One squadron of jet fighters based on the Falkland airfield would have also posed massive problems to the landings and the subsequent logistic support required.
 
The Gnat has little range no ? Could never fly from Argentina to Falklands and back. Not sure it could fly out of Port Stanley runway.

When tested by the RAF against the Hunter in the 1958 VRET it had a combat radius of 188nm against the required 240nm. Dunno about using Port Stanley runway, the VRET was done in the Middle East on at least 1 compacted sand runway, so the runway requirements were pretty tough.
 
And the following [Gnat F.1] performance numbers:
  • 0.64 thrust/weight at take-off (clean). Similar to an F-8E Crusader and better than all A-4 Skyhawks except for the souped-up A-4M
  • ~0.283 fuel fraction at take-off (clean). Similar to a clean Etendard IV with full fuel, or an F-8E Crusader or A-4 Skyhawk with 85% fuel
  • ~700m take-off run lightly loaded with 2x AIM-9s (3,550kg), ~900m at 4,100kg max take-off weight
  • ~650m landing run at 2,800kg landing weight (200kg fuel + 2x AIM-9s)
  • ~200nm max range at sea level with allowances for take-off, landing and 2.5 minutes combat (this aligns with the Ajeet's combat radius of ~93nm with 2x 500lb bombs)
All in all the the runway take-off and landing performance is definitely compatible with Port Stanley's 1,200m runway. Thrust/weight is on par with high-performance aircraft like the F-8 and A-4M. Fuel fraction with the wet wing is decent but the max combat radius is limited unless you add external fuel tanks.
That's marginal for a rejected takeoff. Add takeoff and landing lengths together and compare to runway length. 1350+m versus 1200m runway.

Your V1 decision point is going to be many seconds before your rotate speed.
 
That's marginal for a rejected takeoff. Add takeoff and landing lengths together and compare to runway length. 1350+m versus 1200m runway.

Your V1 decision point is going to be many seconds before your rotate speed.
Perfectly normal to have a gap between V1 and Vr during which you're putting your trust in your zero zero ejection seat. Especially in wartime.
 
Perfectly normal to have a gap between V1 and Vr during which you're putting your trust in your zero zero ejection seat. Especially in wartime.
Not wrong, but it does mean that pretty much any rejected takeoff is writing off the plane in this stiuation. Not ideal. We're honestly back to sending the engineers in Wave 2, to add turning loops on both ends of the runway plus maybe 50m of marston matting each side end.
 
Last edited:
This thread time and time again has come back to those ribbons of tarmac being a key driver of air power.
Having done a little digging, the 1976 Shackleton Report found that the full economic potential of the islands couldn't be realised with the 1,250-metre runway then under construction. The recommendation to do so was the only thing underlined in the entire report.

An extension to 2,200 metres and strengthening to an LCN of between 65 and 70 would allow operation of 737, as well as 707s at light weights. Doing so at that time would have been relatively cheap as the plant and workforce were already on site for the work.

It goes without saying that such a runway would have been very useful for military purposes to whomever occupied the island. It didn't make it into the report - which had as an unofficial goal a raprochemment between the Falklands and Argentina - but Lord Shackleton made much the same point privately.
 
Having done a little digging, the 1976 Shackleton Report found that the full economic potential of the islands couldn't be realised with the 1,250-metre runway then under construction. The recommendation to do so was the only thing underlined in the entire report.

An extension to 2,200 metres and strengthening to an LCN of between 65 and 70 would allow operation of 737, as well as 707s at light weights. Doing so at that time would have been relatively cheap as the plant and workforce were already on site for the work.

It goes without saying that such a runway would have been very useful for military purposes to whomever occupied the island. It didn't make it into the report - which had as an unofficial goal a raprochemment between the Falklands and Argentina - but Lord Shackleton made much the same point privately.

Funnily enough Argentina flew 737s (and BAC111s) into Port Stanley during their impressive airlift during the war.
 
Funnily enough Argentina flew 737s (and BAC111s) into Port Stanley during their impressive airlift during the war.
There is also an unpaved section, despite the runway being only 1,250 meters long. Barring fog and rain, weather conditions are excellent for takeoffs: low temperatures, sea-level elevation, and relative winds of up to 30 knots, with an overall average of 16 knots. This remains fairly constant regardless of the month.
 
There is also an unpaved section, despite the runway being only 1,250 meters long. Barring fog and rain, weather conditions are excellent for takeoffs: low temperatures, sea-level elevation, and relative winds of up to 30 knots, with an overall average of 16 knots. This remains fairly constant regardless of the month.
The issue with Port Stanley was always more landing: wet runway which increased landing distances and the risk of squalls reducing visibility below minimums with no suitable divert field available.

So losing fighters due to fuel starvation or runway excursions was a risk that had to be factored in.
 
There is also an unpaved section, despite the runway being only 1,250 meters long. Barring fog and rain, weather conditions are excellent for takeoffs: low temperatures, sea-level elevation, and relative winds of up to 30 knots, with an overall average of 16 knots. This remains fairly constant regardless of the month.

Where was the unpaved section? IIRC only 1 end was suitable for extension as the ground at the other was too soft and boggy.
 
Where was the unpaved section? IIRC only 1 end was suitable for extension as the ground at the other was too soft and boggy.
The whole area around the runway was soft & boggy. When it was extended after the War several thousand tons (IIRC) of stone had to be quarried, using machinery brought in from the UK, to stabilise the ground before the PSP surface could be laid.
 
The whole area around the runway was soft & boggy. When it was extended after the War several thousand tons (IIRC) of stone had to be quarried, using machinery brought in from the UK, to stabilise the ground before the PSP surface could be laid.

Yes, it was such a massive job that I think there are strict limits to what a well planned an executed Argentine extension operation could achieve in a few weeks between the invasion and the response. Probably not much more than the rumoured 500m, an arrestor wire and maybe some PSP handstand and gravel access tracks.
 
I haven't read through the entire thread, but why not the F-5C? They were being heavily marketed around the time that the 1970 mirage purchases and at the time they could have purchased 2x as many fighters, and still had money left over for an expansion of their A4 fleet. Sure in 1978 they wouldn't have been able to purchase new F-5s from the US, but at that point they could have increased their Super Etendard purchase instead of getting IAI Neshers, and a larger order may have resulted in having more planes and missiles on hand for Exocet strikes.

The F-5C's were apparently pretty easy to modify for probe and drogue refueling, and shouldn't have an issue tanking from a C130, and with full drop tanks wouldn't even need to tank for combat air patrols over the Falklands.
 
I haven't read through the entire thread, but why not the F-5C? They were being heavily marketed around the time that the 1970 mirage purchases and at the time they could have purchased 2x as many fighters, and still had money left over for an expansion of their A4 fleet. Sure in 1978 they wouldn't have been able to purchase new F-5s from the US, but at that point they could have increased their Super Etendard purchase instead of getting IAI Neshers, and a larger order may have resulted in having more planes and missiles on hand for Exocet strikes.

The F-5C's were apparently pretty easy to modify for probe and drogue refueling, and shouldn't have an issue tanking from a C130, and with full drop tanks wouldn't even need to tank for combat air patrols over the Falklands.

Argentina was under a US Arms embargo from 1977 but received 50 of 75 A4s (1st batch of 25 in 1966), 10 of 17 Mirage IIIs and 12 Canberra's in the 70s prior to the embargo and 7 Mirage IIIs, 39 Daggers and 5 Super Etendards after the 1977 embargo but before the 1982 war.

I'd say the Mirage III is a better fighter than the F5 and the A4 is a better attack aircraft, so choosing the F5 instead of those types is a retrograde step and would be a limiting factor once the embargo kicks in. In any case bringing about 100 jets into service in the decade before the war is a pretty good effort from a small-medium power.
 