Yes. it is a 'trad-ish' layout, but proportions remind me of the so-neat sub-scale delta which was built and flown to test planform of what became the RAF's Avro Vulcan...
Are, yes, the Avro 707.
Yes. it is a 'trad-ish' layout, but proportions remind me of the so-neat sub-scale delta which was built and flown to test planform of what became the RAF's Avro Vulcan...
Which was an artifact of the extremely restrictive US Rules of Engagement, requiring Positive Visual ID of a target before engaging.That's all well and good, but the Vietnam War showed how bad it was when the F-4B didn't have a cannon for close combat.
Which was an artifact of the extremely restrictive US Rules of Engagement, requiring Positive Visual ID of a target before engaging.
As it worked out, the US forces didn't have a good IFF system till the 1970s, so requiring visual ID also prevented a lot of fratricide.You can blame Johnston and McNarama for that bit of idiocy, their idiotic rules about targets the USAF, USN and USMC could and could not strike greatly prolonged the Vietnam war also preventing the US from steam-rolling North Vietnam.
Indeed! No Rutan DNA in anything since the Bipod, which was Rutan's last design while at Scaled.No Rutan DNA in the 401 design...
I believe the Model 437 was conceived as an Optionally Piloted Vehicle, as opposed to the original Model 402 from which it derived.The pilot seat has been removed?
![]()
Scaled Composites swiftly transforms Model 437 to support Beacon™ autonomy initiative - News | Scaled Composites
Scaled Composites is partnering with Northrop Grumman on the recently announced Beacon autonomous testbed ecosystem, which leverages the Model 437 as an airborne test platform. Scaled Composites has extensive experience employing demonstrators to evolve low technology readiness level solutions...scaled.com
The pilot seat has been removed?
Cold beer storage a new DOD mandate for *all* new aircraft procurement programs.
Unfortunately, the Lockheed Martin CCTDPDS (Common Cold Tap Dispensing and Precision Delivery System) is three years behind schedule and $120m overrun. Program management could not be roused for comment after the latest re-baseline meeting.Cold beer storage a new DOD mandate for *all* new aircraft procurement programs.
Program management could not be roused for comment after the latest re-baseline meeting.
No doubt mandated by Pete Hogshead.
Ground targets.As it worked out, the US forces didn't have a good IFF system till the 1970s, so requiring visual ID also prevented a lot of fratricide.
It's hard to stop a Trane!And apparently replaced with a mini fridge?
Well, they are reported to have sent a proposed 12-step recovery program to SecDef Hegseth.No doubt afterwards they'd release a statement saying they were hammered by the problem.
Variations have done the rounds - beer, whisky, wine.Unfortunately, the Lockheed Martin CCTDPDS (Common Cold Tap Dispensing and Precision Delivery System) is three years behind schedule and $120m overrun. Program management could not be roused for comment after the latest re-baseline meeting.
I believe the Model 437 was conceived as an Optionally Piloted Vehicle, as opposed to the original Model 402 from which it derived.