Grey Havoc
ACCESS: USAP
- Joined
- 9 October 2009
- Messages
- 24,500
- Reaction score
- 18,175
Well, speeding for a cargo ship......
I am surprised that the fine is not the other way around. It's my understanding that canal transits are under the direct authority of an onboard deployed pilot trained and employed by the canal operator...
How wide apart are Chinese rails?I happen to work in that sector... Ships, trucks and trains...And considerably more than 4 tracks to unload it at the railhead! Each train would need access to an unloading crane, and a quick google suggests maximum unloading speed for quayside gantries is about 1 container a minute. I don't expect trackside cranes to be particularly faster. So a 50 container train would need at least 50 minutes to unload. Or close enough to an hour by the time you've marshalled it into place. 15 trains an hour means a minimum of a 15 track unloading facility, each track with its own crane. 15 tracks isn't unprecedented for goods yards, but it's still a big yard. And you either need trucks to take them away, or container stackers to shunt them around if you're holding them on site.
A train carries ~50 containers. Ever Given carries 20,000, so each ship that size requires ~400 trains to replace it. Rotterdam receives on the order of 22000 containers/day, so you'd need a train to arrive every 3.6 minutes all day long to replace that. That much traffic requires 4 dedicated tracks all the way from Rotterdam to Shenzen.
You can have multiple cranes per track... Depends on how big the terminal is..
But 15 tracks is not something I have seen at a (intermodal)terminal, I see usually around 8 tracks.
I see more and more terminal pop-up in Eastern Europe that are connections between the Asian trainnetworks and the European networks. Specialising in moving containers from one track-system to another.
It is also possible to store containers 2 on top of each other, so in effect doubling capacity of a train. ( Something common in China and the USA, but not allowed in Europe)
There are already different routes from China into Europe, and more may be on the way.
Rob
| Railway Track Gauge | Countries |
| 2134mm ( 7ft ) | UK |
| 1829mm | Moscow-St. Petersburg Line, U.S. Erie Line |
| 1674mm (5ft 5in) | Spain |
| 1665mm (5ft 5in) | Portugal |
| 1600mm | Ireland, Northern Ireland (UK), Australia (Victoria and South Australia), Brazil |
| 1524mm (5 feet) 1520mm | Russia, Kazakhstan, Kyrgyzstan, Uzbekistan, Turkmenistan, Georgia, Azerbaijan, Armeria, Estonia, Latvia, Lithuania, Russia, Belarus, Ukraine, Moldova, Mongolia, Finland (Grand Duchy of Russia in the 19th century), Peak Cable car (Hong Kong, China) |
| 1435mm (4ft 8½in) | China, North Korea, South Korea, Japan (Tokaido, Sanyo and other Shinkansen), Iran, Iraq, Syria, Lebanon, Israel, Turkey, Egypt, Tunisia, Mauritania, Gabon, Denmark, Norway, Sweden, Poland, Czech Republic, Slovakia, Hungary, Germany, Austria, Liechtenstein, Switzerland, Netherlands, Belgium, Luxembourg, United Kingdom, France, Monaco, Italy, Vatican, Yugoslavia, Slovenia, Croatia, Bosnia and Herzegovina, Macedonia, Romania, Bulgaria, Albania, Greece, United States, Canada, Mexico, Cuba, Dominica, Colombia, Venezuela, Guyana, Peru, Argentina, Paraguay, Uruguay, Australia, Taiwan High-Speed Rail, Taipei MRT and Kaohsiung MRT-Taiwan Taoyuan International Airport MRT (China Taiwan), East Rail Line-West Rail Line-Light Rail and Maanshan Line (Hong Kong, China), Madrid-Serbia High-Speed Railway (Spain) |
| 1432mm | London Underground (UK), Tsuen Wan Line-Island Line-Tung Chung Line-Machine Line Express-Tseung Kwan O Line (Hong Kong, China) |
| 1372mm | Keiking Electric Railway – Tokyu Shinjuku Line – Hakodate Shibuya Line – Dotoku Line (Japan) |
| 1067mm | Japan (80%), Australia (Queensland), New Zealand, Taiwan Province (China), India, Pakistan, Ghana, Congo, Tanzania, Zambia, Indonesia, South Africa, Angola, Botswana, Jordan, Algeria, Morocco, Sierra Leone, Liberia, Nigeria, Angola, Zimbabwe, Malawi, Mozambique, Swaziland, Namibia, Sudan, Ghana, Lesotho, Honduras, Costa Rica, Dominica, Ecuador, the Philippines, Hainan Province (China), South Sakhalin ( Sakhalin) (Russia) |
| 1090mm | Switzerland |
| 1050mm | Palestine, Angola |
| 1000mm | China (Kunming to Hekou), Vietnam, Cambodia, Laos, Thailand, Malaysia, Myanmar, India, Bangladesh, Pakistan, Mali, Guinea, Senegal, Burkina Faso, Côte d’Ivoire, Togo, Benin, Cameroon, Ethiopia, Tunisia, Djibouti, Kenya, Uganda, Tanzania, Madagascar, Switzerland, Spain, Puerto Rico, Brazil |
| 914mm | Panama, Colombia, El Salvador, Guatemala, Peru |
| 800mm | Switzerland |
| 762mm | Sugar Railway, Alishan Forest Railway, Eastern Taitung Line (Taiwan, China) |
| 760mm | India, Nepal, Indonesia |
| 610mm | India |
China and Europe use the same track gauge, but Russia has a different gauge. There are other differences too (different couplings between rail cars, for example), most commonly the containers are shifted from one train to the other.How wide apart are Chinese rails?I happen to work in that sector... Ships, trucks and trains...And considerably more than 4 tracks to unload it at the railhead! Each train would need access to an unloading crane, and a quick google suggests maximum unloading speed for quayside gantries is about 1 container a minute. I don't expect trackside cranes to be particularly faster. So a 50 container train would need at least 50 minutes to unload. Or close enough to an hour by the time you've marshalled it into place. 15 trains an hour means a minimum of a 15 track unloading facility, each track with its own crane. 15 tracks isn't unprecedented for goods yards, but it's still a big yard. And you either need trucks to take them away, or container stackers to shunt them around if you're holding them on site.
A train carries ~50 containers. Ever Given carries 20,000, so each ship that size requires ~400 trains to replace it. Rotterdam receives on the order of 22000 containers/day, so you'd need a train to arrive every 3.6 minutes all day long to replace that. That much traffic requires 4 dedicated tracks all the way from Rotterdam to Shenzen.
You can have multiple cranes per track... Depends on how big the terminal is..
But 15 tracks is not something I have seen at a (intermodal)terminal, I see usually around 8 tracks.
I see more and more terminal pop-up in Eastern Europe that are connections between the Asian trainnetworks and the European networks. Specialising in moving containers from one track-system to another.
It is also possible to store containers 2 on top of each other, so in effect doubling capacity of a train. ( Something common in China and the USA, but not allowed in Europe)
There are already different routes from China into Europe, and more may be on the way.
Rob
How wide apart are Russian rails?
How wide apart are European rails?
Yes, the captain is still responsible for the ship and its cargo.I am surprised that the fine is not the other way around. It's my understanding that canal transits are under the direct authority of an onboard deployed pilot trained and employed by the canal operator...
Not so. The Canal pilots are strictly advisors under the terms of the passage contracts. The ship's Captain and crew retain all the authority and responsibility for actually operating the ship.
In theory, the pilots are supposed to give the captain suggestions or warnings. In practice, it seems like they are mostly there to collect bribes.
From agico group: (snipped the table)