- Joined
- 21 January 2015
- Messages
- 14,989
- Reaction score
- 24,201
Bizarre. Considering they indicated they wouldn’t use Space X.
Bizarre. Considering they indicated they wouldn’t use Space X.
Kuiper is not Blue Origin and Blue Origin is not Amazon.Bizarre. Considering they indicated they wouldn’t use Space X.
the company Kuiper Systems LLC is a subsidiary of Amazon.com, Inc. what is own by Jeff BezosKuiper is not Blue Origin and Blue Origin is not Amazon.
Bezos owns less than 10% of Amazon.the company Kuiper Systems LLC is a subsidiary of Amazon.com, Inc. what is own by Jeff Bezos
Blue Origin Enterprises, L.P. is not part of Amazon, but also own by Jeff Bezos
Fat hypergolic stage...could be used as tug perhaps.View: https://twitter.com/sciguyspace/status/1806373581850374214
According to him the vehicle is like to be a Dragon-XL.
Later this year, Axiom Space is set to launch a prototype of the Axiom Data Center Unit (AxDCU) to the International Space Station (ISS). This prototype will be instrumental in laying the foundation for a future orbital data center infrastructure for Axiom Station. Learn more: https://bit.ly/3VlXPbV.
Does a suitable upper stage exist? If Dragon 2 can carry 7,000lb payload what if they just expanded the tanks on a Dragon 2 capsule? Would 7,000lbs be enough? Would it even be able to dock in a suitable location?
Big cranes are cool.current progress at Tower two
![]()
No, it will from the main docking port at the end of the station, where Starliner is currently locatedIIRC the ship that boosts (or deorbits) the station has to be berthed, not docked, because of the spot it does this from. SpaceX Dragon 1 capsules (the older commercial cargo vehicle) are all berthed, so they have the knowhow and parts available for this.
No, it will be adding tankage to the trunk and it won't be a standard Dragon since the thrusters are not located properly for the task. And likely not even use the Dragon pressure vessel.Dragon design is a bit weird in that all the thrusters, their tanks and plumbing are outside the primary primary pressure vessel, distributed around the docking port/tunnel. This makes expanding tanks a bit difficult (they are volume limited), but given that the deorbit tug won't need to have habitable interior, I suspect that the solution is basically to cut a hole in the pressure vessel and put a tank inside Dragon.
COSI is a relatively small spacecraft, built by Northrop Grumman and weighing less than a ton, but it will ride alone into orbit on top of a Falcon 9 rocket. That's because COSI will operate in an unusual orbit about 340 miles (550 kilometers) over the equator, an orbit chosen to avoid interference from radiation over the South Atlantic Anomaly, the region where the inner Van Allen radiation belt comes closest to Earth’s surface.
SpaceX's Falcon 9 will deliver COSI directly into its operational orbit after taking off from Cape Canaveral, Florida, then will fire its upper stage in a sideways maneuver to make a turn at the equator. This type of maneuver, called a plane change, takes a lot of energy, or delta-V, on par with the delta-V required to put a heavier satellite into a much higher orbit.
With SpaceX quickly building necessary infrastructure at sites like LC-39A in Florida, eventual Starship launches are not far away. SpaceX and Elon have expressed in the past that while Boca Chica is a great test site and facility, the future of the vehicle likely lies in Florida. Even new reports suggest that SpaceX wants the capability to launch Starship 120 times a year from that state.
With this being said, some companies in the area are not too fond of what this could mean. Both Blue Origin and United Launch Alliance have submitted comments on the FAA’s EIS of Starship in the area. Their comments include concern about Starship’s impact on their employees, general operations, noise, health, etc. Here I will go more in-depth into what both companies had to say, the significance of these comments, future plans, and more.
For more space-related content check out - https://thespacebucket.com/https://www.youtube.com/redirect?ev...Q&q=https://thespacebucket.com/&v=tASr5adgKCo
Theme from the 1968 Steve Mcqueen movie Bullitt.Something from the Thunderbirds?
I was thinking either this:
View: https://www.youtube.com/watch?v=O0Fg_NTpXaw
Or this.
View: https://www.youtube.com/watch?v=tQzk09j2lZ8
NSS learned its lesson from EELV and ULA, that why when I was at the SPO we wrote the New Entrants Certification Guide, of which I was a reviewer.DoD is eager to diversify its rocket portfolio and will likely throw money at BO, since it is another large most reusable rocket outside the F9 near monopoly.
Not really.the DOD isn't going waste money when BO is throwing its own money and the DOD has ULA.DoD is eager to diversify its rocket portfolio and will likely throw money at BO, since it is another large most reusable rocket outside the F9 near monopoly.
It was ITS...Interplanetary Transport System...in 2018.That was called MCT I think
https://en.wikipedia.org/wiki/SpaceX_Mars_Colonization_ProgramView: https://www.youtube.com/watch?v=WnLATDZM-ro
Composites looked to be the initial idea.
Remember, Musk has the old Beal facility---and Beal had one of the largest filament winding machines ever made. I don't know what happened to that---but the composite tank that failed was said to come from Japan---so who knows?
Now, might some ablative recipes also allow them to serve as tile adhesives?
If so, there is only a need to “spackle” missing tiles—not a whole tear down.
Longer tankage and additional propellant will make up for the mass, I trust.
I would like to see Elon look at new tesselations. One known as “the hat” may be of use:
View: https://m.youtube.com/watch?v=f4X9msxVnDs&ab_channel=NationalMuseumofMathematics
nonsense. That wouldn't be feasible. Too big to handle.18 meters wide? That's ridiculous
Make it 30 meters.
Convair study for NEXUS a diameter of 36 to 61 meter, they consider it feasible to handle.nonsense. That wouldn't be feasible. Too big to handle.
not cost effectivelyConvair study for NEXUS a diameter of 36 to 61 meter, they consider it feasible to handle.
Also Martin for there NOVA rocket with diameter 30 meter
They look into Hybrid assembly/launch tower
NOVA were never cost effectively, despite NEXUS was planned as reusable.not cost effectively