As noted, this could easily expand if the French Navy buys in and the RAF starts pushing for OTL Tornado numbers.Essentially we have G4 (strike version) and G8 (air defence version) with scaled up RB.199s from some time after 1975. And what effectively amounts to Mirage F1E with FBW and the uprated RB.199 on offer for the deal of the century (with an early Spey version already in production).
Now I'm not certain how well the Germans can be accommodated in this scheme. Supposedly the French and British together were initially talking about a run of 300 aircraft (125 AdA, 175 RAF). I can easily see these numbers expanding to roughly 200-230 for each, after all the French wanted 200 ACF and RAF got about 230 strike Tornadoes. Thing is the Germans at the same time claimed they wanted to build 600 aircraft and after 1972 324. The initial number is twice what France and Britain had initially committed to build combined. Somehow I doubt France and Britain are willing to give over 60% of the work-share to Germany. Would Germany be willing to accept something around 30% of the work and the existing French and British design arrangements? If not I don't see how a deal can be reached.
Does at the same time the call it Mirage F3E win the deal of the century? I could see it gaining the Belgian order, maybe, particularly if the Dutch were still part of MRCA. The whole order I'd guess not. Which then opens the road for "Mirage 2000" to come to being complementing AFVG instead.
Assuming Tornado numbers isn't a bad starting point.
150 to 230 AFVG would be needed by the RAF for GRmk1 (Ground Attack and Reconnaissance).
Another 165 or so for Fmk1 Bomber Destroyer.
Assuming equal numbers for France, we're talking 800 aircraft.
France would require fewer planes - maximally we're looking at 200 interceptors and about 100 multirole naval aircraft, and practically probably somewhat fewer.Assuming Tornado numbers isn't a bad starting point.
150 to 230 AFVG would be needed by the RAF for GRmk1 (Ground Attack and Reconnaissance).
Another 165 or so for Fmk1 Bomber Destroyer.
Assuming equal numbers for France, we're talking 800 aircraft.
The french navy knew that with Clems carriers it was 17 tons MTOW - or bust. Blame the british BS-5 catapults lol. I think that was the reason they went with the two smallish M45 turbofans. They wanted a twin-jet for long range interceptions, but even with VG it was at the limits of the Clems.
The reason OP asks his Q is that he is confused by reported numbers upto 1,000.
There never were any funded, Approved, real numbers.
Archibald elsewhere has well displayed the dazed and confused state of AdlA fighters in this timescale. UK was just as mixed up.
At MoU 17/5/65, intent 50:50, no firm offtake, 200 each reported, MoD Healey told Commons (RN Bucc., RAF Lightning, RAF+RN Phantom): "We are satisfied (AFVG) is likely to be a suitable replacement for some, or possibly all". In the evidently dying days he was reported to have offered a 60:40 cost split (for the Project Definition Phase intended 1 /4/67) linked to offtake of 175/UK, 125/France.
Reported cancellation cost to UK was £2.5Mn, modest, reflecting that UK had only reached airframe mock up, engine component rig work.
I'm not so sure the uk could have seen that german down order coming, the tornado was supposed to replace the f-104 and Germany ordered nearly 1000 of them. So 600 plus 250 f-4s (especially sense the german economy had grown a lot in between those orders) would seem reasonable.Britain seems very naive in this era when entering into these joint development programmes.
60 years down the track we can work out roughly what the French need, by looking at what else they're doing and their requirements. They went 50:50 with France on a vague promise of 200 aircraft, but a firm-ish requirement for maybe 100 carrier aircraft and about 60 bombers, with the F2 and F1 taking care of the rest of France's needs. On top of that Britian sold the BS5s to France, so would have known the AFVG was too heavy for the Navy, so the real requirement was for about 60 aircraft. Britain wanting/needing 150/200 and France needing/wanting ~60 does not warrant a 50:50 work-share although I suspect the British were ken to get the money. The 1967 offer of 60:40 work-share is far more realistic, but 70:30 would be better again.
Britain did virtually the same thing with the Tornado 2 years later. The Germans and British were negotiating where the Tornado HQ and first flight would be, the Germans stated a requirement for some 600 aircraft compared to 385 for the RAF, so got the HQ and first flight. As soon as this was decided the Germans dropped their requirement to about 320. They British should have expected this, the Germans had already ordered 88 RF4Es and with the first F4F flying in 1973 I suspect that the Germans were looking to make a big Phantom buy would have been public knowledge. This alone would reduce the German requirement by 250+, making the competition for the first flight and HQ much closer and worth fighting for.
That would seem to be almost exactly 600 needed based on these calculations (583 specifically).Yes. Germany ordered the F-4F a simplified E plus the RF-4E recon version , 263 in total. As for the F-104G starfighter ( and TF-104G trainer) the actual wing deployment gives a better clue
At their peak in the mid-1970s, Starfighter equipped five nuclear-armed Luftwaffe Fighter-Bomber wings, two Interceptor wings, and two Reconnaissance wings. In addition, two attack wings of the Marineflieger (Federal German Navy) were equipped with Starfighter. The large numbers delivered reflected the high attrition rate also.
So that indicates apart from the 136 TF-104 2 seat trainers , there was also 2 interceptor wings and 2 recon wings which the F-4 was ordered. The remainder were suitable for replacement by Tornado strike aircraft., 7 wings in total. That would be well short of 600.
The AdA paid the price however. Over 1968-73 those 200 Jaguars (while they made themselves useful in Africa from 1977) where pretty expensive. Not exactly a good bargain for a not all-weather attack plane. The AdA could have procured more IIIE (all weather, at least in theory) or Mirage V or F1A - barebones Mirage variants.. They went 50:50 with France on a vague promise of 200 aircraft, but a firm-ish requirement for maybe 100 carrier aircraft and about 60 bombers, with the F2 and F1 taking care of the rest of France's needs
The AdA paid the price however. Over 1968-73 those 200 Jaguars (while they made themselves useful in Africa from 1977) where pretty expensive. Not exactly a good bargain for a not all-weather attack plane. The AdA could have procured more IIIE (all weather, at least in theory) or Mirage V or F1A - barebones Mirage variants.
I'm still at lost why French Jaguars never got Mk.104 Adours. I should ask that at Airfense.net .
For me, AVFG was too soon to meet any real need from either nation.
Jaguar was designed to be both from the outset, the ECAT specs made that clear. While the RAF were keener on the trainer version, it was always meant to be a short-field relatively simple ground attack aircraft.They went about getting an Attack aircraft in a roundabout way, by growing it from an advanced trainer. My guess is if they started in 1965 with the 1969 spec it might have been a bit cheaper.
Spot on. Fact is that the original F1C, IOC spring 1973 like the Jaguar (you can see why the AdA combat budget was stretched thin) got three variants / upgrade : the F1C-200 with Super 530F (late 1970's); the -CR for reconnaissance (early 1980's); and finally, in the early 1990's: the 55 * airframe -CT conversions to a fighter-bomber role (1992).The French seemed to have penny-pinched on Jaguar from the start -- simply a reflection of how limited the AdA's funds were given the other programmes and acquisitions at the time. Later on I guess the Mirage F1 was seen as the better bet.
Jaguar was designed to be both from the outset, the ECAT specs made that clear. While the RAF were keener on the trainer version, it was always meant to be a short-field relatively simple ground attack aircraft.
UK had only reached airframe mock up, engine component rig work.
Agreed. Remember, in the 1950s and early 1960s, planes might last 5 years in frontline service before being obsolete!I think they were still operating under the assumption that the first generation Mirages would only last for about 10 years, so the IVAs would need to be replaced in the 70s.
IIRC the RAAF Mirages that were delivered in the mid 60s were to have a life of 1500 flights hours, but most did well over 3000 hours and some did over 4000 hours. My guess is that the users didn't know these aircraft could be viable for 20 years until they got to 10 years and realised that these aircraft weren't obsolete.
Agreed. Remember, in the 1950s and early 1960s, planes might last 5 years in frontline service before being obsolete!
IIRC the UK paid 47.6% of the R&D cost of Tornado IDS and (obviously) 100% of the R&D cost of Tornado ADV. So finding the money for another 3.4% of the R&D cost of Tornado IDS aught to be possible.800 AFVGs, or the 990 Tornados built make these aircraft highly successful. That's much better than the 726 Mirage F1s, 573 Jaguar or 601 Mirage 2000s built.
Personally, I think that with a 385 Tornado requirement Britain should have just gone ahead with the UKVG, or at the very least retained at least 51% (or controlling) share of the project. I think 300+ aircraft of this complexity is enough momentum to make a project worthwhile.
IIRC the UK paid 47.6% of the R&D cost of Tornado IDS and (obviously) 100% of the R&D cost of Tornado ADV. So finding the money for another 3.4% of the R&D cost of Tornado IDS aught to be possible.
I'm left wondering whether the AdA ever had any OR and money for AFVG in the first place... 1965.
Quote from Page 219 of Charles Gardner's history of BAC.I thought the work-share was 42.5% UK, 42.5% West Germany and 15% Italy, but the point stands. After all if the UK can offer France 60:40 for the AFVG in 1967 they can offer WG and Italy 49% in 1969.
We're in violent agreement, because I wrote Message 33 in support of what you wrote in Message 7.The shareholding in Panavia remained at nationalisation, at least officially, at 42.5 - 42.5 - 15, but in May 1976 Mr William Rodgers of the Ministry of Defence said in Parliament that the UK's share of the total programme was really 47.6 per cent.
809 aircraft including 4 pre-production aircraft rebuilt to production standard: 385 (47.5%) UK; 324 (40.0%) BRD; and 100 (12.5%) Italy. (Percentages rounded to the nearest half a percent.) So 2.5% from West Germany and 2.5% from Italy.I'm getting it now. From who's share did Britain pick up those extra few percent?
According this german Phantom siteOf the 9 F104 LW (+2 for the MF) wings some 5 (and 1 G91) wings were replaced by RF4E and F4F by the mid 70s; both fighter, both recce and one of 5 fighter-bomber wings. In addition while the West Germans and built bought 900+ F104G, they crashed 115 before 1970, so the LW strength likely peaked at ~600 aircraft and the MF another ~100.
The 88 RF4Es were ordered in 1968, so that removes 2 F104 wings of about 100 aircraft that don't need to be replaced. I don't know when the F4F was ordered, but I'm confident that the development was public enough knowledge in defence circles that the British should have known about it. The exact numbers would likely have been unknown, but the British should have had a rough idea of if it was going to be ~150 close to ~250.
The Tornado replaced 4 LW fighter-bomber wings, in 1969 the British should have known that the LW only was in the market for 5 or so wings of aircraft and the MF another 2.