- Joined
- 15 July 2007
- Messages
- 5,739
- Reaction score
- 6,322
Gratuitous quote to start.
But it's arguable that a national programme could proceed.
This would either leave just the FAA pursuing what became F-35B.
Or that the carriers would be ditched as the price for a national Lo Interdictor.
However a wildcard option is doing a Rafale and trying to lure the USN post A12 and NATF cancellation onboard.
Assuming for the purposes of an AH Scenario(s), that MoD and Treasury agree to a national programme at least to start the ball rolling on a collaborative effort.While most of the FOAS files at Kew remain under the 30 year rule, one file I recently looked at on FCBA identified two (presumably Warton) FOAS design studies that featured in Joint Force 2000 planning around the time of the 1998 SDR and the ongoing discussions about the size and shape of the CVF and FCBA force.
P.149-25: a new design multi-role stealth interdictor
P.151-02: a non-stealth Eurofighter derivative
It was assumed either would be a post-Eurofighter collaborative venture, costing around £2 billion.
The assumed 1998 plan was 220 P.151-02 alongside 3 smaller CVF, 60 JSF for the RN and 65 Eurofighters replacing the Harrier GR.7 fleet, costing £20.1 billion.
Buying 329 P.151-02 (with no CVF programme) was estimated to cost £16.4 billion.
Or vice-versa, 3 CVF and 260 JSF with no FOAS would cost £15.7 billion.
The high number of the P.149 sub-variant indicates that a fair amount of work must have been done on stealthy designs.
Just for context, Warton's FBCA studies of circa 1994 was the P.145, with the P.145-17 being the version taken forward for comparison studies with the SSF and Eurofighter.
But it's arguable that a national programme could proceed.
This would either leave just the FAA pursuing what became F-35B.
Or that the carriers would be ditched as the price for a national Lo Interdictor.
However a wildcard option is doing a Rafale and trying to lure the USN post A12 and NATF cancellation onboard.