- Joined
- 27 September 2006
- Messages
- 6,622
- Reaction score
- 7,443
It is pretty much agreed by everyone that P1154 had to be cancelled in 1965. But what plane or planes should have been ordered to replace it?
By 1975 the RAF had received Spey powered Phantoms and P1127RAF aircraft with Jaguars being ordered in 1970 to allow the Phantoms to replace Lightnings.
If various sources from Defence Secretary Healey to RAF pilots are to be believed what the RAF actually wanted was standard US=engined Phantoms alone. The 1127RAF and Jaguar were forced on to preserve jobs at Hawkers and BAC as well as Rolls Royce for the Phantom.
Many, perhaps most, here would say that this was necessary and saved the UK industry.
Except that West Germany managed to buy US Phantoms and then insist on leading the MRCA programme. BAC might have been able to do so instead if licence built F4s kept it going and the Tornado ADV had been ordered with the IDS earlier. Hawkers could have developed the Hawk earlier perhaps as a programme with Breguet instead of Jaguar. P1127RAF would not have been missed except by the Royal Navy.
Imagine the situation in 1970 with Phantoms replacing Hunters, Canberras and Lightnings and Hawks taking over from Gnat and some Hunters. The UK not Germany has the most MRCA on order. But the RN is about to lose its Sea Vixen equipped carriers after the cancellation of CVA01 and the Spey Phantoms for it and Eagle. The Heath government is elected in June 1970 committed to closer ties with Europe and keeping the RN in the carrier business. Eagle and Hermes need a Sea Vixen replacement and a cheaper carrier design than CVA01 is needed to replace them both in the CTOL and ASW (Seaking or even S3) role.
Heath and Pompidou are very similar men. France needs to replace Foch and Clemenceau late in the decade and the F8 Crusaders they carry. Two carriers each for UK and France by 1980 is soon agreed though the designs will not be completely standard. The RN needs a Sea Vixen replacement off the shelf in the short term and a Sea Vixen/Buccaneer replacement by 1980. BAC proposes a modified MRCA while Dassault looks both at Super Etendard and Mirage variants. The RN short term need is met by leasing ex USN F8s and Sidewinders for Eagle and Hermes. Talks on the future MN/RN carrier combat aircraft are unresolved when the Wilson government takes over in 1974 but the first new carriers have been ordered in 1973.
By 1975 the RAF had received Spey powered Phantoms and P1127RAF aircraft with Jaguars being ordered in 1970 to allow the Phantoms to replace Lightnings.
If various sources from Defence Secretary Healey to RAF pilots are to be believed what the RAF actually wanted was standard US=engined Phantoms alone. The 1127RAF and Jaguar were forced on to preserve jobs at Hawkers and BAC as well as Rolls Royce for the Phantom.
Many, perhaps most, here would say that this was necessary and saved the UK industry.
Except that West Germany managed to buy US Phantoms and then insist on leading the MRCA programme. BAC might have been able to do so instead if licence built F4s kept it going and the Tornado ADV had been ordered with the IDS earlier. Hawkers could have developed the Hawk earlier perhaps as a programme with Breguet instead of Jaguar. P1127RAF would not have been missed except by the Royal Navy.
Imagine the situation in 1970 with Phantoms replacing Hunters, Canberras and Lightnings and Hawks taking over from Gnat and some Hunters. The UK not Germany has the most MRCA on order. But the RN is about to lose its Sea Vixen equipped carriers after the cancellation of CVA01 and the Spey Phantoms for it and Eagle. The Heath government is elected in June 1970 committed to closer ties with Europe and keeping the RN in the carrier business. Eagle and Hermes need a Sea Vixen replacement and a cheaper carrier design than CVA01 is needed to replace them both in the CTOL and ASW (Seaking or even S3) role.
Heath and Pompidou are very similar men. France needs to replace Foch and Clemenceau late in the decade and the F8 Crusaders they carry. Two carriers each for UK and France by 1980 is soon agreed though the designs will not be completely standard. The RN needs a Sea Vixen replacement off the shelf in the short term and a Sea Vixen/Buccaneer replacement by 1980. BAC proposes a modified MRCA while Dassault looks both at Super Etendard and Mirage variants. The RN short term need is met by leasing ex USN F8s and Sidewinders for Eagle and Hermes. Talks on the future MN/RN carrier combat aircraft are unresolved when the Wilson government takes over in 1974 but the first new carriers have been ordered in 1973.