Hull down
ACCESS: Secret
- Joined
- 19 February 2023
- Messages
- 205
- Reaction score
- 536
Any further info? Page is hidden behind subscription wall.
Any further info? Page is hidden behind subscription wall.
The Lotus UAS design in some ways resembles features of the newly revealed Lockheed Martin Project Vectis, with a long, slender fuselage positioned forward of the leading edges of the wings, capped by a nose with swept-back edges leading to a slender point.
In many other respects, the Lotus and Vectis designs diverge. Unlike the engine inlet mounted low at mid-fuselage for the Vectis aircraft, the Lotus inlet sits high atop of the extreme aft section of its fuselage. The Lotus also sports sharply canted tails, breaking from the tailless-configured Vectis.
What is the source selection timeline for CCA Increment 2? What sort of advantage an early 2026 first flight would have vs a mid to late 2027 first flight when pitted against that timeline?It’s pretty light on details. If anything my takeaway is Lotus if flying now, not in two to X”0” years… which is actually a real thing
A further note - first to flight with a design amenable to a final configuration and manufacturability actually matters quite a damn, in my book.
What is the source selection timeline for CCA Increment 2? What sort of advantage an early 2026 first flight would have vs a mid to late 2027 first flight when pitted against that timeline?
It may seem like its not innovative enough but that's probably because of the angle of the photo. When looked at from the side its very innovative.All the hype for just another Valkyrie type drone? At least that LM Vectis thing is somewhat more innovative than that.
LM's Vectis seems to be the configuration standout, even though top inlet but no vertical tails. YFQ-42, Project Talon, XQ-58 all similar, YFQ-44 bottom inlet, single vertical. Ghostbat different and larger. I agree, not too exciting.It seems like everybody is making the exact same airplane, just with a different manufacturer behind it. A high-subsonic medium altitude cruising drone.
Effective? Maybe. Exciting? No. A single point of design failure? Yes.
All the hype for just another Valkyrie type drone? At least that LM Vectis thing is somewhat more innovative than that.
I agree, Talon probably cheaper than Vectis but I think LM is going to get a consolation prize for not being selected for NGAD.To my ignorant eyes, Lotus looks substantially cheaper to build than Vectis.
I mean, yes it's funny, but I also expect that the mission is one of the ones to be filled. GMTI and/or BACN, possibly both in the same airframe same time or possibly two similar airframes.
The Vectis design seem to be more dynamic and with a more powerfull engine could be supersonic capable.I agree, Talon probably cheaper than Vectis but I think LM is going to get a consolation prize for not being selected for NGAD.
Isn't this quite unusual to give the airframe a designation without a contract award as the YFQ-42 and 44 were designated 9 months after the CCA 1 winners were announced?
From the known allocated numbers, it seems very likely that "(Y)F" and "(Y)FQ" designations now share a single number space. Therefore I wouldn't wait for a "YFQ-47" (and neither for a YFQ-45).we still need YFQ-45, 46, and 47.
They shouldn't.From the known allocated numbers, it seems very likely that "(Y)F" and "(Y)FQ" designations now share a single number space. Therefore I wouldn't wait for a "YFQ-47" (and neither for a YFQ-45).
Needs more letters, not enough.They shouldn't.
Each foundation designation has its own series. Q, F, A, B, E, S, P, etc.
We haven't used Z in decades. That'd be fun to see again!Needs more letters, not enough.