The E-6s will remain in service the longest for sure, but there remain many other airframes like the RC-135 which need replacing, apart from the many other types of aircraft that are in service that are slated for replacement within the next twenty-five years.
 
I also wonder whether there are any specialised versions of the KC-46 to replace the RC-135 fleet, as those would also need replacing. I've only just begun to realise the enormity of what needs to be replaced in US service, and many aircraft are threatened by being retired prematurely without a replacement even in the works, let alone under development.
That was what the E-10 was effectively supposed to be. IIRC Spiral 1 would have replaced JSTARS, Spiral 2 AWACS and Spiral 3 the RC-135s and other spooky airframes. And of course E-10 was another 767 variant.
 
Sounds like a classic requirements failure to me. If it was a logic error you'd expect it to affect whatever data you typed in, but they clearly can type in the correct data and get the correct results. That says it's an error in the data held for each aircraft type, and the fact it's every aircraft, rather than one or two, says it's not a coding failure, it's an issue with the data supplied not matching the rest of the requirements.
 
As hinted above (both posts), It sounds like something that fall down b/w contractor and client responsibilities: either the input data were inadequate or the processing logic was not designed for the variable to get a correct output (one or more entry is for example a constant in the program, hence the need to reboot).

If any of the party wasn't willing to admit the fault, it can be that the litigation delayed the introduction of a fix to the point that nothing can be done until the next block (software encoding).

Stupid but business.
 
If any of the party wasn't willing to admit the fault, it can be that the litigation delayed the introduction of a fix to the point that nothing can be done until the next block (software encoding).
There's no need to invoke the dark arts of litigation, issuing a fix isn't necessarily as easy as people think. With a large, safety critical system (and the boom is definitely safety critical), the full release process can realistically take several months. Even if it's a five minute fix. (Note however the difference between a production software release and a development one, we could turn development releases round in 24 hours, but that's why test pilots get big money).

You may well run into situations where the software you need to fix has moved on in the interim, and is dependent on other code that has also moved on and which may not be ready for release. Which creates a dilemma, do you fork the code to produce a patch that can go out now, but no longer represents the main development path (and which will still need implementing in the main development path), or do you wait to bring it all together at the next release.

To formally release software you need to close out all the changes going into it, which on a large project may take weeks (handling that was the only time I ever had 30 engineers working directly for me, and it still took weeks), then rerun the test suite, which in itself can take weeks, then get every one of the airworthiness folks together to sign off on the release (schedules to be managed if they're coming from all over). And only then do you hand it over to your release guy to put it together and send it out.
 
Maybe they are more worn-out because so few were procured in the first place (some dozens - 60 - versus many hundreds KC-135s).

Why didn't USAF bought more KC-10s, in passing ? The 135s were already old by 1980. I DO know the KC-10 was far more expensive to procure, but they should have picked a better balance than 60 - 600 (and counting).

Let's say, 120 KC-10s allowing more KC-135s to be retired - and on, and on.

"more KC-10s" via Google books brings some limited information.

https://www.google.com/search?q="mo...XCxoUKHbRnA50Q_AUoAXoECAEQCw&biw=1024&bih=643
 
Last edited:
A USAF General walks into a Boeing dealership, where he is met by the salesman. They sit down, and talk business, and the General decides to buy a few KC-46s.

When they were done, the General asked: "So, when can I expect the first to arrive?"

"In 10-15 years," the Boeing salesman replied.

"Morning or evening?" replied the General.

"Why does it matter?" said the salesman.

"Lockheed told me the F-35 is coming in the morning."

(Yes, it's a rehash of the old Lada joke, I know, I'm the king of originality)
 
Its sounds like a bad joke...
A Boeing salesman walks into the Air Force Pentagon office and says
"I have a bridge (tanker) to sold... interested ?"
Only then, the Bridge Tanker would take longer to develop, so they need to develop a Bridge for the Bridge Tanker. But that would get delayed too, so they have to get a Bridge for the Bridge for the Bridge Tanker. But then the budget would be tight, so another Bridge for the Bridge, for the Bridge.....you get the idea.
 
Its sounds like a bad joke...
A Boeing salesman walks into the Air Force Pentagon office and says
"I have a bridge (tanker) to sold... interested ?"
You can pick the tanker up in Brooklyn the salesman says. Hopefully, the USAF did not mean we needed a fourth for Bridge but played on a tanker....
 
I am not sure that something as big as an a330 fits well in the new USAF's force mobility concept. So I will urge enthusiasts to not over expect on the result.
 
It would be heavily ironic if they just get the KC-767, it would give the same capability as the KC-46, but without all the mishaps, and delays.

Was the KC-46 not based on the 767 airliner anyway? It would certainly be interesting to see what route the USAF take with the Bridge Tanker.
 
Joking or not, the USAF has no interest in buying a tanker that has less offload capability than the KC-135R. The KC-767 has dramatically less fuel offload capability compared to the Stratotanker.

The 767-2C airframe was created rectify that problem, which Boeing recognized in the aftermath of the initial KC-X competition. The KC-46 is a much heavier aircraft than the KC-767, or the Advanced Tanker that Boeing bid for KC-X Round 1.

The baseline KC-767 also wouldn't meet USAF survivability requirements either, particularly in regards to EMP protection that is a major part of the KC-46 program.
 
View: https://youtu.be/PYZErjj22rE
The first Boeing KC-46A tanker built for the Japan Air Self-Defense Force (JASDF) recently refueled another KC-46A aircraft in the skies over Washington state.

The Japan-bound tanker also successfully received fuel in return.

“Refueling with the first Japan KC-46A is an important milestone for the Japan Air Self-Defense Force,” said Jamie Burgess, KC-46 program manager. “KC-46A is the world’s most advanced air refueling aircraft and has already transferred more than 42 million gallons of fuel to other aircraft globally through its boom and drogue systems.”

Japan is the KC-46 program’s first non-U.S. customer and is scheduled to receive its first aircraft this year.
https://japantoday.com/category/bus...c-46a-tanker-completes-first-refueling-flight
 

Similar threads

Back
Top Bottom