Register here

Author Topic: McDonnell Model 78 assault transport helicopter project (U.S. Marines XHRH-1)  (Read 3380 times)

Offline Mark Nankivil

  • Archive Raider
  • Top Contributor
  • CLEARANCE: Top Secret
  • ***
  • Posts: 1268
Next up is the McDonnell XHRH-1,  These are so-so copies but I should be able to track down a better copy to scan when I interview a retired McAir test pilot soon.

Hesham posted some artwork of the design in this thread:

http://www.secretprojects.co.uk/forum/index.php/topic,4605.msg36414.html#msg36414

Enjoy the Day! Mark
« Last Edit: August 17, 2012, 02:35:20 pm by Stargazer2006 »

Offline Ardavan.K

  • CLEARANCE: Confidential
  • *
  • Posts: 148
Design of the Model 78 was started in 1950 in answer to a request for proposals for an assault transport helicopter which had been issued by the Navy Department on behalf of the US Marine Corps. Intended to operate from CVE-105 class (USS Commencement Bay) carriers, the new helicopter was to fit on 13.41m by 12.80m deck elevators. Its primary mission was to carry 30 troops to objectives up to 100 naut miles away and return to the carrier without the need to refuel ashore.

To fulfill what were then most demanding requirements, McDonnell designed a compound helicopter with a three-bladed rotor and short wings on which were mounted two 3507shp Allison XT56-A-4 turbines. For vertical flight, air from engine-driven auxiliary compressors was to be ducted to 726kg thrust McDonnell 12JP20 pressure jets, one at the extremity of each rotor. For forward flight, each engine was to drive a three-bladed propeller, with transition from helicopter flight mode to conventional flight being made by transferring power from the auxiliary compressors to the propellers as soon as the forward speed exceeded the stalled speed of the wing. Normal accommodation was to have been provided for a crew of two and 30 fully-equipped troops. Alternatively, accommodation could have been provided for 36 troops or 24 litter patients, or two Jeep-sized vehicles could have been carried internally. Larger loads (up to a maximum weight of 5224kg) could be carried externally. Another noteworthy design feature was the inclusion of a hydraulically-operated loading ramp in the forward fuselage, beneath the cockpit. Folding wings, rotor blades, and tail unit were to have enabled the Model 78 to fit on the deck elevators of CVE-105 carriers.

The Navy selected the McDonnell design on 15 March, 1951, and two and a half months later issued a Letter of Intent for three XHRH-1 prototypes (Bu Nos 133736/133738) to be built under Contract N0a(s)-51-1201. A full-scale mock-up of the XHRH-1 was inspected on 22 and 23 October, 1952, and construction of the prototypes was begun. However, after the Korean War had ended, budget cuts and concern over anticipated developmental problems led to the cancellation of the contract before completion of a single XHRH-1. All work on the project ended in April 1954.

Technical data for XHRH-1

Rotor diameter: 19.81m,
wingspan: 13.72m,
length with rotor blades and tail folded: 16.33m,
 height: 5.09m,
wing area: 30.84m2,
empty weight: 8695kg,
loaded weight: 13795kg,
 maximum weight: 16329kg,
 maximum speed at sea level: 444km/h,
 climb rate: 12m/s,
hover ceiling out of ground effect: 3050m,
combat radius: 185km
Aeronautics was neither an industry nor a science.
It was a miracle.

Offline Skyblazer

  • Global Moderator
  • CLEARANCE: Top Secret
  • ****
  • Posts: 12939
Topic merged with earlier contribution on the subject by Mark Nankivil. Here are slightly better resolution versions of the pics you provided (from this old topic), as well a two photos of a desktop model of that era (from this other topic - apparently still offered on eBay).
« Last Edit: August 17, 2012, 02:23:19 pm by Stargazer2006 »

Offline fightingirish

  • Senior Member
  • CLEARANCE: Top Secret
  • **
  • Posts: 1921
Quote
McDonnell XHRH-1 (Model 78)
McDonnell Model 78 Marine Assault Transport - Twin Engine Jet-Rotor helicopter, designated XHRH-1. Report No. 2738, dated 1 October 1952. Credit:Greater St. Louis Air and Space Museum.
Click here to download report (16 Megs)
Click here to download Mock Up photos in one Zip file (3.3 Megs)

Source: http://aviationarchives.blogspot.com/2017/08/mcdonnell-xhrh-1-model-78.html

Edit 2017-08-14:
Quote
McDonnell XHRH-1 (Model 78) Mock Up Photos
More mock up photos of the McDonnell XHRH-1 Marine Assault Transport - Twin Engine Jet-Rotor helicopter. Part of report No. 2775, dated 20 October 1952. Credit: National Archives via Bill (Phantomologist) Many thanks, Bill!
Click here to download photos in one Zip file (55.3 Megs)

Source: http://aviationarchives.blogspot.com/2017/08/mcdonnell-xhrh-1-model-78-mock-up-photos.html

See also the picture attachments in the following posts.  :)
« Last Edit: August 14, 2017, 01:46:41 pm by fightingirish »
Slán,
fightingirish

Slán ist an Irish Gaelic word for Goodbye.  :)

Offline Bill S

  • Top Contributor
  • CLEARANCE: Secret
  • ***
  • Posts: 460
Here are some photos from NARA II of the XHRH-1 Mock Up.
My scans are the source.

Offline Bill S

  • Top Contributor
  • CLEARANCE: Secret
  • ***
  • Posts: 460
Next set of XHRH-1 images.

Offline Bill S

  • Top Contributor
  • CLEARANCE: Secret
  • ***
  • Posts: 460
Final four images that I have of the XHRH-1 Mock Up.

Offline AeroFranz

  • Aerospace Engineer
  • Top Contributor
  • CLEARANCE: Top Secret
  • ***
  • Posts: 1971
OUTSTANDING.
All modern aircraft have four dimensions: span, length, height and politics.   TSR.2 got the first three right - Sir Sydney Camm

Offline yasotay

  • Senior Member
  • CLEARANCE: Top Secret
  • **
  • Posts: 1720
Having the ramp in front might have been a smart idea.  Pilots would have been more circumspect where they dropped the "crunchies" (aviator term there). 

Brilliant set of pictures!  Thank you Sir.

Offline Johnbr

  • CLEARANCE: Top Secret
  • ***
  • Posts: 644
 :) Great find on the photos.

Offline Pioneer

  • Senior Member
  • CLEARANCE: Top Secret
  • **
  • Posts: 1418
  • Seek out and close with the enemy
Thanks Bill S, those picture give me a great appreciation of a design which was miles ahead of its time.

Regards
Pioneer
And remember…remember the glory is not the exhortation of war, but the exhortation of man.
Mans nobility, made transcendent in the fiery crucible of war.
Faithfulness and fortitude.
Gentleness and compassion.
I am honored to be your brother.”

— Lt Col Ralph Honner DSO M

Offline FighterJock

  • CLEARANCE: Top Secret
  • ***
  • Posts: 690
Was the Model 78 ever designed to be a competitor to the Chinook?  Pity it was never built.

Offline Mark Nankivil

  • Archive Raider
  • Top Contributor
  • CLEARANCE: Top Secret
  • ***
  • Posts: 1268
The Model 78 is 8+ years ahead of the Chinook and more in the same generation as the Piasecki H-21 which went into service about 2 years earlier.  McDonnell proposed a number of evolutionary developments using the tip powered rotor such as the Model 99 and 113 - see:   http://www.secretprojects.co.uk/forum/index.php/topic,16674.0  but the tip powered rotor was a dead end design (noise and fuel burn) and the tandem rotor proved to be the layout of choice to go forward with.   

Enjoy the Day!  Mark

Offline hesham

  • Senior Member
  • CLEARANCE: Top Secret
  • **
  • Posts: 20474
Great find Bill.

Offline Tailspin Turtle

  • Naval Aviation Author
  • Top Contributor
  • CLEARANCE: Top Secret
  • ***
  • Posts: 667
    • U.S. Navy Aircraft History
Was the Model 78 ever designed to be a competitor to the Chinook?  Pity it was never built.

The Navy issued contracts to both McDonnell and Sikorsky for this marine assault mission, designated HRH and HR2S respectively. McDonnell's contract was subsequently terminated. The resulting Sikorsky helicopter is better known as the H-37, its Army designation. As Mark noted, this program was almost a decade earlier than the Chinook.