Menu
Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Registered members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Hi Guest! Forum rules have been updated. All users please read
here.
Home
Forums
Secret (Unbuilt) Projects
Secret Army Projects
US Army XM1 MBT Comp
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Pioneer" data-source="post: 291237" data-attributes="member: 122"><p>Just stumbled across this -</p><p></p><blockquote><p>In the late 1970s, two companies, Chrysler and General Motors, had competing prototypes of the M-1. General Motors had a large and traditional diesel engine in the tank, and Chrysler, which had tried and failed to develop turbine engine technology for cars and trucks for the commercial market, wanted to recoup their costs and put a risky and complicated turbine engine in their tank. The Army was ready to give the contract to General Motors, but politics intervened. In 1987, the Washington Monthly laid out the scene around the all-important decision of what tank was to be chosen:</p><p>On a July afternoon ten years ago, Lt. Colonel George Mohrmann sat at his desk on Capital Hill awaiting a phone call. As head of the Army’s congressional liaison office, he was ready to deliver a stack of sealed letters to members of Congress announcing the winning contractor in the multi-billion dollar competition to build the Army’s M-1 tank.</p><p>The two competing contractors, Chrysler and General Motors, offered a clear choice. Chrysler had built its tank around a radically different and unproven tank engine, the turbine; GM had used a more conventional diesel engine. The two tanks had undergone months of head-to-head trials at Aberdeen Proving Ground in Maryland.</p><p>GM had won.</p><p>The Army, it seemed, was not going to risk adding the M-1 to its growing list of overly sophisticated weapons that cost too much and don’t work. “We were sitting there poised to deliver [the envelopes],” Mohrmann recalls. “The decision [to select GM] had been made. We were just waiting for the Secretary of Defense to be briefed.”</p><p>The call, however, was surprising. The Pentagon told Mohrmann not to deliver the letters. The next day, Defense Secretary Donald Rumsfeld ordered a whole new round of competition. A week later, Rumsfeld turned the M-1 tank program upside down. He mandated that the tank be redesigned to incorporate the turbine engine. Four months later the award-which promised to generate $20 billion in sales – went to Chrysler and the Army was on its way to getting a weapon suited more for a paved interstate than a battlefield.</p><p>… That isn’t another story about the Army’s incompetent bureaucracy. “You can blame the Army for a lot of things,” says Anthony Battista, a staff member of the House Armed Services Committee, “but not for the troubles of the M-1.” Rather, it’s a story of how outside factors can overwhelm military considerations in the Pentagon decision-making process, how narrow interests – in this case the ailing Chrysler Corporation and, by a strange twist, the U.S. Air Force – can outweigh the need for a reasonably-priced and effective military. The M-1 was never just a weapon; it was also a bail-out package.</p></blockquote><p></p><p>(Source: https://weaponsandwarfare.com/2015/08/15/general-motors-xm-1/)</p><p></p><p>Thought it was interesting, and yet so typically American (No insult intended!!)</p><p></p><p>Also found this snippet of info interesting -</p><p></p><blockquote><p>The Americans set up a total of 117 criteria for the comparison test. The same criteria were also used to choose between the two versions of the XM-1 from Chrysler and General Motors. Some 40 criteria were not rated; of the remaining 77 criteria the Leopard [the West German supplied Leopard 2] met 61, the XM-1 48. Even in terms of this "go-no-go" procedure, the Leopard would have to be better than the XM-1, without any kind of statement concerning the extent to which a criterion was met. The 117 criteria were combined into 17 evaluation groups by the U.S. Army — and suddenly the picture of the comparison, which was also communicated to the public, appeared completely different. The Leopard met only 6 of the 17 requirements, the XM-1, on the other hand, met 16. For example, survival capability of the crew, and the equipment and the height of the vehicle, reliability and weight existed side by side with equal weighting in these 17 evaluation criteria.</p></blockquote><p>(SOURCE: http://www.globalsecurity.org/military/world/europe/leopard2-design.htm )</p><p></p><p></p><p>Regard</p><p>Pioneer</p></blockquote><p></p>
[QUOTE="Pioneer, post: 291237, member: 122"] Just stumbled across this - [quote]In the late 1970s, two companies, Chrysler and General Motors, had competing prototypes of the M-1. General Motors had a large and traditional diesel engine in the tank, and Chrysler, which had tried and failed to develop turbine engine technology for cars and trucks for the commercial market, wanted to recoup their costs and put a risky and complicated turbine engine in their tank. The Army was ready to give the contract to General Motors, but politics intervened. In 1987, the Washington Monthly laid out the scene around the all-important decision of what tank was to be chosen: On a July afternoon ten years ago, Lt. Colonel George Mohrmann sat at his desk on Capital Hill awaiting a phone call. As head of the Army’s congressional liaison office, he was ready to deliver a stack of sealed letters to members of Congress announcing the winning contractor in the multi-billion dollar competition to build the Army’s M-1 tank. The two competing contractors, Chrysler and General Motors, offered a clear choice. Chrysler had built its tank around a radically different and unproven tank engine, the turbine; GM had used a more conventional diesel engine. The two tanks had undergone months of head-to-head trials at Aberdeen Proving Ground in Maryland. GM had won. The Army, it seemed, was not going to risk adding the M-1 to its growing list of overly sophisticated weapons that cost too much and don’t work. “We were sitting there poised to deliver [the envelopes],” Mohrmann recalls. “The decision [to select GM] had been made. We were just waiting for the Secretary of Defense to be briefed.” The call, however, was surprising. The Pentagon told Mohrmann not to deliver the letters. The next day, Defense Secretary Donald Rumsfeld ordered a whole new round of competition. A week later, Rumsfeld turned the M-1 tank program upside down. He mandated that the tank be redesigned to incorporate the turbine engine. Four months later the award-which promised to generate $20 billion in sales – went to Chrysler and the Army was on its way to getting a weapon suited more for a paved interstate than a battlefield. … That isn’t another story about the Army’s incompetent bureaucracy. “You can blame the Army for a lot of things,” says Anthony Battista, a staff member of the House Armed Services Committee, “but not for the troubles of the M-1.” Rather, it’s a story of how outside factors can overwhelm military considerations in the Pentagon decision-making process, how narrow interests – in this case the ailing Chrysler Corporation and, by a strange twist, the U.S. Air Force – can outweigh the need for a reasonably-priced and effective military. The M-1 was never just a weapon; it was also a bail-out package.[/quote] (Source: https://weaponsandwarfare.com/2015/08/15/general-motors-xm-1/) Thought it was interesting, and yet so typically American (No insult intended!!) Also found this snippet of info interesting - [quote]The Americans set up a total of 117 criteria for the comparison test. The same criteria were also used to choose between the two versions of the XM-1 from Chrysler and General Motors. Some 40 criteria were not rated; of the remaining 77 criteria the Leopard [the West German supplied Leopard 2] met 61, the XM-1 48. Even in terms of this "go-no-go" procedure, the Leopard would have to be better than the XM-1, without any kind of statement concerning the extent to which a criterion was met. The 117 criteria were combined into 17 evaluation groups by the U.S. Army — and suddenly the picture of the comparison, which was also communicated to the public, appeared completely different. The Leopard met only 6 of the 17 requirements, the XM-1, on the other hand, met 16. For example, survival capability of the crew, and the equipment and the height of the vehicle, reliability and weight existed side by side with equal weighting in these 17 evaluation criteria.[/quote] (SOURCE: http://www.globalsecurity.org/military/world/europe/leopard2-design.htm ) Regard Pioneer [/QUOTE]
Verification
What year was Concorde's first flight? (answer has 4 numbers)
Post reply
Home
Forums
Secret (Unbuilt) Projects
Secret Army Projects
US Army XM1 MBT Comp
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.
Accept
Learn more…
Top