Advanced Transportation System Studies Technical Area 2(TA-2): Heavy Lift Launch Vehicle Development. Executive Summary; Volume 1 prepared by Lockheed Martin Missiles & Space Company for the Launch Systems Concepts Office of the George C. Marshall Space Fllight Center, July 1995.
Abstract:
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19960028972_1996058483.pdf
Abstract:
The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19960028972_1996058483.pdf