https://interestingengineering.com/...-to-be-the-worlds-largest-aircraft-ever-built
Radias Windrunner, designed to carry windmill blades
Radias Windrunner, designed to carry windmill blades
Shurely shome mishtake?a vast carrying capacity of up to 80 tons – twelve times that of the Boeing 747."
Probably still better to invest in modular blades or airships.The design doesn't look terribly innovative, just big.
"Measuring an astounding 356 feet long, with a height of 79 feet and a wingspan of 261 feet, it outstrips the Boeing 747-8’s length by 106 feet. To put things in perspective, the Windrunner is almost as long as an NFL football field. Its exceptional size translates to a vast carrying capacity of up to 80 tons – twelve times that of the Boeing 747."
Getting a fundamental parameter like payload capability by over an order of magnitude wrong, see https://www.boeing.com/content/dam/...about_bca/startup/pdf/freighters/747-400f.pdf, does not instill confidence in Radia.Its exceptional size translates to a vast carrying capacity of up to 80 tons – twelve times that of the Boeing 747.
To be fair, the Radia website gives the payload as "160,000 lbs / 72,575 kg," doesn't make that comparison to the 747. The "12 times 747" line seems to come from the journilizmizers at "Interesting Engineering."Getting a fundamental parameter like payload capability by over an order of magnitude wrong, see https://www.boeing.com/content/dam/...about_bca/startup/pdf/freighters/747-400f.pdf, does not instill confidence in Radia.
They claim that customers would need to build 6,000 foot long, semi-improved airstrips near wind turbine construction sites.
I mean, there's a small use case for LTA transport. Sufficiently small that these days it's almost all advertising and not cargo hauling. Especially when there are helicopters that can lift 20+ tons.The time of the modern zeppelin has come at last. Soon! Any day now!
Be my guest !The time of the modern zeppelin has come at last. Soon! Any day now!
Shorts Stirling climb performance was hampered by too short a wing. The “less than 100 foot wingspan” was based upon a pre-war RAF specification related to hangar sizes. Poor climb performance meant that Stirlings struggled to climb above the worst German flack.
"Congested nose" seems more aproposConsidering what it's being designed to carry, wouldn't a better name be "Bladerunner"?
Even better, most of the places where they're putting Wind Tubines on ridgelines, the ridgelines are at a significant angle to the wind.The problem is, that most flat planes are easily accessible by land vehicles and most mountainous regions are unsuitable for building long runways.
There's probably still a decent market for large wind turbines onshore, I can think of several places with lots of wind that could have wind farms but don't at present.The old RC-1 concept for bringing oil down from Northern Alaska did it better.
Aside from the issues building a landing strip near wind farms, I'm skeptical there'll be enough of a market for extremely large onshore turbines to make this work. Seems like offshore is the favored thing for wind now.
Land at dawn before the wind picks up. You will also have to plan for a clear morning ... or at least a high ceiling.Even better, most of the places where they're putting Wind Tubines on ridgelines, the ridgelines are at a significant angle to the wind.
So even if you do get permission to chop a 3km long landing strip for the Windrunners to land on, they're going to be in a near 90deg crosswind!
But don't they cause cancer though??? I think I heard that from someone in this year's US election cycle...There's probably still a decent market for large wind turbines onshore, I can think of several places with lots of wind that could have wind farms but don't at present.
But in terms of the really big turbine farms, offshore is easier to get permits for and doesn't have people whining about the view.
California causes cancer.But don't they cause cancer though??? I think I heard that from someone in this year's US election cycle...
They produce cancer and at least indirectly, the EU commission confirms that. PFAS can cause cancer (According to the EU) and wind turbines are the largest sauce of PFAS emissions. Every winturbine emmits about 300 kg PFAS during it's lifetime, due to abbrasive mass loss of the blade coating. In Germany, it is recommended not to eat the liver of wild pics any longer due to high PFAS contamination.But don't they cause cancer though??? I think I heard that from someone in this year's US election cycle...
Does that mean you'll stay as far away from CA as possible? Mutually beneficial decision for both of us thenCalifornia causes cancer.
More like who I'm voting against...Does that mean you'll stay as far away from CA as possible? Mutually beneficial decision for both of us then! I think I know though who you'll be voting for
.
Potato, potatoe...More like who I'm voting against...
I sincerely hope Americans will not continue on this track of vilifying each other - you will be your own worst enemies.More like who I'm voting against...
Give me candidates to vote for, then.I sincerely hope Americans will not continue on this track of vilifying each other - you will be your own worst enemies.
I was reflecting on this, but we are getting more and more off topic.California causes cancer.
If you follow the link the plan view comparison suggests to me that the wing area is reasonable for a 72 ton payload. Building a niche product to fulfill a niche need is probably financially a better plan than building a cool plane and then looking for customers.I had completely missed that project. https://www.armyrecognition.com/new...gest-transport-aircraft-with-7-702-m-capacity
My mind is completely blown.
Problem is that the places you want to put wind turbines are terrible places to put temporary runways.If you follow the link the plan view comparison suggests to me that the wing area is reasonable for a 72 ton payload. Building a niche product to fulfill a niche need is probably financially a better plan than building a cool plane and then looking for customers.
Well as I understand it the project came out of the indentified need to move blades, so they must have thought about it. I'm also thinking you don't need the destination airport to be that close to the wind farm, you just need a clear run by road between the two without any troublesome obstructions.Problem is that the places you want to put wind turbines are terrible places to put temporary runways.
That wasn't the CONOPS I read, they clearly talked about landing more or less at the site of the turbine generators.Well as I understand it the project came out of the indentified need to move blades, so they must have thought about it. I'm also thinking you don't need the destination airport to be that close to the wind farm, you just need a clear run by road between the two without any troublesome obstructions.