MDS Updates for 2025 (until early December)
In December, I filed another FOIA request for the latest MDS designations, allocated since January 2025. Today I received the reply.
The list was not exactly what I expected, so some remarks first:
- Only 12 new MDS records were included. This is very few for 11 months.
- Of these 12, 4 designations were already known (F-47A, YFQ-48A, AQM-88A, AGM-158D), so there are only 8, which I hadn't seen before. Of these 8, not a single one refers to a manned aircraft!
- YFQ-42A and YFQ-44A were missing, which is strange, because the USAF announced them quite loudly 9 months ago. One wonders, what else is missing.
So, here is the list of the 8 "new" designations. I show the MDS, Date (of approval), Service, Manufacturer and Engine Data from the official record, followed by my own comment.
YRQ-30A
Date: 29 April 2025
Service: Army
Manufacturer: Griffon
Engine(s): 1 HFE DA-215 EFI Hybrid Generator
Comment: This is exactly the same entry, which was listed as
YRQ-11A in my previous data, and therefore refers to the Griffon
Valiant, one competitor of the now-cancelled FTUAS (Future Tactical Uncrewed Aircraft System) Increment 2 program. Apparently the Army realized, that they already have an RQ-11A in their inventory (AeroVironment
Raven), and changed the designation.
As a side note: In late March 2025, I actually inquired at some Army public relations point-of-contact about the duplicate RQ-11 designation, and also filed a FOIA for relevant documents. I never got a reply, though.
MQM-172A
Date: 05 March 2025
Service: Army
Manufacturer: Griffon Aerospace
Engine(s): 1 3W 68iB-TS, 61 HP, 44.8 kW
Comment: This Griffon's
Arrowhead Aerial Target , a Shahed-136 look-alike target drone. I already knew that Griffon markets it as "MQM-172", but didn't yet that this is another out-of-sequence number. I wonder why, because while it does kind of "follow up" from Griffon's MQM-170 and -171, they also build the MQM-186, so they should know that the numbers have advanced a bit.
AGM-188A
Date: 17 September 2025
Service: Air Force
Manufacturer: Zone 5 Technologies
Engine(s): 1 PBS TJ-80
Comment: see AGM-189A below.
AGM-189A
Date: 17 September 2025
Service: Air Force
Manufacturer: Anduril Industries
Engine(s): 1 TDI TJ series
Comment: The AGM-188A and -189A must be the two finalists in the USAF's ETV (Enterprise Test Vehicle) program to develop low-cost cruise missiles. The contracts were announced to go the Anduril (with the
Barracuda-500) and Zone 5 (with the
Rusty Dagger).
AGM-190A
Date: 21 November 2025
Service: USSOCOM
Manufacturer: Leidos/Dynetics
Engine(s): 1 Pratt & Whitney TJ150-7
Comment: This must be the Leidos
Black Arrow "Small Cruise Missile". Manufacturer/Service/Engine is a perfect fit.
AHM-4A
Date: 23 April 2025
Service: Air Force
Manufacturer: Raytheon
Engine(s): 1 Dual-Mode Ramjet
Comment: The "official name" is explicitly given as "Hypersonic Attack Cruise Missile (HACM)". The H-for-Hypersonic "mission" letter (it's not really a
mission, though) was added to the designation system in March 2025. But the design number -4 is a mystery. I would have expected either an in-sequence designation in the M-series, or some "special" number (e.g. AHM-200), or AHM-1, because it is the first designation with the new H-designator (I know, that this wouldn't follow the regulation). But -4? Weird.
X-68A
Date: 20 August 2025
Service: DARPA
Manufacturer: General Atomics
Engine(s): 1 Williams WJ38-15
Comment: The "official name" is explicitly given as "Longshot". I would never have guessed that DARPA designates
Longshot as an X-plane!
X-76A
Date: 20 October 25
Service: DARPA
Manufacturer: Bell Textron
Engine(s): 2 GE CT7-8, PW308C+
Comment: Given the data, I think it's
very likely, that the X-76A is the demonstrator for DARPA's SPRINT (Speed and Runway Independent Technologies) program, but there is no absolute certainty.
Also, -76 is obviously out-of-sequence. X-69A would have been next in line. Even if they skip -69 for the same reason that H-69 was skipped many years ago, I don't see what's wrong with X-70 (or -71 for that matter). Skipping X-72 and -73 is understandable (because of XRQ-72A and XRQ-73A), but than again -74 seems to be fine. Therefore I guess that -76 was specifically allocated for a certain reason, which we don't know (yet). Maybe Bell wanted to follow-up from their MV-75 plane for the Army?
That's all for now. The next posting of this kind my come in another 12 months

.