NASA Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) 1995

Triton

Donald McKelvy
Senior Member
Joined
14 August 2009
Messages
9,707
Reaction score
2,021
Website
deeptowild.blogspot.com
Advanced Transportation System Studies Technical Area 2(TA-2): Heavy Lift Launch Vehicle Development. Executive Summary; Volume 1 prepared by Lockheed Martin Missiles & Space Company for the Launch Systems Concepts Office of the George C. Marshall Space Fllight Center, July 1995.

Abstract:
The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 1, provides a summary description of the technical activities that were performed over the entire contract duration, covering three distinct launch vehicle definition activities: heavy-lift (300,000 pounds injected mass to low Earth orbit) launch vehicles for the First Lunar Outpost (FLO), medium-lift (50,000-80,000 pounds injected mass to low Earth orbit) launch vehicles, and single-stage-to-orbit (SSTO) launch vehicles (25,000 pounds injected mass to a Space Station orbit).

http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19960028972_1996058483.pdf
 

Attachments

  • HLLV.JPG
    HLLV.JPG
    86.9 KB · Views: 119
  • EHLLV.JPG
    EHLLV.JPG
    76.2 KB · Views: 102
  • LunarHLLV.JPG
    LunarHLLV.JPG
    75.5 KB · Views: 110
Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract, Technical Results; Volume 2 prepared by Lockheed Martin Missiles & Space Company for the Launch Systems Concepts Office of the George C. Marshall Space Flight Center, July 1995

The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19960027977_1996058482.pdf
 

Attachments

  • VTOLConcept.JPG
    VTOLConcept.JPG
    79.5 KB · Views: 68
  • VTHL.JPG
    VTHL.JPG
    86.8 KB · Views: 69
  • LiftingBodyVTHL.JPG
    LiftingBodyVTHL.JPG
    91.8 KB · Views: 37
  • LiftingBodyTankandPayload.JPG
    LiftingBodyTankandPayload.JPG
    94 KB · Views: 35
Advanced Transportation System Studies Technical Area 2 (TA-2): Heavy Lift Launch Vehicle Development; Program Cost Estimates; Volume 3 prepared by Lockheed Martin Missiles & Space Company for the Launch Systems Concepts Office of the George C. Marshall Space Flight Center, July 1995.

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19960028975_1996058479.pdf
 