To the extent the USN was in the past fearful of ACE timelines - rightly it appears - and was worried designing F/A-XX with adaptive engines would stretch program timelines, you have to laugh at where the program stands today - delayed, perhaps indefinitely, with the silver lining that these delays might give the USN a chance to redesign F/A-XX to fly with adaptive engines right off the bat, assuming there are no operational bogeymen (huge assumption).
My understanding is that at least in the past, that USAF wanted power, cooling and thermal mgmt tightly integrated to maximize the benefits of the third stream; if F-47 does in fact fly with interim engines, would that require space and volume for a standalone PTMS with each engine or is this a non issue? Thanks in advance