All you really need for a nuclear submarine is a moderately sized floating drydock. No need for multi-billion dollar funding and a decade of planning. There are plenty of available floating drydocks with more than adequate capacity. https://horizonship.com/ship-category/barges-for-sale/floating-dry-docks-for-sale/
Admittedly, the shape of the pier at Bangor made installing a drydock rather trivial. It's triangular-shaped, point out on the water. The drydock is on the base side of the triangle, and the whole pier sits a couple hundred feet off the shoreline.A moderately sized 'nuclear certified' drydock....
And at that point the costs go through the roof. In all seriousness by the time you've done that you may as well have constructed a big, fixed drydock and have it as a facility for decades to come. The RN made the mistake of thinking similar in the 80's and built the Syncolift at Faslane....which is now one of the reasons the RN's sub fleet is in dire straits. It cost way more than expected and they could have built a new drydock easily with the cost it eventually ran out to. If they'd just built a proper dry dock they wouldn't have the issues they have. Unfortunately they're about to attempt to repeat the mistake as they're looking for a floating drydock for Faslane....a decision they will either stop in time or live to regret...
Thank you!
I get the feeling this was a case where it cost basically nothing to apply across the whole fleet and it is a useful emergency capability for USN and RAN aircraft to use British warstocks just in case.Stingray torpedoes to equip US and Australian P8 aircraft is a surprising development, we weren't even sure they would be equipping British P8 aircraft with them!
Crud, it's probably cheaper to apply across the entire fleet than it is to just do for the 9(!) UK aircraft.I get the feeling this was a case where it cost basically nothing to apply across the whole fleet and it is a useful emergency capability for USN and RAN aircraft to use British warstocks just in case.
Aukus’ original sin is that - because of the need for total secrecy - it was really a half-baked idea discussed only at the most senior levels among a few politicians and a handful of their favorite admirals whispering in their ear.It does not seem like the authors of the report asked the Australians?
I’ve been reading Ron O’Rourkes reports for years so I’m aware. The question still stands why he would bring up such a speculative scenario? I dont know his process to be sure, but I doubt that the scenarios he puts forward are his brainchild, they are more likely to reflect what people are whispering in Washington or briefing off the record.So this is Ron very loosely speculating about alternative Australian strategies for Congress to consider. It's not an expression of US policy.
Wrong, it’s not Congress. The USN can’t order 2 boats a year because industry is only able to deliver 1.3/year and the backlog just keeps growing, so the USN has actually had to beg Congress not to make it order more subs.Depending on when Oz wants to buy their Virginia-class, it'd be relatively simple to have them buy the long-lead items to keep the shipyards making two boats per year when Congress makes the USN only buy one boat a year.
~6-12 months to get them cleared, though if there's nothing obvious popping up they can be given interim access before then.Wrong, it’s not Congress. The USN can’t order 2 boats a year because industry is only able to deliver 1.3/year and the backlog just keeps growing, so the USN has actually had to beg Congress not to make it order more subs.
This problem won’t go away until industry hires and trains enough workers to handle both SSBN production and 2-2.33 SSNs/year. Jury’s still out IMHO on whether industry can deliver on their promises.
https://www.theguardian.com/world/2...richard-marles-on-track?CMP=oth_b-aplnews_d-5The admiral who runs America’s submarine building program has confirmed construction is behind schedule and nowhere near the rate required to supply Australia’s Aukus nuclear submarines on schedule.
R Adm Jon Rucker told the Naval Submarine League’s annual symposium in Arlington, Virginia, last week that the US had “an exceptionally fragile” military shipbuilding base and could not meet construction rates for its own vessels this year.