Kat Tsun
eeeeeeeeeeeeeee
- Joined
- 16 June 2013
- Messages
- 1,887
- Reaction score
- 2,669
5 years. And a total retooling of the shipyard for Zumwalts, then rebuilding the tooling for Flight 2A Restarts.
Yeah that's not too bad.
5 years. And a total retooling of the shipyard for Zumwalts, then rebuilding the tooling for Flight 2A Restarts.
Well, the storm I'm aware of was Hurricane Sandy in November 2012.Wasn't part of retooling was due to natural disasters?
By the numbers they do. There have been more successful US programs than unsuccessful US programs.They don't.
Good thing there is a battle force then, it's not like the US surface fleet is utterly useless.These are useless without a Battle Force for them to support.
I never said Flt III had finished. Also the IIA restart had to overcome a ton of hurdles, it wasn't at all a smooth process.Flight III hasn't finished. It's one ship. IIA did okay because it didn't really stop.
I didn't say it wasn't, that isn't Navy's faultBecause of GWOT funding.x2
Flt III wasn't an emergency program. It was designed as an alternative to CG(X) which itself was a wide exploration of concepts. To call it an emergency program is very much a falsehood.No, it was an emergency program. It's a cheap way to get AMDR at sea while waiting for...whatever will actually carry AMDR.
Big chunk of text that didn't address the point. It's not like I disagree with a lot of this, I don't at all think NAVSEA is blameless. It's just that so much hate is directed at nonissues that I don't even get to the point of bringing up actual issues. Also LX(R) is just San Antonio Flt II, I'm not sure what you're referring to exactly there.NAVSEA had far more misses than hits since 1995 for the Battle Force. The reasons are not important because the reasons are symptoms of the cause of failure, which is that NAVSEA and the United States economy in general, have lost the ability to produce ships efficiently and on time since at least 2020. Maybe earlier.
Flight IIA succeeded but then how could it fail? It was 1995. IIA restart didn't really stop either (the delay was like...a year or three?) so that was relatively easy. Flight III seems to be okay but this could change on a whim next week or next month or six or ten or eighteen or whatever.
Zumwalt failed due to GWOT sucking the funding out. LCS-1 and LCS-2 both failed due to lack of support for mission modules because their costs inflated to the point where procurement ate the development budget. No more modules! Oops! FFG(X) failed because it wasn't engineered properly and it had uncontrollable growth increases, and that will continue to grow as the two ordered Connies get built. FF(X) might succeed, but it might also stop at one or two or three hulls, who knows! It's possible HII will get budget to produce a large number of 4923s, nobody really knows yet, but I suspect they won't. Where's the money gonna come from?
The 774s were smoothly designed but their production is bad. The 774s are supposed to be 2.0 hulls per year but they're 1.1 per year, down from 1.4 I believe, since 2022. They might put 7-8 in the water before the war kicks off. They've got orders for about 20 I think. Same with the Columbias. Columbia has slipped by a year. The follow on ships haven't slipped, yet. Same with the Fords. CVN-80 slipped from 2025 to now 2030. It's probably going to miss the party!
This all counts as failure. NAVSEA should be capable of reorganizing the production yards and supply chains promptly when necessary. They're just kind of not. So everything is a year or five behind here and getting worse.
DDG(X) failed. It never even bent metal. Unfortunate. BBG will perhaps fail, it's the safe bet, after all. Extraordinary ships require extraordinary evidence. SSN(X) might also fail, judging by how the surface fleet has gone, but hopefully the Navy isn't going for the option for 30+ SSN(X) and buys 30+ 774s instead out to 2054. They know how to make those.
LX(R) is currently in a state of limbo. It might be functionally canceled, even though it really can't be, because it's not really done anything for several years now. LHA Fallujah has slipped by a year, commensurate with the Columbias, so that's approaching a major failure. They've stopped buying LPD-17s to try to shift most the gator navy money to surface ships and submarines, I think, because there's just tons of backlogs.
It's a rough time for everyone, except one. The only program that seems to be on track is the Flight III production! Maybe?! Who knows! Nobody cares about the oilers or whatever, because they're not going to have much of a surface fleet to back up, but I assume they're on track. NASSCO can't be that bad because, much like the Burke printer, they're constantly working due to being flush with cash.
Also we need a new plane, a new nuclear warhead, and eventually a new SLBM. And Standards. And Tomahawks.
But other than all that, yeah, DON has done a good job.
Retooling takes place every time a production line wraps up. Burke production had wrapped up and hence they retooled for the next production series. The same thing has happened with FF(X), the NSC production line has been entirely retooled and you've gotta start from nothing and work back up to being able to produce hulls. The IIA restart had difficulty doing this and I highly suspect FF(X) will tooWasn't part of retooling was due to natural disasters?
Depends on whether someone drags NAVSEA into a come-to-Jesus meeting about THERE SHALT BE NO CHANGES or not.My prediction will be that the USN's required changes will drive up the cost and time to deliver the first unit that we'll go through this exercise again.
Drags NAVSEA to completely change their planned fleet architecture and factor in a warship which the Navy had not identified a serious gap for at the moment..? I don't think it's a NAVSEA problemDepends on whether someone drags NAVSEA into a come-to-Jesus meeting about THERE SHALT BE NO CHANGES or not.
NAVSEA's changes added over 1000 tons to the Constellation class.Drags NAVSEA to completely change their planned fleet architecture and factor in a warship which the Navy had not identified a serious gap for at the moment..? I don't think it's a NAVSEA problem
Oh god here we go again. Can you not strawman every single thing??? Constellation had a set place in the fleet architecture at least. This does not. Displacement doesn’t change that. Argue the point, stop creating “NAVSEA bad” strawmans when they don’t make sense. Jesus Christ. Also, they’re totally different directorates? Do you even understand what NAVSEA does???NAVSEA's changes added over 1000 tons to the Constellation class.
Also that_person wrote a treatise on how this happened and it’s entirely inaccurate to suggest it was simply “NAVSEA’s changes” that caused the Constellation blowout. To argue as such completely ignores the process through which the contract was awarded and the agreement which FMM agreed to. They saw the requirements and bid on the basis that they could deliver, as did a number of other companies. NAVSEA looked through the designs and saw that FMM’s offer had the most promise. NAVSEA can quite obviously be faulted for either lacking the talent to assess the feasibility of the entry or viewing the promised capabilities as more important than the practical aspects of achieving that capability. NAVSEA cannot be faulted because FMM cannot meet the criteria they were instructed to meet. If you can think critically you can adequately apportion blame and identify weaknesses in procurement, not just create strawmen.NAVSEA's changes added over 1000 tons to the Constellation class.
NAVSEA cannot be faulted because FMM cannot meet the criteria they were instructed to meet.
Of the two Constellation class ships the Navy apparently plans to take delivery of, what happens if the Navy likes what they have to offer?
But it would be different from the rest of the Frigates the Navy is planning or expected to buy. So a two ship class. So now you'll need to train and man for just two frigates that are different from every other ship in the Navy.Are the ships to have a unique manning arrangement?
But it would be different from the rest of the Frigates the Navy is planning or expected to buy. So a two ship class. So now you'll need to train and man for just two frigates that are different from every other ship in the Navy.
It is unlikely they will be in a position to restart the program without facing significant delays and duplicative costs, provided the SecNav has not already prohibited the Navy from pursuing those two ships in the future even if they are well received. It would have almost been better to pay the yard off and not build the two ships then to get them on the Navy books and continue to incur O&S costs for vessels the Navy would not be allowed to buy more of. Not to mention how they envision manning these leave aside actually operating them..
Then why are they building them and planning on taking delivery and keeping them around? I understand that they have contractual obligations but if the ships are worthless they should just scrap them altogether. They certainly have the political cover to do so if things are really this bad with the program.When I read Admiral Goddard's comments though, it sounds like even he doesn't believe the ship is currently viable.
Maybe they provide enough capability in the near term, but in the long term it becomes unsustainable either cost wise or engineering wise?Then why are they building them and planning on taking delivery and keeping them around? I understand that they have contractual obligations but if the ships are worthless they should just scrap them altogether
One cannot really have it both ways. If these platforms are out-and-out disasters..so beyond salvaging that the Navy is instead pursuing alternatives that lack even SPY-6 and VLS, then what utility can be expected from the first two hulls? One would assume they have to spend years in testing before they can actually go out on an operational cruise. How many months/years has the lead Burke Flight III spend in testing? Zumwalt?Maybe they provide enough capability in the near term, but in the long term it becomes unsustainable either cost wise or engineering wise?
You know, maybe the USN should learn to work with what it could get, instead of demanding what it wants? Most navies in the world operate under the premise of "working with whatever hardware we could obtain, even if its suboptimal".Drags NAVSEA to completely change their planned fleet architecture and factor in a warship which the Navy had not identified a serious gap for at the moment..? I don't think it's a NAVSEA problem
And what proof does he have to back that up? that_person’s source was literally a guy who bid on the program and it seems Goddard is a retired RAN rear admiral? What connection does Goddard have to the FFG(X) program?Rear Admiral Goddard strongly disagrees.
He asserts the ship met the "big R" requirements early on but was sunk by the many and continuing "small r" requirements.
He also asserts nobody owned the design. Nobody was accountable.
There are always judgement calls to make when making changes. Cost benefit analysis.
Doesn't not seem that was being done.
that’s why every navy on earth can deploy and sustain 11 CVNs? I’m sure China is just “working with whatever hardware they can obtain”.You know, maybe the USN should learn to work with what it could get, instead of demanding what it wants? Most navies in the world operate under the premise of "working with whatever hardware we could obtain, even if it’s suboptimal".
Chuck GoddardAnd what proof does he have to back that up? that_person’s source was literally a guy who bid on the program and it seems Goddard is a retired RAN rear admiral? What connection does Goddard have to the FFG(X) program?
that’s why every navy on earth can deploy and sustain 11 CVNs? I’m sure China is just “working with whatever hardware they can obtain”.
Once again, NAVSEA isn’t even blameless as I pointed out. It’s just not all NAVSEA’s doing and the evidence supports this.
It’s hard to see many buyers for $1B+ U.S. Navy frigates, particularly when they are lead ships of a class without a future. Not to mention the lack of detailed industry support and sustainment sharing between classes. I suppose someone will take them if we are throwing them away.The ships are basically job programs now. I bet they get sold off as soon as finished. Mexico could use them for example.
I'm Australian so when I search up the same thing I get Australian hits first, my mistake. Chuck Goddard has an interesting resume though, leaving the Navy under less than glowing circumstances.Chuck Goddard
Now some of his words might be sour grapes, but I'm absolutely willing to bet that the man knows a LOT more about the whole FFG program than you.
Considering he was senior vice president of Fincantieri Marine Group when they bid on and got the tender. Oh, and he was a USN Rear Admiral.
For someone who speaks like he knows a lot you are sorely lacking in your google-fu. Especially since it's the first hit showing up when you google "Chuck Goddard Admiral".
Combined response:Of the two Constellation class ships the Navy apparently plans to take delivery of, what happens if the Navy likes what they have to offer?
Well, considering that at the earliest possible the ships won't be delivered and operating until late in the administration AFTER this one, the political decision-makers will be different.The decision appears to have been made at the political level and likely will be unmoved without people leaving their positions or perhaps congressional action. I doubt anything changes during this administration personally, though perhaps 2027 brings a big shift. In any case, I would think two ships potentially enough to keep the yard busy to 2029. The big loss will be long lead subcontractor items should anyone want to revive the program. I have no idea how salvageable that situation may be.
To make a shipyard capable of building a warship on the Great Lakes. That's what the continuing program is for.Then why are they building them and planning on taking delivery and keeping [the Constellations] around? I understand that they have contractual obligations but if the ships are worthless they should just scrap them altogether. They certainly have the political cover to do so if things are really this bad with the program.
I still don't understand why they would continue Constellation over assigning other programs to the yard then, it's a hell of a lot of money for a dead end program, especially for a government that claims to want to combat wasteTo make a shipyard capable of building a warship on the Great Lakes. That's what the continuing program is for.
Combined response:
Well, considering that at the earliest possible the ships won't be delivered and operating until late in the administration AFTER this one, the political decision-makers will be different.
And IF that set of decision-makers were to decide that the Constellations were good enough to be built en mass, it'd be possible.
To make a shipyard capable of building a warship on the Great Lakes. That's what the continuing program is for.
For FF(X)? That's an extremely pessimistic timeframe, why do you think that?If the ships are delivered by 2027, I will eat my hat. My prediction is sometime in the early 2030s and probably a few years after that before they do their first deployment.
For FF(X)? That's an extremely pessimistic timeframe, why do you think that?
Ah, that makes more senseI meant for the Connies.
And what proof does he have to back that up? that_person’s source was literally a guy who bid on the program and it seems Goddard is a retired RAN rear admiral? What connection does Goddard have to the FFG(X) program?
that’s why every navy on earth can deploy and sustain 11 CVNs? I’m sure China is just “working with whatever hardware they can obtain”.
Once again, NAVSEA isn’t even blameless as I pointed out. It’s just not all NAVSEA’s doing and the evidence supports this.
Do you mind shooting me a link? I've read/watched a couple things but I'd like to see the one to which you referDid you read his statements on the project? It's worth a read.
What other programs are there, though?I still don't understand why they would continue Constellation over assigning other programs to the yard then, it's a hell of a lot of money for a dead end program, especially for a government that claims to want to combat waste
If Constellation is as wholly crippled as is claimed, LCS is a better choice seeing as the issues are broadly resolved. Soon to be in demand: LSM and potentially T-AOL (that program is a black hole of it's own though so I won't say that with any sort of certainty). They could also start building first gen USVs, we know that's what Navy wants to increase magazine depth and disperse lethality.What other programs are there, though?
CorrectBurke 3s? I don't think those can be launched from that yard, not enough water depth.
A bow sonar isn't really needed anymore anyway, they're a nice to have but a TA and VDS are more than enough. Hence a bow sonar was never really an operation requirement, even if FMM couldn't build ships with them anyway.Same reason the Connies don't have a hull sonar.
Maybe Heritage class? I haven't followed it too closely but I know Eastern Shipbuilding has had two hulls cancelled.What could the Coast Guard provide?
And what proof does he have to back that up? that_person’s source was literally a guy who bid on the program and it seems Goddard is a retired RAN rear admiral? What connection does Goddard have to the FFG(X) program?
that’s why every navy on earth can deploy and sustain 11 CVNs?
I’m sure China is just “working with whatever hardware they can obtain”.
Once again, NAVSEA isn’t even blameless as I pointed out. It’s just not all NAVSEA’s doing and the evidence supports this.