Cool! I was not previously aware that Madrid was interested in the P.24 as an alternative.
My guess is that the Skoda-built Jupiter engines for P.7a fighters would face the same export restrictions from Bristol. But the P.7s could be re-engined with Gnome-Rhône Jupiters to get around that restriction.
FWIW, I'm working on profiles of Republican PZLs. Unfortunately, such what-ifs cannot be posted on SPF. But, once complete, I'll post a link here for Beyond the Sprues members.
I am not sure if such an operation would be physically viable and whether it wouldn't incur exorbitant costs. Keep in mind that aircraft from that era had a relatively short lifespan and were treated almost as disposable assets.
Here is my proposed timeline for this scenario:
Autumn 1935: The Spanish and Polish sides sign a contract for the delivery of 36 PZL P.11f fighters.
Spring 1936: The Polish side begins deliveries of older PZL P.7a fighters equipped with Jupiter engines. A subsequent agreement is signed for an additional 72 newer PZL P.24 fighters, along with a production license. To backfill its own fleet depleted by these exports, the Polish side greenlights the production of the PZL P.11g "Kobuz."
Summer 1936: Following the outbreak of the Spanish Civil War, and fearing the diplomatic backlash from France and Great Britain, Poland is forced to covertly manage parts of the operation. The licensing agreement is amended into a contract for additional direct aircraft deliveries.
1937: Deliveries of older PZL P.11s to Spain are underway; alongside them, a dozen or so PZL.23 Karaś light bombers are dispatched, though they yield mediocre results in combat. Financing their purchases with gold reserves, the Spanish side continues to buy additional PZL P.24s and PZL.37 Łoś bombers, while also expressing interest in the upcoming PZL.50 Jastrząb. This influx of capital allows for an ambitious expansion of Polish manufacturing plants, significantly boosting production capacity.
1938: First deliveries of the PZL P.24 and PZL P.11g reach Spanish units. However, due to the increasingly tense geopolitical situation in Central Europe, Warsaw artificially delays shipments, ultimately suspending the deliveries in the spring of 1938, excluding older airframes and spares.
1939: Thanks to the financial gains from the Spanish contract and the redirection of suspended deliveries originally meant for Madrid, the Polish side boasts a remarkably formidable fighter force by September 1939. Nearly half of the 240 available fighters consist of the newer PZL P.11g variant. Furthermore, over 80 PZL P.24j fighters are rapidly assembled from the remaining undelivered P.24 components and spare parts. The final two squadrons, stationed near Warsaw under the Commander-in-Chief’s Operational Reserve (OND), are equipped with the cutting-edge PZL.50 Jastrząb.