I have been reading about postwar VTOL transport aircraft concepts, and many of them appear to have offered useful operational advantages but never progressed beyond design studies or prototypes.In your opinion, what was usually the main reason these projects were cancelled?Was it primarily engine efficiency, payload and range limitations, hot-gas ingestion, maintenance requirements, development cost, or changes in military doctrine?I would also be interested to know whether there are any cancelled VTOL transport concepts that might be more practical today with modern engines, materials, and flight-control systems.Any recommendations for project reports, books, or other primary sources would be appreciated.
All-
Howdy !
#1 - For the newer age E-VTOLs…..Money….
and the investment levels truely required for these programs to stay viable.
In addition, some developers presented faulted business models and presented over-hyped products. Uber was an early-on investor that proffered ernest money, only to come to the realization that E-VTOL urban transportation would not become the type of
“ door-to-door “ service they provided using automobiles…. and they dropped out.
Protracted development times and engineering challenges increasingly drove up
program costs. The E-VTOL developers ( intent on becoming manufacturers ) always needed massive infusions of money… to keep things going.
New technology hurdles needed to be overcome, such as….flight worthy electric motor development, high DC volt circuitry and associated components, distributed propulsion;
just to name a few.
Battery performance to-date, has perpetually lagged hoped for performance levels.
The situation improves, but… at a rate that many consider far from ideal.
Non-existent charging infrastructure needed to be developed, fairly standardized; and put in-place at strategic locations within participating cities/countries. Suitable landing and takeoff facilities and their associated terminals needed to be established.
Urban air mobility integration into the overall air traffic control environment has proven to be a significant challenge; on its own.
Costs and efforts required for establishing new E-VTOL production facilities, selecting component vendors, and setting up a reliable aircraft components supply chain; all played a huge role. Too many programs competed for some of the same items, and the
E-VTOL developer field today continues to downsize.
Ahead, lie the costs and time required for flight certification efforts for programs that are
mostly an entirely new realm of air transportation. This area of bringing E-VTOL transportation to fruition is only now beginning to be entered by the earliest bow wave of developers.
With regards,
357Mag