Scott Kenny
ACCESS: USAP
- Joined
- 15 May 2023
- Messages
- 16,977
- Reaction score
- 24,081
Absolutely.A 3rd rail is far cheaper if you already have the power gen systems and arresting gear in. the first contract for the Emal and AAG setup was over a billion.
That's seriously impressive.Does the last sentence of the article say that the availability could reach 300 days per year or am I reading this wrong?
I mean, yes, US carriers have been out for 11 months before, but that was an extreme.
Overall length? Nimitz class is ~80ft longer.View attachment 800769
View attachment 800770
First pic from Navy lookout, have to ask, why has Pang not adopted the more optimal layout used on american carriers of the forward cats being angled from the starboard to port side rather than straight on, this would allow for simultaneous takeoffs and landings with 2 cats rather than the current version which can barely do a single cat launch while leaving the landing strip open?