It says AH140There isn't a pennant number on either side of the ship in the images available.
It says AH140There isn't a pennant number on either side of the ship in the images available.
There is on the second image of your post I first replied to. But you are right that there's nothing in the physical model from DALOView attachment 822548
No, it's blank.
As for '31 Type 31s by 2031', Sir Hine is living in delusion. Assuming the AH140 wins every programme it is involved in, that'd still only be 21 (2 for NZ, 3 for Denmark, 4-5 for Chile, 11 for the UK). Not only is that a big assumption, it's still not enough to reach the target.AH140 for Denmark. Lots of hybrid navy talk, not much on the actual frigate.
View: https://www.youtube.com/watch?v=qzvMyLPUMxA
Plenty of capable European radar options out there.So, not what's being offered to Denmark. Seems like they're really believing that the Danes will buy into a completely unproven air defence concept, that lacks the backstop of a capable shipboard radar. Just rolling out the carpet for Naval Group, I guess.
I think you're reading that wrong. Denmark hasn't detailed what they want for their next frigates, and still tossing up what to do with the IVs. Babcock is just showing them that their platform has the flexibility to choose different systems to suit their requirements without having to buy into unfamiliar systems ... Like FDI.So, not what's being offered to Denmark. Seems like they're really believing that the Danes will buy into a completely unproven air defence concept, that lacks the backstop of a capable shipboard radar. Just rolling out the carpet for Naval Group, I guess.
It's obvious now that wasn't really Germany's fault but it did become their problem. The Dutch -Damen more specifically- should be viewed with great caution; they can't seem to deliver on their programmes. Germany might be good for sourcing parts from, like a radar.Germany....
Not a great option considering how things have progressed.
And that's tainted the Dutch.
Plenty of capacity at Rosyth though. And really that's where they'd be looking to buy from.UK won over Norway and that might be a minus, but I'd suspect it's the slow delivery pace that has them more worried.
I don't know, Hine seemed pretty clear that they're pushing the hybrid approach on Denmark.I think you're reading that wrong. Denmark hasn't detailed what they want for their next frigates, and still tossing up what to do with the IVs. Babcock is just showing them that their platform has the flexibility to choose different systems to suit their requirements without having to buy into unfamiliar systems ... Like FDI.
Not sure how Denmark will feel about buying American now though.
You're missing the 4 Indonesian Balaputradewas and the 3 plus 5 options for the Polish Wichers.As for '31 Type 31s by 2031', Sir Hine is living in delusion. Assuming the AH140 wins every programme it is involved in, that'd still only be 21 (2 for NZ, 3 for Denmark, 4-5 for Chile, 11 for the UK). Not only is that a big assumption, it's still not enough to reach the target.
What we know of the issues suggests it was specific to the collaboration. Still Damen's fault for not sorting out the data sharing issues, but not something that would necessarily affect a Damen-only build.It's obvious now that wasn't really Germany's fault but it did become their problem. The Dutch -Damen more specifically- should be viewed with great caution; they can't seem to deliver on their programmes.
Good point, I'd completely forgotten those. Hey, he might make it after all.You're missing the 4 Indonesian Balaputradewas and the 3 plus 5 options for the Polish Wichers.
(And being pedantic, it's Sir Nick, not Sir Hine, Sir/Dame always goes with the first name, not surname.)
You might be thinking of the F127 project where Germany decided to go it alone. But there was also issues with F126 beyond just handing over the data, the design had issues that delayed it, and costs inflated hugely (or Rheinmetall was trying to pull a fast one).What we know of the issues suggests it was specific to the collaboration. Still Damen's fault for not sorting out the data sharing issues, but not something that would necessarily affect a Damen-only build.
The ASWF is having serious redesigns. Thanks to all the shit the Dutch are learning from what's going on in the world. Damen is NOT to blame, the customer is.You might be thinking of the F127 project where Germany decided to go it alone. But there was also issues with F126 beyond just handing over the data, the design had issues that delayed it, and costs inflated hugely (or Rheinmetall was trying to pull a fast one).
Now the ASWF is having serious problems and Belgium is looking at other options.