I think their opinion is incorrect. There can be concurrency between engine and airframe development. The XA102 and XA103 could be considered scaled down versions of the XA100 and XA101. Most of the technology is mature. The engine manufacturers are ahead of schedule in my opinion.

There would still be 5 years until these engines enter service. The F-47 still need to have the first flight, flight testing and low rate production periods.

It is perfectly acceptable for the first flight to be performed with engines that have low durability. The service lives of most fighter jet engines usually increase over the first decade of service. They even fit newer improved parts to older engines when they come in for maintenance.
 
Their worries are about production line and availabillity for mass deployment. As for tehcnology, lets be honest most of the design and material technology is made within the civil engineering for commercial aircraft and other side industries benefiting from them, examples being ceramics etc. The whole systems other than the military specific software and requirements are already being used in existing civil aircrafts like the Boeing 787 or latest Airbus equivalent.
 
So will the new engines be in a fly off between Pratt and Whitney and General Electric like what they did during the ATF contest?
 
Well this is news:

“Although the engine program was originally aimed at the U.S. Air Force’s Next-Generation Air Dominance (NGAD) fighter when the NGAP program launched in 2022, the initiative is now focused on later production versions of the aircraft. The initial Increment 1 production Boeing F-47 model is to be powered by an existing unidentified military engine, as neither NGAP option will be sufficiently developed in time to meet the Air Force’s end-of-decade service entry target.”
 
Well this is news:

“Although the engine program was originally aimed at the U.S. Air Force’s Next-Generation Air Dominance (NGAD) fighter when the NGAP program launched in 2022, the initiative is now focused on later production versions of the aircraft. The initial Increment 1 production Boeing F-47 model is to be powered by an existing unidentified military engine, as neither NGAP option will be sufficiently developed in time to meet the Air Force’s end-of-decade service entry target.”
Is this from the AviationWeek report, which is behind the pay wall?

https://aviationweek.com/defense/ai...air-force-pushes-widen-roles-adaptive-engines
 
Well this is news:

“Although the engine program was originally aimed at the U.S. Air Force’s Next-Generation Air Dominance (NGAD) fighter when the NGAP program launched in 2022, the initiative is now focused on later production versions of the aircraft. The initial Increment 1 production Boeing F-47 model is to be powered by an existing unidentified military engine, as neither NGAP option will be sufficiently developed in time to meet the Air Force’s end-of-decade service entry target.”
So presumably it's going to be a modified F-135 on increment 1 F-47?
 
This is not new. We know since Trump 2 that NGAP will not be ready for earlier airframe.

What is interesting here is the mention that the NGAP presented as being the engine for the F-47 does not have an integrated afterburner. We can only conclude today that it was intended to have an ejector/outside post combustion setup.
 
Last edited:
This is not new. We know since Trump 2 that NGAP will not be ready for earlier airframe.

What is interesting here is the mention that the NGAP presented as being the engine for the F-47 doe snot have an integrated afterburner. We can k ly conclude today that it was intended to have an ejector/outside post combustion setup.
That's not what that says.

"As GE Aero & P&W prepare to assemble the first variable-cycle combat engines under the Next-Generation Adaptive Propulsion (NGAP) program, USAF has revealed it is also studying non afterburning derivatives of the concept for supporting mission roles."
 
GE Aerospace Clears Assembly Readiness Review of Adaptive Cycle Engine for U.S. Air Force

Cincinnati, OH – GE Aerospace today announced the successful completion of the Assembly Readiness Review (ARR) for its XA102 adaptive cycle engine, a critical milestone in support of the U.S. Air Force’s Next Generation Adaptive Propulsion (NGAP) program. This achievement marks a significant step forward in delivering revolutionary propulsion technology for the Air Force’s future fleet.

The ARR validates that the XA102 engine design, manufacturing processes, and supply chain are progressing and on schedule to be awarded the next phase later this year. Central to this milestone is GE Aerospace’s comprehensive digital engine model, which leverages a model-based definition approach in place of traditional two-dimensional drawings. This digital framework integrates model-based manufacturing and model-based inspection, which enables improved accuracy and accelerated production timelines.

All demonstrations for the model-based engine associated with the first phase of the program have also been successfully completed, highlighting GE Aerospace’s continued progress in advancing digital engineering capabilities.

“With the completion of the Assembly Readiness Review, we are demonstrating the maturity of our XA102 engine design and the strength of our digital-first approach to developing next-generation propulsion systems,” said Dr. Steve “Doogie” Russell, vice president and general manager of Edison Works at GE Aerospace. “Our use of a fully integrated digital engine model, which spans design, manufacturing, and inspection, positions us to deliver advanced capability faster and with greater precision for the warfighter.”

The NGAP Program is advancing technologies and manufacturing capabilities crucial for air superiority in the highly contested combat environments of the future. These technologies will enable next generation fighter aircraft with improved range, survivability and thermal management capabilities for advanced weapons and sensors. GE Aerospace’s leadership in adaptive cycle technology builds on more than 100 years of innovation and partnership with the U.S. military. The XA100 engines completed multiple successful rounds of testing, maturing adaptive engine technologies. The XA102 engine represents the next evolution of propulsion, delivering enhanced capability while maintaining a focus on affordability and sustainability.

https://www.geaerospace.com/news/pr...ess-review-adaptive-cycle-engine-us-air-force
 
The journalist has used incorrect wording and terminology and completely misrepresented to get clicks.

The announcement is that development funding will finish in 2031. That means a perfect engine will be fully developed by 2031 ready for full rate production. This means there will be engines available many years earlier for flight testing and low rate production. These early engines will most likely not be rated to full service life and require more frequent inspection. This is totally normal.

The journalist is trying to suggest there could be a 3 year delay until the first engine is ready causing a delay for the F-47. This is not the case.
 
So presumably it's going to be a modified F-135 on increment 1 F-47?
The more plausible option is an undisclosed variable-cycle engine variant derived from the F110, which was selected as F/A-XX baseline propulsion system many years ago. And based on the information from the article "F110-GE-129 EFE — Enhanced Power Through Low Risk Derivative Technology", it should be F110-GE-129EFE++. In addition, GE and Allison were working on an F110 development as one of alternative of JAST. It was claimed that the new F110 engine of about 25000 lb dry thrust and 40000 lb with AB.https://books.google.com/books?id=t...mEFkFHQCwAA8Q6AF6BAgEEAM#f110 ge allison jast
 
DEPARTMENT OF DEFENSE APPROPRIATIONS BILL, 2025 REPORT OF THE COMMITTEE ON APPROPRIATIONS together with MINORITY VIEWS [TO ACCOMPANY H.R. 8774] JUNE 17, 2024. Committed to the Committee of the Whole House on the State of the Union and ordered to be printed :

FIGHTER AIRCRAFT ENGINE DEVELOPMENT

The Committee notes an Air Force-requested technical adjustment to the fiscal year 2025 President’s budget request realigning $562,337,000 from the Advanced Engine Development (AED) pro- gram to the Next Generation Adaptive Propulsion (NGAP) pro- gram. The steady progress toward meeting future Next Generation Air Dominance engine requirements is underscored by industrial base competition, which the Committee expects to last through fu- ture NGAP development phases. The Committee is supportive of NGAP and therefore recommends a realignment of $532,337,000 to the program.

The Committee also remains supportive of a consistent pipeline of engine development for fighter aircraft and a healthy engine industrial base. The Committee directs that the $30,000,000 remaining in the AED program shall be used to develop advanced engine technologies for integration into future engine development pro- grams. This can include investments in adaptive cycle engine technologies, improved manufacturing techniques for engine components, development of novel materials, integration of enhanced digital design capabilities into the engine development process, supply chain maturation, and risk reduction. These funds are not intended to incentivize the Air Force, or any other Service, to create an alternative engine program for the F-35, and a general provision is included in this Act that prohibits the use of funds to integrate an alternative engine on any F–35 aircraft.
 
https://breakingdefense.com/2026/07/air-force-eyes-next-gen-engine-integration-by-2030/
After years of delays, the Air Force now expects a next-generation engine will be ready to be put on an aircraft by the end of the decade — though a top service official would not commit to which plane the powerplant might fly with.

Over the next few years, and coinciding with a cresting budget for the Next Generation Adaptive Propulsion program, the Air Force expects to build and test dueling prototypes from competitors GE Aerospace and Pratt & Whitney. That work, according to John Sneden, the chief of the Air Force’s propulsion directorate, will culminate in “get[ting] ready for potential integration activities in the 2030 timeframe.”

Speaking with reporters here at the Life Cycle Industry Days conference, Sneden subsequently declined to directly comment on what platform might receive an NGAP engine.
 

USAF Preps Next-Gen Engine Testing Ahead of 2030 Integration onto Aircraft​

https://www.airandspaceforces.com/u...ting-ahead-of-2030-integration-onto-aircraft/
The Air Force is preparing to move toward prototyping and testing a next-generation advanced engine and wants to be ready to integrate it onto an aircraft around 2030.

But while the Next-Generation Adaptive Propulsion engine has been closely associated with the Next-Generation Air Dominance fighter, now called the F-47, service officials have yet to determine which aircraft the NGAP powerplant will first go on.
 
The schedule of NGAP in the FY2021-FY2027 budgets kept changing. Before FY2024, the NGAP program was scheduled to conclude in Q3 of FY2027. The FY2025 budget revised this timeline to Q4 of FY2027, and the FY2026 budget adjusted it once more to Q2 of FY2030. However, the descriptions also changed. Before FY2026, it was referred to as NGAD. Starting in FY2026, it began to talk about future fighters with afterburners and other fighters without afterburners. The FY2027 version further states that future fighters with afterburners and other aircraft without afterburners will provide options for the NGAD family.
 

“We are ordering all the prototype hardware,” says Amy Gowder, GE Aerospace Defense & Systems president and CEO. “Around 20% to 25% of the hardware is on order now, so we have already started working with the supply base. We are using many of the same suppliers from XA101,” she adds, referencing the three-stream adaptive cycle engine developed under the Air Force's Adaptive Engine Transition Program, a forerunner to NGAP.

“Several of those suppliers were disappointed, as we were, that we didn't go into engineering, manufacturing and development, so they were very ready to work with us on XA102,” Gowder says.

The company’s digital design approach to the new engine has also enabled GE to change its approach to working with suppliers on the XA102, she adds.”

I’m going to catch a lot of flak for saying this but reading between the lines seems to add weight to the scenario where initial F-47s will use a more ready to fly, less exquisite engine.

The issue of course may not be the design; it’s flowing through an all digital design spec in a secure fashion to a supplier base that probably uses Windows 95 era tech in critical processes. That’s on top of the heightened material standards and tolerances for parts likely to see some of the highest temperatures ever seen in a fighter jet engine.

A cynic might say the 25% of parts they’ve already ordered might be the low hanging fruit and the balance is going to take a non trivial amount of time longer to order vs the time for the first 20-25% of the parts list.
 
A cynic might say the 25% of parts they’ve already ordered might be the low hanging fruit and the balance is going to take a non trivial amount of time longer to order vs the time for the first 20-25% of the parts list.
I'd assume the opposite. The 20-25% are likely long lead time components.
 