So someone needs to keep a very firm hand in the project management, likely to say "No, the BWB is going to be the KC-Z, the transport is going to be tube and wing. End of discussion."If Boeing leveraged their experience with the 747-8 program to build a practical modern day replacement that doesn't reinvent the wheel we could have a C-5 sized replacement with modern engines, avionics and a composite airframe in a reasonable time frame. But if the USAF starts fantasizing about a giant BWB concept then it'll be about 20 plus years for a replacement.
Its likely too late to restart the 747-8 line, but getting some low hour 747s and reusing as much components as possible on a new fuselage should be doable, or simply refurbishing 8Fs.If Boeing leveraged their experience with the 747-8 program to build a practical modern day replacement that doesn't reinvent the wheel we could have a C-5 sized replacement with modern engines, avionics and a composite airframe in a reasonable time frame. But if the USAF starts fantasizing about a giant BWB concept then it'll be about 20 plus years for a replacement.
No, "they" really can't. It would take too long and there are better ways to get a better airplane.They could simply build new ones...
Outside of systems components, that doesn't make things any easier. And even then you're better off adopting COTS hardware from a recent popular airliner or something like the 767 that's in widespread government use.getting some low hour 747s and reusing as much components as possible on a new fuselage
Sigh...and enough of the jigging still around.
When was the last time that happened?Keep it simple and ruthlessly trim administrative overhead. Fixed-price contract with good incentives for early delivery, resist the temptation to make changes.
IIRC the F-14 was a fixed-price contract, with severe penalties for being overweight or late.When was the last time that happened?
It's the belief that as long as we have The Tooling!! it'll be cheap, fast, and easy to just crank the line back up again.I wonder what's up with the mindset of proposing several times over and over again reopening production lines of decades old, long gone, obsolete aircraft recently.
I think the tanker can be a fully BWB, but a dedicated transport is likely best served by LockMart's HWB design.We may possibly be moving into the blended-wing-body era? Will be interesting when Jet Zero/NG fly and flight test the full-scale BWB demonstrator. Aircraft moving along the manufacturing process at Scaled's facility in Mojave.
BWB tanker, definitely. Cargo, possibly but could be a HWB/Speed Agile platform as well. BWB and HWB may begin to pickup traction,we need to and its time to evolve into new tech.I think the tanker can be a fully BWB, but a dedicated transport is likely best served by LockMart's HWB design.
If you don't get new and unproven players into the business and give them a shot you're stuck with the same threeSuch big money for Startup that hasn't build anything to this day is a weird choice of investment. What about LM Skunkworks ? Aren't they anymore in the phone book?
You're referring to the JetZero BWB demonstrator (first flight in 2027), right? If you hand the demonstrator project over to Lockheed Martin, they'll drag their feet.Such big money for Startup that hasn't build anything to this day is a weird choice of investment. What about LM Skunkworks ? Aren't they anymore in the phone book?
Hard to blame them when the next administration could cancel the whole thing, leaving LM holding the bag.You're referring to the JetZero BWB demonstrator (first flight in 2027), right? If you hand the demonstrator project over to Lockheed Martin, they'll drag their feet.
Restarting C-17 production while using a newer engine is probably the prudent thing to do assuming Long Beach has the production capacity and enough of the jigging still around.
I believe that shaping has gotten cheap enough that adding it to a design intended for the military is a trivial cost, yes.Or is it just a matter of basic L/O shaping and materials having become so relatively affordable to implement that you may as well throw it in there for whatever benefit it can get you?
It's an extremely high value thing, flying where people are going to shoot at it.Also, why would an airlift need to be stealthy? You're not going to load off stuff at the frontline anyway, parachute into nowhere? These times are long gone, the circumstance that you can find MANPADS virtually anywhere these days ensures that, or even mobile SAM systems really. Protection against missiles launched from other aircraft? Active countermeasures like DIRCM and the future possibility of hard-kill solutions seems more promising and less compromising than a stealth airlifter because everything needs to be stealthy and modern and cool and sharp looking. Stealth airlifters, stealth aircraft carriers, stealth shovels, stealth soldiers, stealth chairs, yeah.
Unfortunately, in recent times, I don't think LM ADP functions like they used to (lower cost and highly efficient), probably due to new management structure. This is one reason NG had kept their 49% stake in Scaled Composites many years then finally they own Scaled outright, Scaled is efficient and very program cost effective. Hopefully, ADP is moving back towards the way they used to execute programs.Such big money for Startup that hasn't build anything to this day is a weird choice of investment. What about LM Skunkworks ? Aren't they anymore in the phone book?
If that's your concern, flying directly at or over the line of contact (because otherwise no, it's unlikely your airlift will be shot at as it's firmly in your rearward positions to load off), then you need B-21 levels of stealth, good luck funding a stealth airlifter of that size and low observable quality.It's an extremely high value thing, flying where people are going to shoot at it.
So protecting the thing is kinda important.
Remember that this is supposed to be a combo transport/tanker.If that's your concern, flying directly at or over the line of contact (because otherwise no, it's unlikely your airlift will be shot at as it's firmly in your rearward positions to load off), then you need B-21 levels of stealth, good luck funding a stealth airlifter of that size and low observable quality.
Not sure I agree. AMC-X or MACK is probably a better baseline for an LO airlifterPoint being, I wouldn't be surprised if NGAL just looks like a bigger Tacit Blue
Points for a very interesting idea!I'm a bit late to the party here but must say that I'm surprised no one has mentioned Tacit Blue, which is what I'd imagine a LO tube and wing NGAL aircraft would look like.
Those are certainly possible configurations as well but both of those designs seem to have issues, at least to my untrained eyes, although I'd happily defer to the authority of the actual aerospace engineers on here.Not sure I agree. AMC-X or MACK is probably a better baseline for an LO airlifter
I have a very unhealthy obsession with the white whales of military procurement, Tacit Blue and the Zumwalt class in particular, so it's probably better for your health that it didn't come to mind lolPoints for a very interesting idea!
I hadn't considered that. At all. Dang it, overscan, where's the embarrassed emoji on this forum?!?
We probably shouldn't discuss my fascination with the Future Combat Systems - Manned Ground Vehicles for most of a decade, then.I have a very unhealthy obsession with the white whales of military procurement, Tacit Blue and the Zumwalt class in particular, so it's probably better for your health that it didn't come to mind lol
As critical design constraints for the next-generation airlift platform, the USAF stipulates that all proposed aircraft must possess a wingspan of strictly less than 223 feet and demonstrate the capability to carry a minimum payload of 160,000 pounds over a distance of at least 2,500 nautical miles unrefueled. The absolute dimensional limitation is dictated by the physical constraints of existing global airfield infrastructure—including taxiways, hangars, and parking ramps—ensuring seamless integration into current mobility CUCUI operations. Concurrently, the specified payload and range parameters are baseline mission imperatives for effective power projection and logistics support.