£A72 million for the ship only was exactly what I said. So was the £A58 million for an Oriskany. See Message 74.
To be pedantic the estimated cost of a CVA.01 (ship only) was £A72.5 million in 1964 and which was £A14.5 million (25%) more than the estimated cost of a modernised Oriskany (ship only). The expected delivery of the Oriskany was 1968 and the expected delivery of a CVA.01 was 1972-74.
I reiterate that the the estimated costs were the estimated costs for the ships only, which, ipso facto, doesn't include the cost of the aircraft. But said aircraft would cost exactly the same regardless of which ship they were operating from. Furthermore, as I already wrote in an earlier post (albeit in a different way) the cost of the aircraft purchased for Melbourne IOTL has to be deducted from the costs of the aircraft required for a new ship or a modernised Oriskany. For that matter so does the cost of the refits that Melbourne had to enable her to operate Skyhawks and Trackers.
I've been wittering on about the compliments of Melbourne, Sydney, the Essex class and CVA.01 because it's clear to me that a CVA.01 and a modernised Oriskany would have the same size crew when operating the same number of aircraft and the same types of aircraft. Therefore, if Australia can find enough men for an Oriskany, it can find enough men for a CVA.01. Conversely, if Australia cant find enough men for a CVA.01, it can't find enough men for a modernised Oriskany.
If Her Majesty's Australian Government had decided to buy a CVA.01 in 1964, it's unlikely that they would have got it on time and at cost. However, getting a modernised Oriskany on time and at cost is rather unlikely too. E.g. Midway's SCB.101 refit took twice as long and cost nearly 2.5 times longer than estimated. I suspect that in practice the difference between the cost of a modernised Oriskany and a new CVA.01 would not have been less than 25%.
That's if any Oriskanys were for sale. This is not long before the full-scale US involvement in the Vietnam War when the USN suddenly needed every attack carrier it could get.
So they'd have to buy a SCB.27A Essex with hydraulic catapults or one of the surviving unmodernised Essexes, both of which would take longer and cost more to modernise to the required standard than an Oriskany.
Or they'd have to wait several years for one of the Oriskany's became available. Plus when it did become available the refit would cost more and take longer than estimated in 1964 because of the extra wear and tear due to its several years of service in the Vietnam War.
So if they're going to replace Melbourne, do it properly by buying a new ship. Either a CVA.01 from the British or a SCB.100 from the Americans.
Except, a SCB.100 was estimated to cost even more than a CVA.01. Plus if the first 3 Nimitz class are anything to go buy the time and cost overruns on a SCB.100 would be even worse than what I expect they would have been for a CVA.01 ITTL and were IOTL for the Invincible class.