- Joined
- 28 January 2008
- Messages
- 1,645
- Reaction score
- 4,210
All of the F-22 tooling is gone, there are time periods the Govt establishes for how long the prime stores and maintains the tooling after production ends. The USAF and USN really need to nail down their requirements for NGAD and F/A-XX and STREAMLINE the programs. Example: My current company, we were quoting subsystem components for the V280 and the amount of SDRLs was astounding to what was flowed from the Army down to Bell plus I am amazed the Army actually selected a platform and put a prime under contract since we know the Amy does not have a very good track record. 75% of the cost was bureaucracy, duplicated requirements and general non-meat fillers.A thought just occurred to me, with the new incoming Fanta Fascist administration I wonder if they will be crazy enough to go "Screw it, let's restart production of the F-22"?
We (the US) apparently developed, built and flown an NGAD demonstrator within a 12-month period (I think there were 3 platforms, one from each prime but I could be wrong) and it seemed to validate some new tech and performance. I am also sure our intelligence agencies are working overtime regarding the two new Chinese aircraft including their new naval ships as well. The US has to re-think our procurement system for new hardware and systems, we use to be able to build excellent aircraft but that was many decades ago.