Sometimes I really wonder about conclusions reached in this forum. "Guess work" is an understatement. Just how can it be deduced that USAF now realizes Lockheed is way over their heads. If that is remotely true, the US is in a crap load of trouble! We all better start practicing our Chinese and Russian if that be the case!
Seeing as you couldn't be bothered to quote me, despite clearly responding to my comment, I struggled with whether to respond or not. But, fuck it, I'm bored so let's go.
Since 2006, when the Lighting first entered production, Lockheed has built about 615 total aircraft. Now granted, they had some extremely low production numbers for the first few years as they were still developing the plane and in 2020 they built 120 aircraft. But the US needs, officially, over 2,400 aircraft. Lockheed planned to build 141 planes last year, but well, covid. Now, if every single one of those planes were delivered to the US, it would take almost
fifteen years to deliver enough planes to the US (2,456 total minus the 375 that had already been delivered by June of 2020). Except not all of those planes are going to the US. All of the countries that ordered planes want there's too. So foreign customers need to be accommodated too. At best, it's going to take 20 years from this point for the US to get all the F-35s they want. By that point, the first planes delivered are going to be almost 40 years old themselves and in need of replacement (if not earlier). So I don't think it's much of a stretch to say that Lockheed is in over their heads and will never be able to supply enough fighters to meet the demand.