The U.S. Army Corps of Engineers – Fort Worth District has been tasked to solicit for and award a new 95,529 SF Low Observable Corrosion Control Hangar and a Radio Frequency Facility for the new B-21 weapons system. The hangar includes a steel frame, masonry walls, metal roof, secure spaces, and cybersecurity measures. The RF facility will have a reinforced concrete foundation, steel frame, metal roof, and powered hangar doors. Both will include fire protection, climate control, backup power, and RF shielding. Additional work includes a metal storage building, fenced staging area, and concrete pad for fuel tank storage. Site preparation covers clearing, grading, demolition of five buildings, utility rerouting, and roadways/parking improvements. New utilities will be provided, including power, water, gas, sewer, and fiber optics. Temporary facilities will be provided for displaced B4111 occupants. All work will meet DoD standards for security, anti-terrorism, and cybersecurity.