Because Gordon Brown quietly told them to drop the space for the CTOL gear as he was desperate to get the cost of two ships down after wasting the design and build time for 5 years forcing the Warship builders into an unwanted merger by cancelling all other ships and offering the CVF as big carrots but dropped a clanger as still tried to use the 2003 price without 5 years of accumulated costs, more expensive steel taken into account.
The Carrier when ordered for construction were still 'Officially' interchangeable as the Final F-35 type selection wasn't due till 2011 as the F-35B had failed to prove itself at that point. That why the 2010 Defence review switched to F-35C and CATOBAR, the official stance was they Carriers were designed and were supposed built to be changeable, it was ony after that was announced did the ACA reveal what they had been instructed to do to focus ony on STOVL and that the switch would take a lot longer and cost a lot more (Plus any delays would be at the Govt expense and they would need compensation for the lack of work during the redesign thanks to the contract they agreed after the enforced merger !
.
And has ANYONE admitted to actually giving the order to drop convertibility ? Or, has anyone admitted to not telling the RN ?
.
Last edited by a moderator: