Any engineer would have had that case crosschecked during the design. Backflow are pretty standard and not something unknown.
I would guess that the failure here comes from the division of tasks, with people and projects structured around keywords and not much more. Here the bleed air manager never envisioned much of the engine failure cases. Not his domain.
Any rigorous analysis should have detected this. Noxious fumes are also often leaving traces and residues. It is concerning that tracking back their source took so much time.
I would guess that the failure here comes from the division of tasks, with people and projects structured around keywords and not much more. Here the bleed air manager never envisioned much of the engine failure cases. Not his domain.
Any rigorous analysis should have detected this. Noxious fumes are also often leaving traces and residues. It is concerning that tracking back their source took so much time.
Last edited: