Tranche 1, which is the initial warfighting capability, will consist of 154 operational space vehicles, including 126 transport layer satellites and 28 tracking layer systems, as well as four missile defense demonstration platforms, according to a Space Force release.
Tranche 2, which will be made up of 270 operational transport and tracking layer satellites, is scheduled to begin launching in late 2026 and is in the post-critical design review stage, preparing for assembly, integration and testing, Sandhoo said.
https://www.nationaldefensemagazine...will be,integration and testing, Sandhoo said.