have the same open architecture and allow rapid mission system and some hardware changes but I cannot see the USN looking to recontract out production to a different prime.

Boeing would have to really screw up both programs for them to not win all production on both jets going forward. (the exception probably being a global conflict that necessitates production volumes far in excess of current plans for either airframe).

On the other hand, if both entries meet all the primary requirements at rough parity, there's nothing stopping leadership from making the final decision based on whatever subjective criteria they choose.
How likely do you think that would be to happen though? From the comments the designs sound different enough that some subjectivity would be required.

On the other hand, in case of parity, a logic mind would choose the company with the best recent record of respecting budget and timelines.
Agree and contractor performance probably would already have been a factor in the evaluation, just that the weighting was so small it would have made little impact on the overall result.
 
USAF lied to congress and pretended that the existing MM silos would not need to be replaced.

My understanding is that the USAF didn't lie to Congress but instead grossly underestimated how much time AND money it would take to refurbish and modernise the MMIII launch infrastructure (The MMIII originally had a design lifetime of 10 years).
 

Similar threads

Back
Top Bottom