Sounds like Pelican
However, if you read the specs, it's more likely to resemble a typical "flying boat" design, due to being required to fly over weather. However, it will need systems so that it can cruise in ground effect when not requiring to clear objects and weather. It isn't going to look anything like an Ekranoplane based on the requirements atm.
I notice that 'long duration arctic patrol flights' appears on the list - despite warming, large expanses of sea ice will still exist and they'll be fine for a WiG. 'Arctic' is probably going to be obligatory in every specification for anything from now on anyway.
However, if you read the specs, it's more likely to resemble a typical "flying boat" design, due to being required to fly over weather. However, it will need systems so that it can cruise in ground effect when not requiring to clear objects and weather. It isn't going to look anything like an Ekranoplane based on the requirements atm.
https://defbrief.com/2022/05/18/video-darpa-details-its-liberty-lifter-seaplane-concept/Video: DARPA details its Liberty Lifter seaplane concept
By Defense Brief Editorial
-May 18, 2022
![]()
DARPA illustration of the Liberty Lifter seaplane
The US Defense Advanced Research Projects Agency (DARPA) revealed that its project to develop an ekranoplan-inspired seaplane concept would be named Liberty Lifter.
The name was announced after the agency released a request for information (RFI) in August last year, seeking ideas that could demonstrate a leap in operational logistics capabilities by designing, building, and flying a long-range, low-cost X-plane capable of seaborne strategic and tactical lift.
Leveraging the wing-in-ground effect, DARPA’s project will be similar to the ekranoplan concept that was embraced by the Soviet and Russian navies in the 1980s and 90s.
The envisioned plane will combine fast and flexible strategic lift of very large, heavy loads with the ability to take off/land in water. Its structure will enable both highly controlled flight close to turbulent water surfaces and sustained flight at mid-altitudes. In addition, the plane will be built with a low-cost design and construction philosophy.
Although current sealift is very efficient in transporting large amounts of payload, it is vulnerable to threats, requires functional ports, and results in long transit times. Traditional airlift is much faster, but has limited ability to support maritime operations. Additionally, today, such aircraft suffer payload limitations or require long runways.
There is a history of attempting to develop aircraft created to fly with “wing-in-ground effect,” which means the aircraft is flying no more than the length of its wingspan above ground or water. The most well-known examples are the Soviet “ekranoplans.” These vehicles were high speed and runway- independent, but were restricted to calm waters and had limited maneuverability.
“This first phase of the Liberty Lifter program will define the unique seaplane’s range, payloads, and other parameters,” said Alexander Walan, a program manager in DARPA’s Tactical Technology Office. “Innovative advances envisioned by this new DARPA program will showcase an X-plane demonstrator that offers warfighters new capabilities during extended maritime operations.”
To address the shortcomings of existing vehicles and operational concepts, the Liberty Lifter program focuses on addressing three main challenges.
The first one is extended maritime operations, which will place emphasis on operating in turbulent sea states by creating high-lift abilities at low speeds to reduce wave impact load during takeoff/landing, and innovative design solutions to absorb wave forces. In addition, the project will address risks of vehicle collision during high-speed operation in congested environments. Finally, the aim is for the vehicle to operate at sea for weeks at a time without land-based maintenance activities.
The second challenge will be full-scale affordable production, with the aim of prioritizing low-cost, easy-to-fabricate designs over exquisite, low-weight concepts. Materials should be more affordable than those in traditional aircraft manufacturing and available to be purchased in large quantities.
The final challenge will be the development of advanced sensors and control schemes to avoid large waves and to handle aero/hydro-dynamic interactions during takeoff/landing.
In the RFI from August 2021, DARPA also said the plane should have a large operational payload (over 100 tons) and the capability of carrying multiple amphibious vehicles.
Normally when i think of DARPA, I think something along the lines of "near-magical sci-fi technologies." Now I'll have to think of "1990's-level half-assed CGI."
Turns out price is a technology and I wouldn't sleep on the boundary layer control either.
Normally when i think of DARPA, I think something along the lines of "near-magical sci-fi technologies." Now I'll have to think of "1990's-level half-assed CGI."
The planned Liberty Lifter demonstrator will be a large flying boat similar in size and capacity to the C-17 Globemaster III transport aircraft. Goals include takeoff and land in Sea State 4, sustained on-water operation up to Sea State 5, and extended flight close to the water in ground effect with the capability to fly out of ground effect at altitudes up to 10,000 feet above sea level.
During Phase 1, DARPA will work with both performer teams and Department of Defense stakeholders to refine the Liberty Lifter designs with particular attention to operational needs and operating concepts. The Phase 1 contract awards are for an 18-month period of performance with six months of conceptual design work and nine months of design maturation culminating in a preliminary design review. There will be an additional three months for manufacturing planning and test/demonstration planning reviews.
As scheduled, Phase 1 will transition into Phase 2 in mid-2024 with continued detailed design, manufacturing, and demonstration of a full-scale Liberty Lifter X-Plane. DARPA anticipates teaming with one or more DoD Service and international partners for those activities and further development of the Liberty Lifter concept into an operational vehicle.
Howard Hughes would be proud!https://www.ga-asi.com/ga-asi-selected-by-darpa-to-support-liberty-lifter-programhttps://www.darpa.mil/news-events/2023-02-01The planned Liberty Lifter demonstrator will be a large flying boat similar in size and capacity to the C-17 Globemaster III transport aircraft. Goals include takeoff and land in Sea State 4, sustained on-water operation up to Sea State 5, and extended flight close to the water in ground effect with the capability to fly out of ground effect at altitudes up to 10,000 feet above sea level.
During Phase 1, DARPA will work with both performer teams and Department of Defense stakeholders to refine the Liberty Lifter designs with particular attention to operational needs and operating concepts. The Phase 1 contract awards are for an 18-month period of performance with six months of conceptual design work and nine months of design maturation culminating in a preliminary design review. There will be an additional three months for manufacturing planning and test/demonstration planning reviews.
As scheduled, Phase 1 will transition into Phase 2 in mid-2024 with continued detailed design, manufacturing, and demonstration of a full-scale Liberty Lifter X-Plane. DARPA anticipates teaming with one or more DoD Service and international partners for those activities and further development of the Liberty Lifter concept into an operational vehicle.
Aurora Flight Sciences point-of-departure design more closely resembles a traditional flying boat, with a single hull, high wing and eight turboprops for primary propulsion.
View attachment 692456
General Atomics-Aeronautical Systems and Aurora Flight Sciences on 27 July each received contracts valued around $20 million to fund continued development efforts for the Liberty Lifter – a wing-in-ground-effect seaplane meant to carry loads of 90,000kg (200,000lb) or greater.
The 27 July contract announcement significantly raised DARPA’s commitment to the Liberty Lifter project, as the agency exercised options on both companies’ initial proposals. General Atomics will receive $21.5 million to fund additional work, while Aurora’s additional share is $19.5 million.
DARPA hopes to begin the next phase of the programme in mid-2024, which will include detailed design, manufacturing and flight demonstration of full-scale Liberty Lifter craft.
Why go for a 69 Jeep Wagoneer, when you can get a shiny new touring bus!Now we know why SOCOM ditched the C-130 floatplane idea.
When the Hughes H4 and an Orlyonok love each other very much...
Designing and Building a large flying boat hasn't seemed like a "DARPA Hard" problem for some time...
From the article:Designing and Building a large flying boat hasn't seemed like a "DARPA Hard" problem for some time...
???!!!DARPA also said more work needs to be done to blend maritime construction with aircraft certification.
One element on the program was to use maritime construction methods to make big aeroplanes cheaper.DARPA also said more work needs to be done to blend maritime construction with aircraft certification.
That is entirely the point. DARPA programs are meant to fail. Low risk programs should be done by other organisations.Classic DARPA - notch up one more for the trail of broken projects... Failure seems to be a feature and not a bug in that agency.
If you plan to start an actual hardware system program just in order to identify technology risks, you are clearly doing it completely wrong. Projects should be started with the intent to succeed, not to fail just to find out how NOT to do it. Abandoning halfway built prototypes and then telling the taxpayer "we meant to do that" is not just utterly fiscally irresponsible, but borderline offensive. For example, XSP held real promise (otherwise it wouldn't even have been started, right?), and to just shut it down halfway through before actually testing it to gain real life operational data because "we found it's too easy for us to do" would squarely fall under financial waste, fraud, and abuse.One element on the program was to use maritime construction methods to make big aeroplanes cheaper.
That is entirely the point. DARPA programs are meant to fail. Low risk programs should be done by other organisations.
The issue here is not starting low benefit programs rather than it stopping. Various companies have built large flying boats before. There was no real technology risk.
Say in that example, if the risk was found to be low, then the model is to transition out of DARPA at the end of a phase of work and get someone else to pay for continued development. It's not DARPA's role actually do system development to product phase. In this case, no one else was interested enough to actually pay for further XSP development.For example, XSP held real promise (otherwise it wouldn't even have been started, right?), and to just shut it down halfway through before actually testing it to gain real life operational data because "we found it's too easy for us to do" would squarely fall under financial waste, fraud, and abuse.
Fortunately DARPA sheparded the LRASM anti-ship derivative of the Air Force JASSM through development and into flight test. The Navy had to be pulled by the nose, with a minimal $$ contribution, until the Air Force conducted flight demonstrations with a B-1B. Without the push by DARPA, the Navy would still be looking to continue the evolution of the Harpoon and SLAM-ER.Say in that example, if the risk was found to be low, then the model is to transition out of DARPA at the end of a phase of work and get someone else to pay for continued development. It's not DARPA's role actually do system development to product phase. In this case, no one else was interested enough to actually pay for further XSP development.